1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.

Slides:



Advertisements
Similar presentations
Twisted Pair Cable Dense assembly (OD 5-7 mm) with –Twisted pairs : total 21; 44-pin mm dual row Omnetics connector differential signals single-ended.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
Ecal Connection board and Motherboard design. Connection Board Motherboard.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
INSTALLATION. PURPOSE To learn the basic steps of installing DS200 systems.
LHCb EP/LBD V. Bobillier 1 Cables and chicane mock up What we would like to define or test with the mock up: if the installation (of both cable.
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Long distance cable ( ) –Double DB9-to-DB9 cable (2x10 shielded twisted pair cable) SCEM –AWG28, Impedance 113 Ω –9.6 CHF/m.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
CMX Collection file for current diagrams 30-Apr-2014.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Mauro Citterio - Mi meeting
Calorimeter Mu2e Development electronics Front-end Review
ECAL Front-end development
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Update of MVD services and requests
DCS: Temperature Probes
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Christian Veelken last updated 11/09/06
Mini-drawers, FE-ASIC , Integrator
HPS Motherboard Electronic Design
Chamber Design and Integration RE3/1 and RE4/1
Electronics for RPC Upscope
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
VeLo Analog Line Status
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
SPD cable length and rack location
HCAL HV splice box.
Dr. Pierluigi Paolucci - INFN di Napoli
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
RPC Electronics Overall system diagram Current status At detector
Emerson CSI 6500 Interfacing Architecture Revision 01
Custom Mezzanine for the MTF7 Processor
Presentation transcript:

1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING - …

2 VELO integration INTEGRATION, december 05 PARTS : RPT CRATE - 5 RPT BOARDS PER CRATE - 24 RPT CRATES ON TANK - 4 DATAS cables - 1 TFC cable - 1 LV cable - 1 HV cable - 1 TEMP cable

3 VELO integration INTEGRATION, december 05 PARTS : RPT CRATE integration

4 VELO integration INTEGRATION, december 05 - cable 1 : from RPT card to Repeater Block (R-BL) : NG18 2x9 shielded twisted pair wire cross section: 1mm2 ext diameter: 16.5mm SCEM : cable 2 : from Repeater Block (R-BL) to Module Block (M-BL) NG28 2x14 shielded twisted pair wire cross section: 1mm2 ext diameter: 20mm SCEM : Sense-line cable : from Repeater Block (R-BL) to low voltage module (CAEN A3009) MCA26 13x2 shielded twisted pair wire cross section: 0.22mm2 AWG24 ext diameter: 11.4mm SCEM : PARTS : LV CABLES

5 VELO integration INTEGRATION, december 05 PARTS : LV CABINET 600 x 600 x 250 mm 4 CABINETS FOR VELO 1 CABINET FOR PILE-UP (still missing but smaller) INPUT CABLES : 20 x NG28 5 x MCA26 OUTPUT CABLES : - 20 x NG18

6 VELO integration INTEGRATION, december 05 PARTS : HV PATCH PANEL Could be reduced at 100mm Connector position could change Hv cable to RPT must be defined

7 VELO integration INTEGRATION, december 05 3D model used

8 VELO integration INTEGRATION, december 05 LV cabinet HV patch panel LV cable tray

9 VELO integration INTEGRATION, december 05 CRATE CABLING DATA TFC TEMP LV HV

10 VELO integration INTEGRATION, december 05 BOTTOM CRATE CABLING BOTTOM CRATE CABLES BOTTOM CRATE LV CABLES

11 VELO integration INTEGRATION, december 05 LV CABLES ROUTING Bottom crate LV cables Top crate LV cables

12 VELO integration INTEGRATION, december 05 STILL A LOT OF WORK : - Pile up LV caninet design - Cable trays on floor - DATA cables - HV cables - …