27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

Bill Christie For the STAR Collaboration MARCH 24,
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole (Dzhordzhadze) –RHIC Beam Experiments - (Pilat) –RCF Issues - (Throwe) Planning Meeting Web Site:

27 Mar 072 RHIC Run 7 as run/planned 12 Feb – cool-down begins 17 Feb – blue cold 20 Feb – 1 st beam in blue ring 23 Feb – Initial cold wave through yellow ring, not ready for beam 24 Feb – cryo problems, cool-down interrupted 26 Feb – cryo problems persist, begin warming up cryo plant 4 Mar – cryo back on 8 Mar – Blue cold again, ready for power supply setup/beam 12 Mar – Yellow cold, ready for power supply setup (lost 2.0 weeks) 13 Mar – Beam in Yellow, begin 10 day setup with beams 20 Mar – Begin ramp-up mode, overnight stores for experiments 26 Mar – Physics declared (Machine and PHENIX) ?? - STAR Physics 28 Mar – 1 st Maintenance day 27 Mar – physics mode, 100 x 100 GeV/n Au-Au 26 Jun –end physics (13.1 weeks), begin warm-up to LN2 30 Jun – RHIC Cryo switch to LN2 complete, end 19.7 weeks of cryo operation 3/20/07

27 Mar 073 End of Store – the present plan, 3/27/07 Begin first week with 4 hour stores with option for experiments to end store early or extend store – both experiments must agree or store will be terminated after 4 hours. After first week, each experiment calculates optimum store time for their experiment. We average the two times and take this as the nominal time at store. This calculation should be revisited at least weekly and details of the calculation defended at our Machine/Experiments Meeting. Experiments have the option to end the store early or extend the store – in either case, requires both experiments to agree, otherwise the store will end as scheduled. Consideration will be given to the NASA experiments. If the NASA experiments need a few more minutes (up to ~ 15 minutes) to complete an exposure the setup for the next RHIC store should be delayed to accommodate this. Minimum luminosity for Machine to keep store - TBD

27 Mar 074

5 1/3.4 loss in 3 hours

27 Mar 076 1/1.3 reduction factor in 3 hrs 2004 Run

27 Mar 077 1/4.4 loss in 3 hrs

27 Mar 078 1/1.6 reduction in 3 hrs 1/1.4 loss in 3 hrs 56 x 56 bunches

27 Mar 079 As of 26 Mar

27 Mar 0710 As of 26 Mar

27 Mar 0711 As of 26 Mar

27 Mar 0712 RHIC Machine/Detector Planning Meeting Next Meeting Tuesday, April 3, after Time Meeting T. Roser will moderate the meeting

27 Mar 0713 RHIC Machine/Detector Planning Meeting Archive

27 Mar 0714 PHENIX Goal STAR Goal PHENIX Goal (with Run 5 efficiency) 15 Delivered Integrated Luminosity [nb -1 ] Run-7 Au-Au luminosity projections 100 GeV/n 12.6 weeks with 26 June end of physics

27 Mar 0715

27 Mar 0716 RHIC Machine/Detector Planning Meeting Answer to Questions from the 6 Feb meeting (to be revisited) (1) Experiments – What are your luminosity goals for the Au-Au run, Delivered and Sampled? –PHENIX goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 2700  b -1 Sampled Luminosity = 1100  b -1 Assumes 68% live time, 60% vertex cut = 40.5% efficient However, Run5 efficiency factor was 25% (if so, the Run7 requirement is 4400  b -1 delivered) –STAR goals for 100 x 100 GeV/n Au-Au Delivered Luminosity = 1800  b -1 Sampled Luminosity = 300  b -1 with 60M usable min-bias events ~50% live time

27 Mar 0717 RHIC Machine/Detector Planning Meeting Answer to Questions from the 6 Feb meeting (to be revisited) (2) Experiments and Machine - If the Au-Au run goes well and luminosity goals are met with a week or two left to go, what should we do? –PHENIX Probably need 15 weeks to achieve Au-Au goals – highest priority pp development if well motivated/justified –Studies to maximize Run8 figure of merit –500 GeV development –STAR Low energy Au-Au development, collider issues, triggering… –Machine 1-2 days low energy Au-Au development at 0.5 injection energy pp development – –1 st priority new RHIC working point (needs ~2 weeks) –2 nd priority 500 GeV development

27 Mar 0718 As of 12 Mar