1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.

Slides:



Advertisements
Similar presentations
SECTION DRAWINGS.
Advertisements

1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
By Dr. Julia Arnold
Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
3.7 Optimization Problems
Isometric and Oblique Pictorials
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
• Open a new part file • Create Cylinder
Volume.
Volume.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
1 Chapter 6 – Pictorial Sketching Print handouts Select File, Print Edit the following selections to read: Select the OK button.
EXAMPLE 6 Solve a polynomial equation City Park
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
You will learn to solve problems that involve the perimeters and areas of rectangles and parallelograms.
Pre-Algebra 7-7 Scale Drawings Learn to make comparisons between and find dimensions of scale drawings and actual objects.
Geometry Volume of Prisms and Cylinders. 9/11/2015 Goals Find the volume of prisms. Find the volume of cylinders. Solve problems using volume.
1.Tim is painting his living room with a new coffee colored Paint. There are 3 walls in the living room that measure 15 ft by 8 ft each and a fourth wall.
Using the Alphabet of lines. Drawing should be near bottom left corner. The front view shows how wide and how tall the object is.
Math 314 Spatial Sense. Topics Views Drawing Methods - Oblique - Opaque - Axiometric - Single Vanishing - Double Vanishing Solids.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
End Station Personal Safety Shutter TSC Design Presentation.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
HV connection for a Common GEM foil design Aiwu Zhang
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Scaling Three-Dimensional Figures
8-10 Scaling Three-Dimensional Figures Course 3 Warm Up Warm Up Problem of the Day Problem of the Day Lesson Presentation Lesson Presentation.
12.4 Volume of Prisms and Cylinders
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Cartoon Similarity Using cartoons to draw similar figures
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
1 Jim Thomas - LBL Inner Sector Upgrade for the TPC Jim Thomas Lawrence Berkeley National Laboratory UCLA Upgrades Workshop December 14 rd, 2011.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Geometry Constructing 3D shapes.
Chapter Area between Two Curves 7.2 Volumes by Slicing; Disks and Washers 7.3 Volumes by Cylindrical Shells 7.4 Length of a Plane Curve 7.5 Area.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
HE NgCCM integration issues Ianos Schmidt, August 26, 2015.
Graphical Language Basic Lines and Projections Scales Cross-Sectional Views and Sections.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Measuring & Drawing a Barbed Fitting
Angles of Elevation and Depression.
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
Status of GASPARD mechanics
ob-fpc: Flexible printed circuits for the alice tracker
In your work with two‑dimensional (flat) shapes, you have described their dimensions, their perimeters, and their areas.  For three‑dimensional shapes.
Hexagonal Pyramid cut at an angle #2
MEASUREMENT Given perimeter – find side length
Building a Nightstand Woods 1 Final Project Step #1
NIC v3.0 Mechanical Discussion
Introduction to MICROSCOPES & BIOLOGICAL DRAWINGS
STAR TOF MRPC Mass Production & Q.C. (USTC)
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
Measuring & Drawing a Barbed Fitting
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Cartoon Similarity Using cartoons to draw similar figures
Volume.
Bunker Wall Design Wall ESS
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
Presentation transcript:

1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge of the inner sector) Jim Thomas 10/15/2015

2 Jim Thomas - LBL Top View of an Inner & Outer Sector at STAR 60 cm 190 cm 24 sectors (12 on a side) Large pads good dE/dx resolution in the Outer sector Small pads for good two track resolution in the inner sector Grid Coverage is not complete

3 Jim Thomas - LBL Proposal to solve the “Grid Leak” requires a wall Put a wall between the inner and outer sectors, mount to the top edge of the inner sector Also need another wall at the bottom edge of the inner sector Wall is 1/16” mm thick Printed Circuit Board with Cu on both sides Thus, two walls with a wire to feed voltage to both walls DRAFT : Not to Scale Not for Construction

4 Jim Thomas - LBL Two walls required – same style and technology hi

5 Jim Thomas - LBL Conceptual Design of Notch to hold PCB Walls DRAFT : Not to Scale Not for Construction (dimensions are inches) ¾” by 0.070” notch is for mounting PCB board as the wall 1/8” deep auxillary channel is to carry up to 3 wires (1000V, 18 AWG)

6 Jim Thomas - LBL End View detail – note access path for wires Pad Plane Here Ribs Here Before adding notch

7 Jim Thomas - LBL Backup Slides

8 Jim Thomas - LBL Dimensions - recap Notches & Wall are on the same side of the sector as the PadPlane Wall will be 1/16” G10 and should fit comfortably into 0.070” notch Notch is full width at upper end and lower end of inner sector –Sector is 24.5” full width at top, 9.85” full width at bottom 0.070” deep 0.750” tall ¼” wide channel for wires, 1/8” deep –Wires go under the wall –So channel is 0.125” deeper than 0.070” cut for wall –Note addition of access path for wires … to go from side of sector, to backside of the wall Two rows of screws, first row is 1/8” below padplane surface, etc. –Use #6 screws, 2 inches apart, counter sunk into G10 wall

9 Jim Thomas - LBL Inner sector … upper end A portion of the (old) Inner Sector near the Inner – Outer sector boundary –In other words, the top edge of the inner sector Wall goes here

10 Jim Thomas - LBL Inner Sector … lower end Sometimes we call this the inner-inner grid leak –It requires an inner-inner solution We can build a wall that is very similar to the wall that goes between the inner and outer sectors –The only difference is the length of the wall Top Edge Full width is 24.5”, Bottom Edge Full width is 9.85” Wall goes here

11 Jim Thomas - LBL Conceptual Design of Notch to hold PCB Walls 0.750” 0.070” 0.250” 0.125” DRAFT : Not to Scale Not for Construction (dimensions are inches) ¾” by 0.070” notch is for mounting PCB board as the wall 1/8” deep auxillary channel is to carry up to 3 wires (1000V, 18 AWG)

12 Jim Thomas - LBL End View detail – note access path for wires Pad Plane Here Ribs Here Before adding notch 0.250” 0.25 Radius 0.750” #6-32 every 2”