Qualitrol Inventory Improvement Project Senior Design – 2015 Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
LeanSigma ® Facilitator Training Module 9 – Just in Time.
Just-In-Time and Lean Systems
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Just-In-Time “Eliminate Waste”.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Management is Essential
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT/Lean Production Chapter 13.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Value Stream Mapping.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
Complete Design Review Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Reid Lifting - QuickScan Feedback Session Friday 11 July 2014.
How to Effectively Implement Set-up Reduction in Any Organization.
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Danaher-VIDEOJET IE 431 Senior Design Group 5
Supply Chain Doctors The Supply Chain Doctors Supply Chain Management Kimball Bullington, Ph.D.
Just-In-Time & Lean Systems
JIT and Lean Operations
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Optimizing Shipping Times Using Fractional Factorial Designs Steven Walfish June 6, 2002.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Waterspider Lean network optimization Final Project IE Deterministic Optimization Instructor: Dr. Leslie MonplaisirLeslie Monplaisir Reed Parker.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Subsystems Design Review Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Detailed Design Review
Systems Design Review Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova.
Implementation of Lean at Rheem Manufacturing
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
LESSON 2 Push and Pull Systems
CHAPTER 9 Lean Manufacturing.
JIT/Lean Production Chapter 13.
Lean Manufacturing Series
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
LEAN ORGANIZATION SUMMARY
Welcome to my presentation
Just-In-Time and Lean Production
Material Requirements Planning (MRP)
CD Kanban Store Kaizen Event
Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Inputs and Outputs to APP
Presentation transcript:

Qualitrol Inventory Improvement Project Senior Design – 2015 Nathan Arrowsmith, Samantha Reinhart, Rachel Short, Yelena Tuzikova

Today’s Agenda  Introduction  Project Background (Current State)  Problem Statement  Customer Requirements  Engineering Requirements  Use Scenarios  Current Project Plan  Concerns

A Quick Introduction  Nate Arrowsmith (BS ISE Fall ‘15)  Samantha Reinhart (BS/ME ISE/Eng. Mgmt. Fall ‘15)  Rachel Short (BS ISE Fall ‘15)  Yelena Tuzikova (BS ISE Fall ‘15)

Project Background  Qualitrol is a Lean Manufacturer  Qualitrol carries very little inventory and relies on a steady flow of shipments to resupply its work cells  Material flow is not perfect – missed signals, improper bin sizes, etc.  Materials process is not always followed

Project Background (cont.)  Kanban cards often get lost  Parts sometimes go “missing”  The presentation of material in cells is not logical  To help mitigate some of these problems, Qualitrol is currently trialing water-spiders

Current State: Cell 922A  High volume and variety of parts  Signals are not always clear – Kanban cards leave the cell but it’s unclear when replenishment parts will or should arrive  Kanban cards often reside in overflow bins which adds to the confusion. Is a bin waiting for more parts or do we have so many of them that the Kanban card is still in the overflow bin?  No distinction between VMI and in-house filled  Material presentation is not ergonomic and some parts, used very irregularly (once every few months), occupy valuable workspace

Problem Statement Current State  Current Kanban system not properly utilized  Parts have no logical order of presentation Desired State  Optimal component levels  Aesthetic and simple material presentation  Kanban system used appropriately Goals:  Minimal space utilization  Updating appropriate Kanban levels  Creating material flow Deliverables  Supporting inventory calculations  Process documentation  Component management plan that is repeatable cell to cell  Before and after diagrams of the cell layouts Constraints  Available space  DBS practices

Customer Requirements  Create a process and set of tools that can be applied plant-wide.  Reduce or maintain floor space utilization.  Incorporate the use of a water spider into the inventory process.  Reduce inventory errors.  Reduce frequency of expedited parts due to inventory inaccuracy.  Reduce frequency and severity of inventory count errors on production and delivery. Customer Rqmt. # ImportanceDescription CR19 Create a process and set of tools that can be applied plant- wide CR29Reduce or maintain floor space utilization CR33 Incorporate the use of a water spider into the inventory process CR43Reduce inventory errors CR53 Reduce frequency of expedited parts due to inventory inaccuracy CR69 Reduce frequency and severity of inventory count errors on production and delivery

Engineering Requirements  Implement reliable and consistent visual cues for assemblers, material handlers, and managers.  Eliminate unnecessary materials from cells and the factory floor.  Implement material presentation plan in one cell (initially).  Create a methodology that can be duplicated in other cells and work areas.  Leverage water-spider and existing Kanban methodologies. Rqmt. #ImportanceSource Engr. Requirement (metric) Unit of Measure Marginal Value Ideal Value S19CR1 Process and tools should account for all possible permutations of part sizes and consumptions rates including hypothetical extremes. Surface Area~90%All Parts S29CR2 No change in required floor space %N/A≤0% S33CR3 Water spider should be utilized in a fashion that requires minimal effort while maintaining fulfillment requirements i.e. the Water Spider’s process should have good flow. On time restocking/ Employee Utilization95%/70%98%/80% S43CR4 Process should mitigate the frequency of inventory adjustment reporting errors %N/A< 20% S53CR5 Reduce inventory error-related part expedition %N/A S69CR6 Reduce work stops related to inventory errors %N/A50%

Use Scenario

Current Project Plan

Concerns  Time on the floor/visitation scheduling  Changes in customer requirements  DBS Kaizen Events are 1 week, we cannot accommodate that

Did We Miss Anything?  Is there anything we haven’t discussed today yet?  Is there anything we should know?  We are happy to accept any other feedback you might have.