THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.

Slides:



Advertisements
Similar presentations
THEMIS Instrument PDRRob Duck 1 UCB, October 15-16, 2003 EFI Axial Booms (AXB) Preliminary Design Review Rob Duck Mechanical Engineering Department and.
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
SPP Fields Antenna TRL6 Review Pre-PDR Mechanical Design Jeremy McCauley SSL UCB 7/18/2013 Current Configuration: SPP Spacecraft FIELDS, SPP-ANT-MEC-000.
IPC COMPONENT PLACEMENT
THEMIS Instrument CDR 1 UCB, March 24-25, 2004 EFI AXIAL BOOMS (“AXB”) Critical Design Review Rob Duck Mechanical Engineering Department Space Sciences.
Electronics. Solid snap together electronic connectors.
JWPF Connector Wire –to-Wire Wire –to-Board
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Crane Rental Association of Canada Quebec City, Quebec Presented by: Curt Jabben Sales Manager – Crane Products June 4, 2011.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California.
Setting up the Ricoh C305 Press F5 to start the Presentation
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
LPW Preamp/Sensor Overview Greg Delory, LPW Co-I MAVEN PFP Pre-CDR Peer Review May 10, 2011.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
Typical product developments and applications JF Daucourt Product Development & Quality Manager.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
Preamps (PRE) and Sensors Rachel Hochman John Bonnell Space Sciences Laboratory University of California, Berkeley CDR September 30-October1, 2009 RBSP-EFW.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
IPC In-Circuit Test Fixtures In-circuit test fixtures are commonly called bed-of-nails fixtures. A bed-of- nails fixture is a device with.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDR Bill Donakowski/ EFI Radial Boom 1 UCB, October 15-16, 2003 EFI Radial Boom EFI Radial Boom Mechanical (SPB Spin Plane Boom) Bill.
THEMIS Instrument CDR Bill Donakowski/ EFI Radial Boom 1 UCB, April EFI Radial Boom (SPB Spin Plane Boom) Bill Donakowski
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
CLAS12 Drift Chamber Prototyping
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
Preamps (PRE) and Sensors Rachel Hochman John Bonnell Space Sciences Laboratory University of California, Berkeley CDR September 30-October1, 2009 RBSP-EFW.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
IPhone 5S Parts By Customer Care:
THEMIS INSTRUMENT SUITE
ELECTRONIC ASSEMBLIES AND SOLDERING TECHNIQUE –PART II
Spacecraft Interface and I&T
826YD 21/2”-10”.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
Boom Electronics Board (BEB)
Hawkeye Mechanical Design Snapshot
University of California, Berkeley
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
880V 21/2”-10”.
Command and Data Handling
GLAST Large Area Telescope:
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University of California - Berkeley

THEMIS Instrument PDR 2 UCB, April 19-20, 2004 Ease of disassembly to facilitate replacement of parts. Tantalum radiation shielding for OP-15 Can. Minimal difference of parts for Spin Boom and Axial boom configurations. Angled forward surfaces (Top) to reduce photoelectron flux to wire. Angled rear surface (Guard) to reduce probability of hang up upon deployment. Electrical isolation of bias surfaces. Minimum input capacitance between sensor input and preamp structure. Thermal Predicts: -120ºC to +60ºC Mechanical Requirements & Specs

THEMIS Instrument PDR 3 UCB, April 19-20, 2004 Physical Characteristics All external parts to be gold plated and DAG 213 coated. Top Screw Fitting Guard Cable Holder

THEMIS Instrument PDR 4 UCB, April 19-20, 2004 Spin Plane & Axial Boom Preamps

THEMIS Instrument PDR 5 UCB, April 19-20, 2004 Exploded SPB Preamp

THEMIS Instrument PDR 6 UCB, April 19-20, 2004 Spin Plane & Axial Boom Preamps

THEMIS Instrument PDR 7 UCB, April 19-20, 2004 PC Board Subassembly

THEMIS Instrument PDR 8 UCB, April 19-20, 2004 Preamp Discussion Outline of changes since PDR Replaced Fuzz Button with Ferrule Spring and Spring Plate Improved reliability of electrical contact to sensor Facilitated trace routing on PC Board Modified tantalum Front Shield Improved reliability of electrical contact to sensor Facilitated trace routing on PC Board Changed to Mill-Max receptacles and pins Problems swaging Keystone pins to NASA requirements

