Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.

Slides:



Advertisements
Similar presentations
Silicon Detector and Micromodule Production: Present Status.
Advertisements

sTGC for ATLAS Small Wheel upgrade
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.

June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Statistics 300: Elementary Statistics Section 6-2.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
CLEAN WATER 4 ALL Revolutionizing the way you view dirt.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Bump-bonding: offers F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra and Massimiliano.
Strasbourg status Ring 7 pilot run François Didierjean.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
Fast SLAM Simultaneous Localization And Mapping using Particle Filter A geometric approach (as opposed to discretization approach)‏ Subhrajit Bhattacharya.
Pull testing procedure. F ff ѲѲ 2f sin Ѳ = F If sin Ѳ = 30° then f = F If the angle of the 1 st and 2 nd bonds is 30° then the force we measure equals.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Wire Pull Test The wire pull test is performed using a Pull Tester (BT-14, DAGE 2400 PC, DAGE 4000) and a Pull Hook (performed by placing the hook 90°
S.Movchan Straw manufacturing and QC
T. Bowcock University of Liverpool
Bonding study of wrapping part of PA1/2
Status Report on Bonding at Catania
Ladder Assembly All tools and jigs produced Glue dispensing works
Investigation on tray MID 063 Back
ATLAS Upgrade Module Bonding Trials Using Glass Asics
HIC Assembly - Liverpool
UCSB Hybrid Bonding & Testing
Similar Figures Chapter 5.
Hamburg Bonding Report
A. Kaminskiy, CMS Tracker week , Apr 2004
Unexpected Failures of Modules on Rods
Module Failures on RODs
Module Production Status in Florence
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004

CERN, 20 Apr 2004Mirko Brianzi2 Bonding Setup in Florence Dage 3000 Delvotec 6400 There is a new Pull Tester in our system, now we are finally able to make good pull test.

CERN, 20 Apr 2004Mirko Brianzi3 Status Since March bonded 22 new modules (6 chips). For this L12p modules the loop height is very important, so it took a lot of time to set all the loop parameters and solve some problem. Now a new program for Delvotec is ready and it automatically bonds all the front side of the module, making all the loop shapes more reproducible (as much as possible). The failure rate for these modules has been 3fail/module because they are the first ones and we had to fix some problem, actually the last ones hadn’t any fail.

CERN, 20 Apr 2004Mirko Brianzi4 PA moving The main reason of failure is the PA not glued at the edge and this make often fail someone of the last bonds. Insert of teflon Making some pull test on bad bonds we can say that anyway too weak bonds are well visible. Solution:

CERN, 20 Apr 2004Mirko Brianzi5 Gold pad moving Similar problem bonding Bias to Filter Pad because the bond position is outside the Jig. support silicon end of jig bonds carrier Lateral View:

CERN, 20 Apr 2004Mirko Brianzi6 Dirt Sometimes bonding pads on PA are dirty and this has caused some fail.

CERN, 20 Apr 2004Mirko Brianzi7 PA gap For example… PA-Si gap can vary between 100µm and 220µm Very difficult to reproduce exactly the same loop height because the mechanical assembly of the module influence the bond loop

CERN, 20 Apr 2004Mirko Brianzi8 Vacuum Because the mechanical difference between each module, sometimes the vacuum flex the silicon during bonding… …so the central bonds can result 50µm higher (or more).

CERN, 20 Apr 2004Mirko Brianzi9 Readout bonds Loop heights are as much as possible (within the specifications) Specifications: min. 200µm max. 350µm?

CERN, 20 Apr 2004Mirko Brianzi10 Bias bonds Bonds in this module are too high but they have been corrected to 250µm. 370 Specifications: min. 200µm max. 350µm?

CERN, 20 Apr 2004Mirko Brianzi11 Filter bonds It’s very difficult to stay inside the specifications Specifications: min. 500µm max. 600µm In case that some bond is too low, we could accept it if it’s above a “safe limit” (350µm?). 3kV/mm (dry air) 500V=>170µm

CERN, 20 Apr 2004Mirko Brianzi12 Pull Test on PA Results of Pull Test on test bonds on PA for 8 modules: Mean force = 9.6g Standard deviations = g Abs. minimum value = 8.4g

CERN, 20 Apr 2004Mirko Brianzi13 Pull Test on Readout bonds Results of Pull Test on Readout bonds for 5 modules Mean force = 11.1g Standard deviations = 0.69 – 0.99g Abs. minimum value = 9.0g ( Correction Factor = 1.4 )

CERN, 20 Apr 2004Mirko Brianzi14 Pull test correction Measured geometry of bonds used for pull test to define the correction factor. Factors: 16°= °= °= °= °= °=1.00 Angles can vary depending on the exact point where the wire is pulled: 25°-27° for PA test bonds => factor = 1 16°-20° for readout bonds => factor = 1.4 These factors seems very high…

CERN, 20 Apr 2004Mirko Brianzi15 Pinholes after bonding Found after bonding 2 pinholes not present in the Database. 1 of them is probably caused by a fail during bonding. The correspondent bond have been removed… …in this case do we have to update the Bonding Database?

CERN, 20 Apr 2004Mirko Brianzi16 Conclusion New bonding program for Delvotec include also the automatic pattern recognition and it is fast and efficient (using some “trick” to avoid failure on PA). No problems with Data Base, it has been updated to the last version. Good and uniform pull test results.