Planning & Installation meeting New working group EDMS 1403771 15th October 2014LIU PLI meeting - J.Coupard1.

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
U.S. Department of Agriculture eGovernment Program February 5, 2003 eGovernment Working Group Meeting Chris Niedermayer, USDA eGovernment Executive.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 1. Some recent views ( ) 2 Linac tunnel
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
HL-LHC Organization: Now and post HiLumi
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
EVOLUTION OF BEAM CHARACTERISTICS DURING THE LIU PROJECT R. Garoby for the LIU Project Team March 7, 2012CERN.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
LHC machine integration experience PicoSEC-MCNet System Integration Training 26 th May Julie Coupard.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
LHC intervention scheduling with the Work Acceptance Tool
East Area Renovation Project Team meeting # 2 – EDMS News
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Injector De-cabling Project
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
LIU project M. Meddahi LIU Project Team: G. Rumolo, J. Coupard, H. Damerau, A. Funken, S. Gilardoni, B. Goddard, K. Hanke, A. Lombardi, D. Manglunki, B.
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
All Wales Safeguarding Procedures Review Project
Presentation transcript:

Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1

Planning & Installation meeting The mandate EDMS (extract) 1.Generate the detailed schedule of the hardware works relative to the LIU project within the assigned time constraints; 2.Plan the necessary manpower and coordinate the different teams in order to set up the logistics and permit the smooth execution of the works; 3.Ensure that the so defined time and manpower planning does not clash with all other concurrent activities potentially involving access to the same zones and/or the same teams; 4.Manage and follow-up the scheduled work during shutdowns and technical stops. 15th October 2014LIU PLI meeting - J.Coupard2 LIU Planning & installation coordination Activity coordinator: J. COUPARD Deputy coordinator: S. MATAGUEZ LIU Planning & installation coordination Activity coordinator: J. COUPARD Deputy coordinator: S. MATAGUEZ Coordination meeting: bi-monthly

Planning & Installation meeting 15th October 2014LIU PLI meeting - J.Coupard3 Work Packages LIU- Ions S. Gilardoni D. Manglunki LIU-Ions Coordination Meeting LIU-Ions Coordination Meeting LIU Planning and Installation Meeting J. Coupard Deputy: S. Mataguez LIU Planning and Installation Meeting J. Coupard Deputy: S. Mataguez Integration Y. Muttoni Integration Y. Muttoni Layout Database & Config. Management S. Chemli Layout Database & Config. Management S. Chemli Organization, Scheduling and Safety J. Coupard + safety coord. Organization, Scheduling and Safety J. Coupard + safety coord. LIU- PSB K. Hanke B. Mikulec J-M. Lacroix T. Birtwistle Scheduling D. Hay Safety Coord. C. Bedel Scheduling D. Hay Safety Coord. C. Bedel LIU- PS S. Gilardoni H. Damerau S. Maridor T. Birtwistle Scheduling S. Mataguez Safety Coord. Y. Beraud Scheduling S. Mataguez Safety Coord. Y. Beraud LIU- SPS B. Goddard E. Chapochnikova LIU-SPS Coordination Meeting LIU-SPS Coordination Meeting F. Galleazzi A. Kosmicki* F. Galleazzi A. Kosmicki* S. Bartolome Scheduling D. McFarlane Safety Coord. E. Paulat Scheduling D. McFarlane Safety Coord. E. Paulat J-M. Lacroix Linac3LEIR S. Maridor T. Birtwistle Scheduling D. Kuchler Safety Coord. Y. Beraud Scheduling D. Kuchler Safety Coord. Y. Beraud Scheduling J. Axensalva Safety Coord. Y. Beraud Scheduling J. Axensalva Safety Coord. Y. Beraud WBS 1.5 WBS 1.7 WBS 1.8 J-P. Corso Linac4 Coordination Meeting Linac4 Coordination Meeting S. Bartolome Scheduling J. Coupard Safety Coord. E. Paulat Scheduling J. Coupard Safety Coord. E. Paulat J-M. Lacroix Linac2 T. Birtwistle Scheduling C. Mastrostefano Safety Coord. Y. Beraud Scheduling C. Mastrostefano Safety Coord. Y. Beraud LIU-PS Coordination Meeting LIU-PS Coordination Meeting LIU-PSB Coordination Meeting LIU-PSB Coordination Meeting Surface build. A. Kosmicki

Planning & Installation meeting E-group LIU-PLI Team LIU-PLI-Team-MembersLIU-PLI-Team-Members The PLI meeting will be organized with PLI Team Members and dedicated Work Packages. Indico 15th October 2014LIU PLI meeting - J.Coupard4

Planning & Installation meeting EDMS documentation Nodes have been created under LIU – Project Management Planning (for approval) Integration studies presentations Integration and Planning nodes have also been created under Management of each LIU- PSB Upgrade, LI-PS, Upgrade, LIU-SPS Upgrade and LIU-Ions 15th October 2014LIU PLI meeting - J.Coupard5

Planning & Installation meeting General information webpage (Draft) 15th October 2014LIU PLI meeting - J.Coupard6

Planning & Installation meeting PLAN tool Even if PLAN tool will be reviewed and made available for April 2015, LIU-Project is well advanced and general lists of activities are available (EDMS ).PLAN toolEDMS We will start to write the document from now (Space reservation, Engineering Change Request, Functional Specification, Engineering Specification, Work Package Analysis, Installation Procedure, Tests Procedure) Information will be integrated into PLAN tool in due time. 15th October 2014LIU PLI meeting - J.Coupard7 LS1 Post Mortem LS2 Day PLAN is made available

Planning & Installation meeting “Bi-monthly” meeting 2014 : 4 meetings October 15 th : General Information, Configuration Management, Open Questions November 5 th November 19 th December 3 rd 2015 : 20 meetings January 14 th … 2016 : 20 meetings 2017 : 20 meetings 15th October 2014LIU PLI meeting - J.Coupard8

Planning & Installation meeting For next agenda: Follow-up of the documentation (Space reservation, Engineering Change Request, Functional Specification, Engineering Specification, Installation Procedure, Tests Procedure etc…) Specific subjects Configuration Management infrastructure for PS, SPS and IONs : decision on the EDMS structure Layout Database for all : decision on the versioning aC coating for SPS : specification of the work and groups involved 200 MHz for SPS : specification of the work and groups involved Group activities for the whole LIU Project (Linacs, LEIR, PSB, PS, SPS) 1.Listing of the activities per machine and Identification of the contributing groups 2.Work Package Analysis 15th October 2014LIU PLI meeting - J.Coupard9 MagnetsTE-MSCRF systemsBE-RFBeam Intercepting DevicesEN-STICivil EngineeringGS-SERadiation ProtectionHSE-RP Power convertorsTE-EPCBeam InstrumentationBE-BIElectrical systemsEN-ELAlarms, Access systemsGE-ASE VacuumsTE-VSCControlsBE-COCooling and VentilationEN-CV Injection/ExtractionTE-ABTTransport and HandlingEN-HE Machine InterlockTE-MPESurveyEN-MEF