THEMIS Instrument PDR 9 UCB, April 19-20, 2004 Preamp Issues & Concerns THE SPECIFIC SITE CONCERNS ARE BASED ON OUR PRELIMINARY THERMAL ANALYSIS. A MORE EXTENSIVE THERMAL ANALYSIS IS UNDERWAY AND SHOULD BE COMPLETED IN THE NEXT TWO WEEKS. GENERAL INSPECTION NOTES All items should be inspected both pre and post test. All places where dissimilar materials are joined. All bonded surfaces visually accessible. PC BOARD ASSEMBLY Inspect Ferrule Spring for fatigue or damage. Inspect Spring Plate for deformation and it’s solder joint. All surface mount components especially their soldered joints. Pin swaged joint. OP-15 soldered leads. Front Shield contact with PC Board. PREAMPS Primary areas of concern are large diameter plastic parts: * The Bottom (which has been addressed by splitting the ring). * The Sphere Mount particularly the site of the 0-80 Flat Head Screws. * The Socket Holder fit in the guard, the Mill-Max Receptacles for loosening, and the fit of the Can Shield in the Socket Holder. Bonding between Guard, Peek Stub, and Cable Holder. AXB PREAMP SPECIFIC - Threaded joint between Sphere holder with its threaded insert and the Sensor Tip Piece. SPB PREAMP SPECIFIC - Fine Wire Crimp. Mill-Max Receptacles & Pins Flight Approval Pending. (UCB QA/GSFC QA)

THEMIS Instrument PDR 10 UCB, April 19-20, 2004 Preamp Supporting Slide 1 PC Board Assembly Data AXB Preamp Data

THEMIS Instrument PDR 11 UCB, April 19-20, 2004 Preamp Supporting Slide 2 SPB Preamp Data

THEMIS Instrument PDR 12 UCB, April 19-20, 2004 Sensor Cable Fabrication New procedure synthesized from individual heritage procedures used on FAST, Polar, and Cluster for Cable Fabrication. Designed to allow Kevlar braid to take majority of mechanical load. Designed to protect majority of fine wires in Custom cable during fabrication, test and usage in orbit.

THEMIS Instrument PDR 13 UCB, April 19-20, 2004 AXB Cable

THEMIS Instrument PDR 14 UCB, April 19-20, 2004 SPB Cable

THEMIS Instrument PDR 15 UCB, April 19-20, 2004 Cable Fabrication SPB Cable (ETU Fabrication Experience) AXB Cable Same as SPB except without Distal Braid Wire (Step 1) and bead (Step 4).

THEMIS Instrument PDR 16 UCB, April 19-20, 2004 Cable Issues & Status AXB & SPB EMU Cables ready for integration into EMU units for thermal/vacuum and vibration testing. All Gore Cable in house. EMU Cable Fixtures 90% Complete. GENERAL INSPECTION NOTES All items should be inspected both pre and post test. Of prime concern is the electrical continuity of the cables. The resistance of each lead should be measured and recorded before and after testing. Where possible Preamp functional tests should also be performed pre and post test. Examine the cable for damage where it exist the Cable Holder. Examine the area around where the cable enters the inboard Airborn connector potting brackets for signs of pull-out. AXB PREAMP SPECIFIC Inspect the Preamp for any loosening on the Stacer Tip Flange. Inspect the cable for damage from it’s rapid spooling from the Bobbin. SPB PREAMP SPECIFIC Inspect the Bead for signs of pull out or damage and verify that the Distal and Proximal Braids are electrically isolated. Examine the wire loops protruding from the Airborn connector for damage.

THEMIS Instrument PDR 17 UCB, April 19-20, 2004 Cable Supporting Slide 1 THEMIS Cable Specification