UPPER HUMBER ENC TRIAL Nov 2012 – Oct 2013 Andy Hinton – Geographic Manager England East and South.

Slides:



Advertisements
Similar presentations
CARIS S-57 Composer An Introduction
Advertisements

Confluence Wiki Implementation? 14 June Agenda What? Why? Wow! How? When? 2.
Development and Impact of Inland ENCs/ECDIS on Hydrographic Offices Denise LaDue, USACE.
Office of Coast Survey IHO S-100 and S st Century Framework Data Structure for Hydrographic and Related Data.
Meeting customer requirements – Constraints faced by Service Providers
Page 1 A Grieg Group Company. Page 2 A Grieg Group Company T&P from UKHO, called AIO The Admiralty Information Overlay brings the convenience and completeness.
The IHO Data Registry (S-100) Supporting e-Navigation and Maritime Spatial Planning International Hydrographic Organization.
Thomas Christensen Danish Maritime Authority, ACCSEAS Project
What’s New - CARIS AML Production Tools
By Freddy Delchot Manager Nautical Affairs Maritime Authority Suriname.
US Army Corps of Engineers BUILDING STRONG ® Welcome Hydro Survey Chart Modernization.
PPUs and Electronic Charts, Southampton 12 May 2011 bathymetric ENCs (S-57 based bathy layers) Friedhelm Moggert-Kägeler, SevenCs GmbH.
National status and activity report Romania Belgrad, December, 2012.
National Report of Trinidad and Tobago December 2014
Creating a GIS from NOAA Electronic Navigational Charts
S IHO Geospatial Standard for Hydrographic Data
The Premier Software Usage Analysis and Reporting Toolset Maximizing Value for Software Users.
Regulations & Requirements
VIEW OF CAPACITY BUILDING FROM RECIPIENT COUNTRY - BANGLADESH BANGLADESH NAVY HYDROGRPAHIC DEPARTMENT Monaco 08 Oct 2014.
Update on CARIS AML Production Tools NATO GMWG Technical Session Lo-Skolen, Helsingor, Denmark Speaker: Christian Fellinger March 2005.
Electronic Navigational Charts (ENCs) Captain Jim Gardner Chief, Marine Chart Division Office of Coast Survey National Ocean Service.
1 Adhoc AML Generation by SevenCs The Source of ECDIS March 2005.
Nautical Chart Products – NOAA Hydro Training 2009 Nautical Chart Products.
1 ENC Encryption/ISO Julia Powell Office of Coast Survey Marine Chart Division.
9/21/2015 UNCLASSIFIED 1 Supports: –Marine navigation –Mission planning –Geographic Information Systems Digital Nautical Chart (DNC) Relational database.
C-MAP Norway AS One Stop Shop for Nautical Information FARGIS Seminar Oslo 16/17 March,2004.
Hydrographic Survey Software for Windows.  Eye4Software B.V., based in the Netherlands was founded in  More then 15 years of experience in Hydrography.
KIRIBATI National Report
AUTOMATION OF WEB-FORM CREATION - KINNERA ANGADI – MS FINAL DEFENSE GUIDANCE BY – DR. DANIEL ANDRESEN.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
International Hydrographic Organization Electronic Navigational Chart (ENC) - ENC Coverage Analysis - Captain Robert Ward, Director IHB.
Presentation to the International Ice Charting Working Group 22 November 2007 Ice In Electronic Navigation Charts (ENCs) (A Status Report)
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
National Report of Turkey MBSHC-19 Batumi 30 June-02 July 2015.
1 UNCLASSIFIED NGA Geotagging Project Update Michael Kushla 2 July 2015 UNCLASSIFIED 1.
Office of Coast Survey NOAA ENC ® Online Service Leland Snyder NOAA Office of Coast Survey NMEA 2015 Conference & Expo September 24, 2015.
The Benefits of a Hands-on Approach to S-100
Navigation NAU 102 Lesson 5. Chart Editions You must use the latest chart! Date and Edition Number are on the chart New editions issued due to many changes.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
ENC EDITOR.
30 July 2004USM 2004 Upper Pearl Survey1 Preparation: Line Building (Skiff) Outermost line: As close to the river bank as possible.
THE IMPORTANCE OF HYDROGRAPHY MACHC Technical Workshop, Cartagena, Colombia, 30 May 2005.
Australian Hydrographic Service National Report
Coast Survey Mobile App
Standards” and by the Council key Priorities
Future of the Paper Chart
NOAA’s Nautical Charting Products and Services
Capability For Hydrographic Capacity Building: Industry Partnering
Mandatory ecdis Will the directive lead to a threat,
International Centre for Electronic Navigational Charts
A Cooperative Effort Since 1963
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
14th South West Pacific Hydrographic Commission Conference 30 November – 02 December Noumea, New Caledonia
International Centre for Electronic Navigational Charts
Hydrographic Data as a Service
National Report of Trinidad and Tobago November 2018 MACHC 18
MesoAmerican and Caribbean Sea Hydrographic Commission
Cartagena de Indias, Colombia
16th Meeting of the South West Pacific Hydrographic Commission
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
IHO Secretariat, Monaco, November
Identification of port, terminal, berth and berth position
A New Approach for Applying Bathymetry to Nautical Charts
Hydrographic Services and Standards Committee
Added Value to NOAA’s Bathymetry Products
IEC Activities affecting HSSC Hannu Peiponen Chair IEC TC80
NORDIC HYDROGRAPHIC COMMISSION (NHC)
Hydrographic Services and Standards Committee
Sunset of NOAA Raster Chart Production
Presentation transcript:

