March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.

Slides:



Advertisements
Similar presentations
Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Precision Drift Chambers for the ATLAS Muon Spectrometer
CLAS12 Drift Chamber Prototyping
DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Charged Particle Tracking for CLAS12
CLAS12 Forward Tracking: Status and Challenges
We started last December: 32 channels prototype “Julich like” to:
(On Behalf of CMS Muon Group)
WBS 1.03 Readout Systems Scope, Cost and Schedule
Dept. of Physics and Space Sciences, Florida Institute of Technology
Structure and etc Shoji Uno (KEK) at B2GM
WBS: : Tracking for CLAS12
IHEP group Shashlyk activity towards TDR
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
HPS Motherboard Electronic Design
Some proposals on HV circuits realization for segmented straw detector
CLAS12 Tracking Design (ca. 2005) a basic design parameters
Feb. 2, 2007 CLAS12 Upgrade Workshop Mac Mestayer
Limited Streamer Tube Project Summary
Presentation transcript:

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates —build “box” —insert feedthroughs —string chambers Cost and Schedule

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chambers Design: same concept as present chambers: NIM A449(2000)81 6 sectors, 3 regions 18 drift chambers sense wires drift chambers

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Endplates: many precise holes Number of Holes 4925 feedthrough holes 12 survey 3 datum & alignment 28 bolt & attachment 1.7 m First Order Placed -due back in March -large, modern milling machine

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Endplate Details mm true position  “50  m”

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Endplates fit into Frames Receive endplates - inspect - measure hole positions - clean - shim - bolt and glue into frames

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Chamber Ready to String Box Assembled endplates attached attachment brackets affixed Next mount on stringing fixture - insert feedthroughs - pre-tension - string wires - attach circuit boards - QA/QC

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Stringing Fixture

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Parts: wire  circuit board conductive rubber circuit board crimp pin feedthrough endplate signal routing: wires  pre-amp wire

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Stringing wires between “slanted” endplates endplates “gravity” stringing wires: 9 cm - 4 m long wires strung individually wires attached by crimping wires positioned by “trumpet”

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Steps in Stringing

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Installing Pre-tensioning Wires Pre-tensioning - before we start stringing - use springs on guard wires - gradual release of tension

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Stringing the Chamber

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Bussing Field Wires - under the circuit board - gold-plated copper wire - one “miscellaneous part” - e.g. 16,000 ft. - $ do this before mounting circuit boards

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Project Overview & Responsibilities Oversight: Jefferson Lab Design & Build Region 1: ODU Region 2: JLab Region 3: Idaho State Prototyping full-sized Reg. 1 prototype: Jlab, ODU plastic vs. metal-tipped feedthroughs: Jlab, ODU, ISU

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chamber Schedule PED

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber PED test prototype this summer

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chamber Construction Schedule 3 YEARS

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Details: Stringing the Chambers ~2 yrs./ 6 chambers ~1/2 time for stringing

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Estimate the time; use labor cost tables “Bottoms-up” estimate - based on previous experience 2 people, 15 mins. per wire for stringing “stringing” per se takes 1/3 to 1/2 of the time 3 crews of 5 stringers for ~ 2 years techs / scientists doing support, QA/QC “Top-down” - simple scaling of total elapsed time, accounting for fewer wires Costs: Stringing the Chambers

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Procurements/Expenses Task k$ stringing labor - estimate time - use labor rate

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber: Construction Costs PED: 0.34 M$ Const: 4.50 M$ Total: 4.84 M$

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chambers: Cost Same concept as present CLAS chambers Small extrapolations from current designs smaller cells, thicker wire, faster gas Cost estimates based on prior experience 180$ / sense wire : mechanical costs major cost is “wire-stringing” re-use most electronics Schedule and manpower allocation: prior experience Experts on staff and in CLAS collaboration

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Phenix DC’s (“jet-cell” type with 36 super-modules) Mechanical costs: $250/sense wire (but 7-8 other wires per sense wire) $50/total wire CLEO-c DC’s (“open-cell” with “square” cells) Mechanical costs: $40/total wire (labor not included) CLAS12 DC’s (“open-cell” with hexagonal cells) Mechanical costs: $180/sense wire $49/total wire (labor included) Cost Comparison: Other Drift Chambers

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer “Harder to do” Region 1: 7.5 mm cell; 1.8 m long wire Easier to do” smaller chambers 7 m endplate  4 m endplate chambers are flat stereo wires are all parallel sense wire: 20  m  30  m less breakage, easier to see ! Risks: Stringing the Chambers

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS Drift Chambers : History Operating successfully for ~10 years ….

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS Drift Chambers : History …. with good resolution mid-cell resolution is  m whole-cell average: 310, 315, 380  m; for R1, R2, R3 …. at the same voltage, with same efficiency  Ar/CO 2 shows no conventional aging

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Conclusions Large project: 18 chambers, 90K total wires Reliable design: should achieve resolution and efficiency goals Low risk cost and schedule: based on detailed knowledge from CLAS High probability of success: experienced people

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Broken wires more extensive “shake-down” better temperature control (already implemented) Circuit board corrosion go to encapsulated SIP’s better humidity control (partially implemented) finer segmentation (partially implemented) High current draw stricter irradiation procedures (already implemented) better humidity control (partially implemented) more HV channels (planned for near-term) Operational Problems & Solutions

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 / CLAS costs (not labor) ratio task CLAS12 DC’s have 70% as many wires Some tasks don’t depend on wire count

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chambers : Labor task man-weeks PED tasks

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Methods of Cost Estimation Endplates: cost = (a + b * nwires) * inflation; a =.2, b =.8 “boxes”: cost = old cost * 0.75 * inflation Wires, pins, feedthroughs; cost = old_cost * wire_ratio * inflation

