Highway Reactive Maintenance Darren Coffin-Smith May 2014.

Slides:



Advertisements
Similar presentations
Practice Area 4: Participant Services, Financial
Advertisements

KPI Familiarisation.
1 Date: Northamptonshire County Council and Kier Getting it ‘right first time’ County Councils Network Annual Conference Annual Conference 19 th November,
Construction (Design and Management) Regulations 2007
HIGHWAYS MAINTENANCE IN BLACKPOOL An overview of the current situation.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
The real cost of modernisation Phil Hoare Head of Customer Support.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
London Streets...The Way Ahead Garrett Emmerson Chief Operating Officer: London Streets.
Lloyd’s Register Kazakhstan LLP Delivering Lower Risk, Improved Safety and Enhanced Business Performance Chris Renwick General Director Lloyd’s Register.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Members Seminar 15 September 2014 Flood Risk Christina Harrhy – Chief Officer, Neighbourhood Services Stephen Jarrett, Andrew Villars, Mark Strickland.
Introduction and Course overview by S. O. Duffuaa.
Problem Management Overview
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Risk Assessment – An Essential Standard
Introduction to Quality, Cost & Delivery
VAP What is a Virtual Application ? A virtual application is an application that has been optimized to run on virtual infrastructure. The application software.
Highways and Engineering Savings and Efficiencies Review November 2010.
Software Quality Chapter Software Quality  How can you tell if software has high quality?  How can we measure the quality of software?  How.
Indiana Digital Government Summit Service Delivery Manager
MFMA ASSET MANAGEMENT WORKSHOP ZANELE MNCWANGO National Treasury 24 November 2010 Infrastructure Maintenance.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Pavement Preservation Preventive Maintenance
Barriers in Improving HSE Culture
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Getting Climate Change Adaptation on the Agenda 7 December 2010 Gill Fenna - Quantum Strategy & Technology.
Should governments subsidise rail fares? To see more of our products visit our website at Steve Earley.
Traffic Management Act & NRSWA Impact on New Roads and Street Works Act 1991 Ellen Duffy Head of Street Works Branch Department for Transport Ellen Duffy.
Health and Safety – A Different Perspective Darebin Network – October 30th, 2014 Glenn Eckardt DEECD Senior OHS Policy Advisor.
Highways and Engineering Consultation Presentation.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Roger Williams Traffic Manager East Sussex County Council Traffic Management Act 2004 A highway authority view.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2015 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2015.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Analysis. Solution Requirements 1. Identify the functions and attributes of the website. 2. Write a problem statement. (What is the problem? What will.
JEETENDRA DAHAL MANAGER TECHNICAL SERVICES CITY OF PALMERSTON RISK BASED INFRASTRUCTURE INSPECTION SYSTEM.
Chapter 24: Developing Effective Operations QUALITY.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Unavoidable Impacts of Streetworks Legislation Jon Butterworth MBE Director, National Operations.
HIGHWAY INSPECTION CRITERIA All roads are inspected at least twice a year. The intervention criteria identifies all trips on the footway over 25mm to be.
Chapter 23: Making Operational Decisions. Operations Management The process that uses the resources of an organisation to provide the right goods or services.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
CONGESTION TOPIC GROUP Delivering the Highway Authorities Network Management Duty Steve Johnson Head of Network Management.
Introduction to OEE (Overall Equipment Effectiveness)
FINANCIAL SUSTAINABILITY OF WSPs: Overcoming the Barriers Eng. PETER NJAGGAH WASREB, Kenya Innovative Water Sector financing.7 th – 12 th November 2011,
What you need to know about handling major school works 5 th July 2013.
WAY FORWARD FOR CO-OP ORGANIZATIONS. DATE: MARCH 21 ST -23 RD 2012 VENUE: GABORONE, BOTSWANA.
Computer Analysts and Recovery Experts – Care.net.sg CARE understands that today’s IT in the business world is fluid hence the need to customize Server.
Complete the starter. Learning Objectives Lesson 1: Understand the concept of capacity How capacity is calculated Lesson 2: Over- utilization of Capacity.
Freedom of Information Requests. Information Management Framework Access to Information Access to Information Environmental Information Regulations 2004.
1 Ownership.Trust and respect. Inclusion and support. Sustainability. Innovation. Inspiration and passion. Paul Tysoe Asset Management Engineer Northamptonshire.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
Essential Requirements of Pool Management Companies
Optimisation Modelling for Roads through an Outsourced Service
Operational Objectives
Pothole Patching Alternatives
City of Abilene Pavement Condition Survey 2017 Results and Discussion
A ‘Value for Money’ monitor that takes account of Customer Satisfaction, Quality and Investment (also know as ‘3 legged stool’) .... helping.
Multi-Year Programming and Predictive Modelling
KPI Familiarisation
Optimisation Modelling for Roads through an Outsourced Service
ORR’s monitoring of Highways England Performance in RIS1 Lessons for RIS2 8 November 2017 Richard Coates.
Output specifications and payment mechanism
Monitoring Structures & Processes to ensure that the pothole reparation project across the 9 Provinces has the necessary delivery impact" 02 August.
Business Continuity Program Overview
Operationalization of a Public Works AM Strategy
Presentation transcript:

