Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)

Slides:



Advertisements
Similar presentations
Introduction of trigger system: E906 as an example Shiuan-Hal,Shiu 05/02/
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Commissioning data are taken with individual chambers TP data autotriggered Cosmic rays data  ( different configuration) Different cosmic track angle.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Trigger rate studying Shiuan-Hal,Shiu. Introduction  Because the DAQ data taking rate only have 1000Hz, we must confirm the trigger rate will not higher.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Simultaneous Equations 8 January, 2016 What are simultaneou s equations Let me explain. If you have an equation like: x + y = 5, there are lots of answers.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Testing External Survey Automatic Credit Granting Shepherd University Department of Psychology.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
The SLHC CMS L1 Pixel Trigger & Detector Layout Wu, Jinyuan Fermilab April 2006.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Trigger Matrix Shiuan-Hal. Trigger (“times 4”) μ xhodoscopexhodoscope yhodoscopeyhodoscope discriminatorlevel shifter level 1 v1495 level 2 v1495 trigger.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
CLAS12 Forward Tracking: Status and Challenges
CLAS12 DAQ & Trigger Status
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
CMS EMU TRIGGER ELECTRONICS
Sector Processor Status Report
Simultaneous Equations
Presentation transcript:

Shiuan-Hal,Shiu To-do-list and schedule 1

Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1) Install a discriminator for RF signal and arrange the cable.(2) Check the output result in Lv1 and Lv2 module to make sure it fit our expect.(3) Test the connection between v1495 and slow control.(4) Test new FPGA code.(5) Driver for data readout.(6) Generate real beam FPGA code and test it.(7) Connect the v1495 output to trigger supervisor.(8)

Time table 3 Assume the beam will come in middle June. Today Beam Geometry and FPGA (3)Check lv1 lv2 (2)RF and Cable arrangement (1)Generate new trigger matrix (5)Test new FPGA code (4)Test connect with coda (6)Driver for data readout (7)Generate real beam FPGA code and test (8)Connect the output to trigger supervisor

4

Wire connection and internal delay and geometry Wire connection are all done, but I want make it looks more beautiful.(1~2 days) Internal delay measurement: Ting suggests that we can replace the v1495 modules by some TDCs and trigger it by NIM logic, then we can get the relative delay values about all the channels.(after the beam comes) Geometry and magnetic field strength: I have ask Paul about the geometry and magnetic strength this morning, and the answer is still not decided but he can give me the answer before this weekend. (3 days) 5

6

FPGA data collection and retiming part design RF connection? This morning I have asked Dr. Wu about the FPGA data-lost problem, he will come here to check the problem before this weekend. After Dr. Wu has repaired this I’ll spend 3days to test it. RF connection: Install a discriminator for RF signal in the experimental hall and test it.(1 day) 7

8

Trigger matrix logic and coding Trigger matrix and look up table for test beam are all done. Now, the Lv1 track finder will send the Pt information (bend plane) and station 4 hit pattern (non-bend palne) to Lv2 track correlator. I will spend 3 days to check all the Lv1 and Lv2 v1495 to make sure they work like we expect. Lv2 Trigger typeprescale muon pair Pt>4.0NO Two large angle muon in non-bend plane NO Two same sign muon in up and down plane YES Single muonYES 4.0>muon pair Pt>2.0 YES 2.0>muon pair Pt>0.0 YES 9

10

Connection with coda The connection between v1495 and trigger supervisor still not done.(2 days) Slow control: To prevent the FPGA and EPROM on v1495 damaged by radiation, we need to set up a method to make sure the firmware in all v1495 are correct all the time. We can connect the v1495 system with the slow control system, then use the slow control system to check the v1495 every minute. When the check process return some errors, then the system starts the recovery. The driver for slow control(upload firmware, reflash firmware, check firmware) are all done, but still not tested yet.(2 days) 11

Another things need to do Dr. Wu suggests an auto delay calibration to calibrate the internal delay for each v1495 channels. This calibration will save all fired pattern in v1495 in each trigger to our data stream. This process needs transfer some data in v1495 to coda. The driver is almost done, but without any test. I will spend 1 day to finish the driver for data readout. And discuss with Kaz to test the total dead time for this process. After we make sure this function can work I’ll start add the automatic timing adjustment into the driver. 12

For real beam 13 The only different between real beam and test beam for v1495 is the trigger matrix. For test beam the trigger matrix only contains the information of St.2,3,4. For real beam the trigger matrix contains the information about St. 1,2,3,4 and three out of four design. I’ll spend a week to finish the code generator for real beam and test it.