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Recent cost estimates (06/-07) Recent Estimates from Tom Hartlove (with backup documents) Region I endplates, $36K (quote from Master Machine) Region II endplates, $50.6K (machined, quote from Stesalit) Region III endplates, (machined, quote from Martel Marine) Region I inserts, reduced tolerances, 80K $6.2K (~$0.08/part) (quote from 4slide) Field wire, 140um Al, $94.9K (~$0.9/m)(quote from CFW) Sense wire, 20um Tungsten, (~$0.69/m)(quote from CFW, probably cheaper from Luma) DC Wire Setup charges, $135/2000ft. i.e. fresh die every 2k ft.(quote from CFW) Region I crimp pins, 70K $95.2K (~$1.36/part)(quote from Medelec) Conductive rubber tubing, 100 $330 (quote from Chomerics) Prototype HV boards 6 $1120 (quote from Accurate Circuit)

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Possible Sources of Cost-Saving use “angle-iron” for chamber frames pros: won’t warp, much cheaper cons: need fixture to assemble full frame increase tolerance: stainless-steel “trumpets” pros: can find a willing vendor cons: may not be as accurate or take longer to accept

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Detailed CLAS Costs from P.O.’s Region II Endplates, $30K/plate, $420K Installer, $24.5K Stringing booms, $3K Scaffolding, $3.8K Attachment parts, $27K Trapezoid, $9.5K Strongback, $4.8K U-channels, $3K Posts, $11.2K Crane for cleanroom, $4.6K Cable supports, $20K Misc. stringing stuff, $13K Inserts, 125K $ 19.6K Crimp pins, 125K $19.3K Feedthroughs, 125K $17.5K Region I Boss Ring, $10k Prototype chamber, $49.5K Finite element analysis, $13.1K Additional prototyping costs, $9.2K Helmholtz coils, $14K Transport cart, $5K Endplates, 12 $50K Procure feedthrough assemblies, etc. $75K Procure parts, fabricate 6 chambers, $250K

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Original Detailed CLAS Costs from P.O.’s WIRE, all regions combined. Sense, 20um Tungsten, 118 km, $15.5K (~$0.13/m) Field, 140um Aluminum, 344 km, $357.1k (~$1.04/m) Guard, No records found. Bus wire, $7K Region III Skin connectors, $61.8K Skins, $234.9K Endplate material and machining, $400.2K Closure bars, $70.2K Hole inspection, $5K Alignment fixture materials, $17K Stringing platform, $36.3K Chamber to Torus mounting posts, $72K Eagle claws, $8K Transporter, $6K U-channels, $3K Inserts, 110K $31.3K (~$0.29/part) + additional parts from inferior vendor Feedthroughs, 122K $54K (~$0.44/part) Crimp pins, 152K $34.3K (~$0.23/part) Plastic plugs for rubber connectors, $0.9K Rubber connectors, $15K (approx.)

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer On-chamber electronics - 310K$ estimate Signal Translator Boards -- Board Only R1_STBQTY# SectorsTotalsCost EachTotal $ Layer 17642$315.00$13, Layer 27642$315.00$13, R2_STBQTY# Sectors Layer 17642$335.00$14, Layer 27642$335.00$14, R3_STBQTY# Sectors Layer 17642$375.00$15, Layer 27642$375.00$15, $86, STB Components Per BoardBoard MultTotal QTYCost Each HV Capacitors $1.25$34, PreAmp $3.00$72, Regulator $1.65$6, Power Connector1252 $1.75$ Output Connector $3.15$4, Resistors $0.05$ Capacitors $0.05$ $119,586.60

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer High Voltage Boards R1_HVBQTY# SectorsTotalsCost EachTotal $ Layer 17642$125.00$5, Layer 27642$125.00$5, R2_HVBQTY# Sectors Layer 17642$125.00$5, Layer 27642$125.00$5, R3_HVBQTY# Sectors Layer 17642$200.00$8, Layer 27642$200.00$8, $37, HVB Components Per BoardBoard MultTotal QTYCost Each HV Capacitors $1.25$3, Resistors $0.05$1, Solder Posts $0.25$1, $5,544.00

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer LOW VOLTAGE CABLE R1_STBQTY# SectorsTotalsCost/FtLength(Ft)Total $ Layer 17642$1.256$ Layer 27642$1.256$ Cable Connectors286168$1.50$ R2_STBQTY# Sectors Layer 17642$1.257$ Layer 27642$1.257$ Cable Connectors286168$1.50$ R3_STBQTY# Sectors Layer 17642$1.258$ Layer 27642$1.258$ Cable Connectors286168$1.50$ $2, HIGH VOLTAGE CABLE R1_STBQTY# SectorsTotalsCost/FtLength(Ft)Total $ Layer 17642$3.006$ Layer 27642$3.006$ Cable Connectors14684$5.00$ R2_STBQTY# Sectors Layer 17642$3.007$ Layer 27642$3.007$ Cable Connectors14684$5.00$ R3_STBQTY# Sectors Layer 17642$3.008$1, Layer 27642$3.008$1, Cable Connectors14684$5.00$ $6,552.00

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer PreAmp Output Cables -- (0.025" Pitch) R1_STBQTY# SectorsTotalsCost/FtLength(Ft)Total $ Layer $4.006$6, Layer $4.006$6, Cable Connectors $3.15$3, R2_STBQTY# Sectors Layer $4.007$7, Layer $4.007$7, Cable Connectors $3.15$3, R3_STBQTY# Sectors Layer $4.008$8, Layer $4.008$8, Cable Connectors $3.15$3, $51,861.60