SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

Location: No 4 sharafadeen shoyege Magodo Estate Lagos Nigeria
SOUTHERN UNIVERSITY at NEW ORLEANS Today, Tomorrow, and Beyond! How the Campus Will Look, and When Southern University at New Orleans Master Programming.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
2012 Town Hall Meeting. Parish History Master Plan Phase 1 Costs Next Steps Parish Survey 2012 Town Hall Meeting Questions + Answers Agenda.
Master Builders of Iowa Construction Industry Convention 2012.
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Saratoga Cottage - Addition F INAL S KETCHUP R ENDERINGS SketchUp I Elsiana Zhaka Charles J. Agro May 12, 2014.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update.
Rebuild Stafford High School Update- October 2014.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
UO Lewis Integrative Science Building CUG Meeting - Schematic Design Wednesday, October 7.
Community Update James Simons School – October 2,
LISHA A BROWN 1 LIGHTING SCHEMATIC DESIGN PRESENTATION SHEPHERD UNIVERSITY WELLNESS CENTER.
University of Oregon Lewis Integrative Science Building Schematic Design October 21, 2009.
Phase Difference = Phase Difference = 0.05.
Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Lodges at West Edge Site Plan Amendment October 22, 2014.
Building Plans.
Enumclaw High School Pre-Design Workshop 6 March 11, 2015.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Schematic design presentation School of Business South Hall Renovation.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Co-Housing Design Project in Point St. Charles Krys Wodzicki # Design Project I Professor P. Sijpkes April 18th, 2000.
THE CATHOLIC UNIVERSITY OF AMERICA WASHINGTON DC SOUTH CAMPUS REDEVELOPOMENT ABDO DEVELOPMENT, LLC proposed by ABDO DEVELOPOMENT, LLC designed by TORTI.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Example NAMEROLE Ron LilleyProject Manager ???Project Inspector ????County Planner ????Zoning Inspector HBACivil Engineer ????Architect ????Mechanical.
Design Development Review
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
HIGH SCHOOL PROJECT PLANNING MEETING October 14, 2013 Crabtree, Rohrbaugh & Associates, Architects Agenda Schematic Design Concept D Option – 1 Site Floor.
Presented by Kristen Hwang. 1. Client Profile Preview 2. Overview & Key features of the house 3. Floor Plan 4. Section Views(North/South) 5. Material.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Elevations McMillan Villas May 30th 2015.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan.
New Fabra Elementary School Design Presentation. Play Field Playground Bus Loop Staff Parking Parent Drop-off Parking Johns Rd. Lattimore Blvd. Secure.
Design Progress Presentation New Collinsville Elementary School October 20, 2015.
St. Cloud High School Phased Comprehensive Construction Project April 28,
GARFIELD HIGH SCHOOL Concept Design School Board Presentation Concept Design School Board Presentation.
North Augusta High School Design Development Presentation.
Bentz / Thompson / Rietow BSU ACADEMIC LEARNING CENTER & CAMPUS RENOVATION Bemidji State University Academic Learning Center & Campus Renovation October.
ETHS Wings Access ETHS. ETHS Wings WEST WING Boltwood School Orange Wing W – classrooms Invest Tutoring, Homework Center, AVID.
County Commission: Preliminary Design Aerial Photo GRACE Marketplace One Stop Homeless Assistance Center Phase-1.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
MONICA FRANCO. REI FLOOR PLAN Since the space was very huge, it was impossible for me to actually plan the interior space of it. Therefore I decided to.
ICEE Internship International Center for Engineering Education Project: Virtual Reality Environment of a Building Construction Timeline By: Marc Brana.
White Pigeon Community Schools
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Multipurpose Cultural Center
Drawing & Building Names
Graduation Project 2 Redesigning a Villa
21st Century School Buildings Plan
Thatch House (Plan) Fig.4.
MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER
CAVE SPRING HIGH SCHOOL SITE PLAN JOB NO NOVEMBER 27, 2017
Similar Right Triangles
Sandy Grove Middle School
North Augusta High School – Phase 2A and 2B
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Project Update – High School Additions & Remodeling
Presentation transcript:

SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2

Red Rock High School – Overall Master Plan

Site Plan: Auxiliary Gym, Performing Arts Center, and Amphitheater

Amphitheater

Amphitheater: section

Existing Main Gymnasium

Floor Plan

Red Rock High School Gymnasium Floor & Striping Acoustical Panels

West Elevation

Birdseye View

Back entry to vestibule Perspectives South elevation with canopy

WEST SEDONA SCHOOL & SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2