Highway Reactive Maintenance Darren Coffin-Smith May 2014

Background Deteriorating Network –More reactive repairs –Higher risk of claims –Temporary repairs –Poor customer satisfaction Investment deficit –Only 2% (Based on 12/13 figures) of network receives preventative or planned treatments per annum (50 year life cycle) –Therefore treatments need to significantly exceed their design life at current spending levels

Why do reactive repairs? Legal duty –Local Authorities have a legal requirement under the Highways Act (Section 41) to maintain safety for the road user Customer expectation –Customers want to see repairs that are timely and effective

What is a Pothole/Defect The ‘Code of Practice for Well Maintained Highways’ classifies a defect as either Category 1 (Emergency 24 hour repair) - those that require prompt attention because they represent an immediate or imminent hazard or because there is a risk of short-term structural deterioration. Category 2 (28 Day repair)- all other defects following inspection that do not represent an immediate hazard or risk but are still at intervention level.

Examples potholes A B C D E F

Why are defects are increasing? Extreme weather over the last 5 years Reduced funding in real terms –significant gap in funding to achieve steady state Roads deteriorated to a level where low value treatments are no longer viable. Increased and heavier traffic Little capacity to deliver larger patches within existing budget constraints

Why don’t repairs always last? Cold weather –Cannot undertake repairs in cold or wet weather Running water (Water ingress) –Washed out temporary repairs cause significant repeat reports Can’t undertake permanent repair in timeframe –Traffic management required No point undertaking permanent repair –Road service in such poor condition that only solution is resurfacing or major works Can’t afford permanent solution –Unable to undertake adequate works as budget not available but need to make safe (temporary repairs will be used until funding available).

Issues identified Continuing increase in defects High percentage of defects being reported by customer (reactive rather than proactive approach) Most repairs completed are temporary Lack of flexibility to respond to changes in demand (without impacting upon cost) Reduced output due to highly reactive nature of works – many works completed through 1 hour emergency process. Poor quality of initial repair Only smaller defects are repaired (those below 2m2)

The solution? Reduce temporary repairs –First time permanent repairs reduces repeat visits and increases performance of the repair New technologies –Velocity Patching –Improved specifications –Higher specification of treatments increases life cycle in-line with whole life costs Enhanced inspections –Increased walked/driven inspections –Reduces calls from the public and allows more efficient working practices

The solution? (Cont) Improved inspection training –Qualified competent staff lead to improved service Better reporting mechanisms –Improved internet and reporting site –Enhanced scripts for call centre Reduce impact of Utilities work –Improved inspections will reduce poor quality works Improves reinstatement performance Improves customer satisfaction

SMART teams First time quality repair (wherever possible) Defects repaired up to 20m2 Improved customer satisfaction Efficient and cost effective Increased output Area Officers have better ownership and flexibility in delivering the reactive service Improved contractor monitoring

Potholes / Patches Typical repairSMART team repair

Conclusion Continuing deterioration in highway network leading to increased volumes of calls & defects Increasing budget pressures Dependent on customer reporting for high % of the network (no call = no fix) Achieve more first time fixes of potholes by the contractor Utilise new technology/ treatments to improve efficiencies Asset Management critical if we are to achieve an efficient use of funding Need to manage expectations Continue to improve and enhance communication activity

QUESTIONS