E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D on Cavity Integration and Test H. Hayano,
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Detail plan of S1-Global H. Hayano (KEK),
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
S1G Experiment Schedule Plan
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
MON TUE WED THU
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Construction and First Coo-down Test of cERL Injector Cryomodule
ANNUAL CALENDAR HOLIDAYS JANUARY FEBRUARY MARCH APRIL MAY JUNE
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Jan Sun Mon Tue Wed Thu Fri Sat
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
2008 Calendar.
S M T W F S M T W F
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
1 - January - Sun Mon The Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
January MON TUE WED THU FRI SAT SUN
TTC meeting, Milano Global Design Effort
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Cavity Degradation Experience at S1-Global
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2008 Calendar.
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 2 High field performance of 8 cavities Lorenz detuning at flat-top Schedule in Nov. and Dec., LFD compensation by KEK hardware 2. Dynamic heat load measurements in each cavity, 4 cavities, 8 cavities 3. LLRF control exp. in 8 cavities Schedule in Jan. and Feb., DRFS (distributed RF system) exp. Outline

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 3 MHI-09 MHI-07 MHI-06 MHI-05AES004ACC011Z108Z109 FNALDESY KEK Vertical Test ave. 30 MV/m 2010’ Oct. 21 Flat-top = 1.0 ms, 5 Hz Comparison of VT and CT Cryomodule Test ave. 28 MV/m

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 4 Comparison of VT and CT Severe degradation of 9~12 MV/m in ACC011 (FNAL) Z108 (DESY) ave. Eacc,max = 25.3 MV/m (Cryomodule-C) ave. Eacc,max = 30.4 MV/m (Cryomodule-A)

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 5 Lorentz detuning experiments A1/MHI MV/m A3/MHI MV/m A2/MHI MV/m A4/MHI MV/m FB/on, Piezo/offFB/off, Piezo/offFB/on, Piezo/off  f ~100Hz  f ~300Hz  f ~150Hz

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 6 Lorentz detuning experiments C1/AES MV/m C3/Z MV/m C2/ACC MV/m C4/Z MV/m FB/on, Piezo/offFB/off, Piezo/offFB/on, Piezo/off  f ~450Hz  f ~200Hz  f ~300Hz

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 7 Lorentz force detuning at flat-top (Preliminary)  f in KEK cavities is approx. 1/3 of that in DESY/FNAL cavities due to an improved stiffness in the cavity-jacket structure.

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 8 November, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun A-1A-2A-3A-4 Dynamic Loss Meas. Lorentz Detuning Compensation A-1/C-1A-2/C-2A-3/C-3A-4/C-4 C-1 C-2C-3C-4 Dynamic Loss Meas. (Holiday) Repair of Cryogenic System Delay from original schedule is 3 ~ 4 weeks. original

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 9 December, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun Warm up DRFS Preparation Heat Load at 2K Calibration by Heater LLRF 8 cav. Dynamic Loss 8 Cavity Control 4 Cavity Control A 4 cav.C 4 cav. Dynamic Loss (under discussion)

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 10 January, 2011 Sun Mon Tue Wed Thu Fri Sat Cool-down Start Heat Load Meas. at 4K to 2K Cavity Performance Check fo, QL, Eacc,max, piezo Holiday (under discussion)

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 11 February, 2011 Mon Tue Wed Thu Fri Sat Sun Milano DRFS (1) DRFS (2) Cavity Performance Tests Warm up Holiday DRFS (3) (under discussion)

E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 12