UPPER HUMBER ENC TRIAL Nov 2012 – Oct 2013 Andy Hinton – Geographic Manager England East and South.

Introduction and Background – why the Trial was conducted. Description of our new Hydrographic database system. Trial itself – how the product and service evolved over time Conclusions/ key lessons learnt Further work and applications Upper Humber ENC cell presentation.

Humber Bridge to Goole on River Ouse and Keadby on River Trent Goole – UK’s most inland port th in world 1600 commercial vessels - 80% ECDIS fitted Accommodates vessels of 5.5m draught INTRODUCTION: AREA IN QUESTION

Dynamic hydrographic environment. Tortuous navigation Surveyed by ABP Humber on very frequent basis : 2 weeks 6 weeks 8 weeks ABP HUMBER SURVEY SCHEDULE.

ABP Humber output Survey – 2 weeks (Tuesday) New Ships course Autocad and pdf sheets Buoy moves (Friday) Chart - 2 months

Paper chart 3497 – 1:50,000 ‘Unchartable’. Traditional system - cannot cope with speed of change. Paper chart NMs - 12/15 days, New Edition - 5 to 7 weeks ENC updates - tied into paper chart NM timeframes. UKHO CURRENT CHARTING.

REASONS FOR THE TRIAL. Introduction of the Hydrographic Database Berth to Berth ENC service top 1000 ports. 80% vessels using river have ECDIS fitted. MAIB report – Sea Mithril 2007.

Hydrographic Database (HDB) Incoming data Source Database Paper Chart Editor Product Editor Paper Chart NMs NEs AMLs ARCS ENC Updates NEs HPD CARIS HPD – Database approach. Source database (S57) – updated real time. Breaks link between paper charts and ENCs Humber area rolled into HDB in 2010/ 2011.

THE TRIAL : PRODUCT CREATION. APRIL TO NOV 2012 Agreed to conduct Trial – February 2012 Two targets – Update ENC in two working days Had to enhance navigation. Product creation - Scale 1:25,000. Critical features - Ship’s course, buoyage, coast, wrecks, Topography – enhanced Hydrography – General backdrop. Ship’s Course/ Buoyage updated -14 days ed out to ABP Humber 9 th November

HUMBER ENC VERSION 1 9 th November Ship’s course Buoyage General Hydrography No depths

HUMBER ENC VERSION 2 10 th Jan 2013 All soundings Unsurveyed outside Update 2 working days. Presentation issues

HUMBER ENC VERSION 3 February 2013 Contours only – 15 Ships course/ Buoys Depth reassurance issue

HUMBER ENC VERSION 4 (FINAL) April 2013 Basic depth into. Contours Decimetre 0.5 dry to 1m. Ships course/ buoy

UKHO: Conclusions/ Lessons learnt. Production and Maintenance System. Automation. System performance. Port Authority/ survey contractor – technical capability.

Further work. Non technical aspects Commercially viable ? Licensing/ distribution ?. Future applications Unchartable areas. ENC Berthing cells.

Upper Humber ENC Cell. Andrew Hinton.

ABP Humber Survey Team Conduct survey Survey processing and analysis. Decide new buoyage and ships course Create updated chart with new course and buoyage. Conduct Buoy moves. Day 1 Day 2 Day 3 Day 4 UKHO Alerted survey imminent from NM Two day target Import data, create surface, auto contouring & sounding selection. Delete existing features and replace. Verification and validation checking of cell. ABP Pilots Issue NM shoals xyz and dxf file Issue updated chart New edition of ENC. New edition of ENC ( ) PROCESSING CYCLE - FORTNIGHT