20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Global Design Effort Dubna, 5 June 2008 Part I of Summary for WG C/D Conveners: Ewan Paterson (SLAC), Nikolay Solyak (FNAL), Andrei Seryi (SLAC), Masao.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
26 Feb 2007 R & D Meeting Global Design Effort 1 RTML (2.6.1) and Main Linac Beamline Design (2.7.1) PT SLAC.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Ring to Main Linac (RTML): Status and Plans ILC January Meeting (KEK) Peter Tenenbaum 19-Jan-2006.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Emittance preservation in the RTML of ILC and CLIC Andrea Latina (CERN) Nikolay Solyak (FNAL) LCWS University of Texas at Arlington - Oct
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Cost Impacts of Reduced # Bunches per Train purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius, Fermilab.
07 June 2006Peter Tenenbaum1 Ring to Main Linac and Low Emittance Transport SLAC DOE Review Accelerator Breakout.
Global Design Effort RTML KOM Close-out Ross, Walker.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Baseline Technical Review – Central Region Accelerator Systems
DR Interface to Sources and RTML
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
LCWS11 AWG9 PARALLEL SESSION SUMMARY
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Accelerator Physics Technical System Group Review
RTML and Main Linac Design (2.6.1 and 2.7.1)
Progress activities in short bunch compressors
ILC - Global Design Effort
Presentation transcript:

20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC

20 July 2006 Vancouver GDE Meeting Global Design Effort 2 Design Status A complete first version of the RTML is in hand –Complete lattices in MAD8 (“xsif”) format released to RDR wiki site All subsections present including pulsed off-axis extraction lines Many parts of design not well optimized –Example: BC1 pulsed extraction line probably too short and at too small an angle wrt main line –Example: Linac launch matched for 1 Q / 4 CM lattice, not 1 Q / 3 CM lattice –No decisions are still pending, but… –Many decisions will be revisited now with new information ($$, technical feasibility) available

20 July 2006 Vancouver GDE Meeting Global Design Effort 3 RTML Footprint

20 July 2006 Vancouver GDE Meeting Global Design Effort 4 RTML Twiss

20 July 2006 Vancouver GDE Meeting Global Design Effort 5 RTML and DR Overview

20 July 2006 Vancouver GDE Meeting Global Design Effort 6 Cost Roll-Up Status As of this writing ( July 16:27 PDT), RTML is missing the following costs: –Magnet power supplies and cables –A few magnets associated with pulsed extraction lines –RF switches –A minor amount of instrumentation –A minor amount of vacuum stuff associated with the cold regions Cost impact is a few percent

20 July 2006 Vancouver GDE Meeting Global Design Effort 7 Major Cost Drivers Costs: –CFS 58% –CMs 17% –HLRF 5.7% –Magnets 5.6% –Cryo 4.5% –Vacuum 3.1% –Controls 1.9% –Instrumentation 1.9% –Dumps 1.3% –Installation 0.7% –Collimators 0.3% BC RF plus CFS = 85% of RTML costs!

20 July 2006 Vancouver GDE Meeting Global Design Effort 8 Possibilities for Cost Reductions Go from 2 shafts to 1 shaft per RTML –About 12% of RTML costs Revert to 1-stage BC –About 6.5% of RTML costs (reduce length + amount of RF + magnets), but has performance cost Bunch lengths < 300 µm RMS impossible –Thus, a decision above my pay grade! Increased emittance dilution Eliminate turnaround –About 3.5% of RTML costs, but has luminosity impact Feed-forward becomes impossible, so DR kicker jitter and collimator wakefield jitter amplification incurable Reoptimize DRX/Turnaround/BC1 geometry to eliminate drill + blast tunnel –About 2.6% of RTML costs plus some incidental reduction in vacuum –Actually captures almost all the benefits of eliminating the turnaround without any performance sacrifice Ultra-short bunch compressor? –About 2.0% of RTML costs –Still don’t have a solution which includes necessary emittance tuning controls Rearrange high-power dumps – replace full-power 15 GeV with 10% power dump, replace 10% power 5 GeV with full-power dump –About 1.2% of RTML costs –Dump costs so small compared to everything else, might be better to have full power dumps at 5 GeV and 15 GeV! Items in RED will be pursued at this workshop unless management gives us different guidance.

20 July 2006 Vancouver GDE Meeting Global Design Effort 9 Plans and Goals Goals for this workshop: –Converge on good configuration for area from DRX to turnaround RTML design, DR/DRX design, CFS –Improve understanding of CFS costs Major area for cost improvement Can we eliminate the 9 meter shafts? Goals for Vancouver-to-Valencia period –Iterate lattice design Include any changes from activities this week Eliminate mechanical conflicts now that we have better estimate of element overall sizes (may mean modest increase in lengths) Insert WBS numbers into lattice files Fix a few mistakes –Write RDR draft –More serious progress on static-level emittance tuning RTML AS remains open to suggestions about how we can best make use of time between now and Valencia –Since everyone will give us suggestions regardless

20 July 2006 Vancouver GDE Meeting Global Design Effort 10 Towards the TDR A few things to work on between now and the end of the TDR –Final decision on turnaround / feedforward Need to understand whether emittance dilution from turnaround eliminates gain from orbit feedforward Not really a cost item but a performance item –Determine which parts of RTML, if any, need more complete engineering effort for TDR –Implement that effort! Note: if you get the idea we haven’t thought at all about the TDR, then you are paying attention!

20 July 2006 Vancouver GDE Meeting Global Design Effort 11 Any Questions? “We’re going to stay awake For as long as it takes To correct all the silly mistakes we have made.” -Love and Rockets