Transport & Handling of Detectors TAN Workshop S. Prodon – 10.03.2006.

Slides:



Advertisements
Similar presentations
Time-Labour Analysis for the use of Overhead Gantry Cranes in Modern Steel fabrication workshops. By David Rolle. MD. Rimco Building Systems Pty. Ltd.
Advertisements

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Froland Transportation, Inc. Established in 1991.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
R. Rinaldesi, K. Kershaw – HE Group
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Transport and handling at CERN for FAIR
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
CHAPTER 23 Delivery and transport systems. 2 R. Delaney Transport / Delivery Systems A good transport and delivery system is essential to ensure: 1.Safe.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Constraints Space Load Capacity Costs Operating hours.
Test beam check list Michael JECKEL EN-EA-EC.
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
CLIC Handling Engineering Update
Updated Design of Detector Hall
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
TAXS and TAXN ABSORBERS - OVERVIEW
NA62 LAV Anti1 REMOVAL & TESTS
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Interaction Region Alternative Layouts
A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC
Lifting & Rigging Continuing Education Fourth Quarter 2016
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Safe Rigging Practices
Accelerator and Experiment Interface Session: LS2, LS3
Test beam check list Michael JECKEL EN-EA-EC EDMS:
Swap Container An innovative demountable body concept for vehicles with mechanical suspension...
Behind every great leader company there was an even greater logistician…. Fast Logistics L.L.C Freight Forwarding, Transportation, Custom Clearance, Logistics.
DHL Delivery Processes
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Customised solutions for the logistics industry
T-489: Induced Activity and Residual Dose Rates
Presentation transcript:

Transport & Handling of Detectors TAN Workshop S. Prodon –

Table of content Unloading at CERN Unloading at CERN Handling at test facilities Handling at test facilities Surface Transport Surface Transport Lowering into the LHC tunnel Lowering into the LHC tunnel Underground Transport Underground Transport Detector installation Detector installation - Removal of copper bars - Detector insertion into the TAN Handling operations after 1 st beam Handling operations after 1 st beam Unloading at CERN Unloading at CERN Handling at test facilities Handling at test facilities Surface Transport Surface Transport Lowering into the LHC tunnel Lowering into the LHC tunnel Underground Transport Underground Transport Detector installation Detector installation - Removal of copper bars - Detector insertion into the TAN Handling operations after 1 st beam Handling operations after 1 st beam

Detector unloading at CERN Option 1: Unloading at the place of destination on CERN site - Condition: single element on the truck - Procedure: Custom duties Registration at CERN goods reception Unloading of the truck at the place of destination - Handling means: forklift - Recommendations: Be present during the unloading Inform the forklift driver of the fragility of the detector Option 1: Unloading at the place of destination on CERN site - Condition: single element on the truck - Procedure: Custom duties Registration at CERN goods reception Unloading of the truck at the place of destination - Handling means: forklift - Recommendations: Be present during the unloading Inform the forklift driver of the fragility of the detector

Detector unloading at CERN Option 2: Unloading at CERN goods reception - Condition: standard procedure - Procedure: Custom duties Unloading at CERN goods reception CERN transport from the goods reception to the place of destination - Handling means: lowered truck 24 hour delivery time - Recommendations: Inform our service of the fragility of the detector Option 2: Unloading at CERN goods reception - Condition: standard procedure - Procedure: Custom duties Unloading at CERN goods reception CERN transport from the goods reception to the place of destination - Handling means: lowered truck 24 hour delivery time - Recommendations: Inform our service of the fragility of the detector

Handling at test facility Are you going to test your detectors at CERN ? If the answer is yes - Handling conditions at CERN: Need of an authorisation to drive forklifts and overhead travelling crane Support form handling teams at request (EDH) - Handling specifications: see specifications for installation Are you going to test your detectors at CERN ? If the answer is yes - Handling conditions at CERN: Need of an authorisation to drive forklifts and overhead travelling crane Support form handling teams at request (EDH) - Handling specifications: see specifications for installation

Surface transport Journeys - Goods reception -> Test facility - Test facility -> Storage facility - Storage facility -> Lowering point Transport specification - Procedure: internal transport request (EDH) Delivery time: 5 working days - Transport conditions: Conditioning (preferably original conditioning from arrival at CERN) Vibration and acceleration specifications ? Shock monitoring system ? Journeys - Goods reception -> Test facility - Test facility -> Storage facility - Storage facility -> Lowering point Transport specification - Procedure: internal transport request (EDH) Delivery time: 5 working days - Transport conditions: Conditioning (preferably original conditioning from arrival at CERN) Vibration and acceleration specifications ? Shock monitoring system ?

Lowering into the LHC tunnel Lowering points - SD1 for point 1 - SDX5 or SD6 for point 5 (depending on detector conditioning) Handling means - Lift Lowering points - SD1 for point 1 - SDX5 or SD6 for point 5 (depending on detector conditioning) Handling means - Lift

Underground transport Journey - Lift -> installation place Transport specification - Procedure: internal transport request (EDH) Delivery time: 5 working days - Transport means LHC trailer - Transport conditions: Risk of vibration Possibility of special rubber if necessary Journey - Lift -> installation place Transport specification - Procedure: internal transport request (EDH) Delivery time: 5 working days - Transport means LHC trailer - Transport conditions: Risk of vibration Possibility of special rubber if necessary

Detector Installation Handling means: LHC special forklift

Detector Installation Handling simulations

Detector Installation Handling simulations

Detector Installation Handling simulations

Detector Installation Handling simulations

Detector installation Removal of copper bars - Handling means LHC forklift Slings Dedicated lifting hook - Interfaces Lifting hook to be defined o Simple to use o Easy and fast to enter in the copper bar o Limit human interventions in the vicinity of the TAN Removal of copper bars - Handling means LHC forklift Slings Dedicated lifting hook - Interfaces Lifting hook to be defined o Simple to use o Easy and fast to enter in the copper bar o Limit human interventions in the vicinity of the TAN

Detector installation Detector insertion into the TAN - Handling means LHC forklift Slings - Prerequisites Identification of the center of gravity 2 lifting points on the top of the detector Preferably slewing rings Location: each side of the center of gravity (in the longitudinal direction) Maximum distance between the 2 lifting points: 200 mm Allow a flat lifting of the detector 3 mm clearance Detector insertion into the TAN - Handling means LHC forklift Slings - Prerequisites Identification of the center of gravity 2 lifting points on the top of the detector Preferably slewing rings Location: each side of the center of gravity (in the longitudinal direction) Maximum distance between the 2 lifting points: 200 mm Allow a flat lifting of the detector 3 mm clearance

Handling operations after 1 st beam Limit staff exposure to radiations: - Efficient lifting hook for copper bars - No jamming during lifting operation (need of precise lifting points) - Transport conditioning for copper bars and detector (i.e. lead storage compartment) Limit staff exposure to radiations: - Efficient lifting hook for copper bars - No jamming during lifting operation (need of precise lifting points) - Transport conditioning for copper bars and detector (i.e. lead storage compartment)

Conclusion Anticipate lifting interfaces Simple lifting systems Anticipate handling operations after 1 st beam (radiations) Anticipate lifting interfaces Simple lifting systems Anticipate handling operations after 1 st beam (radiations)