EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,

Slides:



Advertisements
Similar presentations
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Advertisements

International Atomic Energy Agency IX.4.3. Waste management.
IAEA International Atomic Energy Agency HPS 2009 Meeting Minneapolis July 2009 International Atomic Energy Agency Efforts on Orphan Sources and.
RG - OFFICER Eng.Essam Hegab Environmental Health and Safety Manager.
Seminar on ESS29 November Seminar on neutron research centre in the Øresund region (European Spallation Source) 29 November 2002.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
Legacy Waste Retrieval And Treatment Processing Methods At RSRL Harwell Site Author : Marc Rigby Presented by : Malcolm Adam 28 th May 2009.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Recycling Nuclear Waste: Potentials and Global Perspectives Mikael Nilsson Department of Chemical Engineering and Materials Science University of California,
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES WLCG operations: communication channels Andrea Sciabà WLCG operations.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the contracts TW5- TSW-001 and -002 Garching. January 17 th, 2006 Final Meeting of the contracts.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
TW4-TSW-002/D4: Studies on possible concrete detritiation Johan Braet, John Seghers, Kris Dylst Final Meeting of contracts TW3 and TW4 17 January 2005.
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Rank the picture below the Core on the template slide Slide title 36pt Slide subtitle 18pt Safespur Presentation Johan Langham, Project Engineer, Studsvik.
Vincent MASSAUT Meeting 28/03/ Meeting on Revision of the Occupational Radiation Exposure assessment for the Port-Interfacing Systems (WBS5.0) Garching.
Proposal for a new UNECE regulation on recyclability of motor vehicles Informal Document GRPE Reply to the Comments of the Russian Federation Informal.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 Design for Remanufacturing and Reverse Logistics
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Auto Sector Life Cycle Management Methodology Presented by William E. Franklin and Beverly J. Sauer.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
CS451 Software Implementation and Integration Yugi Lee STB #555 (816) Note: This lecture was designed.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LCA Thinking in Hampshire’s Material Resources Strategy
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
TDR CH 12 PUNCHLINES D. Ene TDR INTERNAL REVIEW Lund, Sweden
FUSION AND FISSION Every second, the sun converts 500 million metric tons of hydrogen to helium. Due to the process of fusion, 5 million metric tons.
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Inquiry about Radioactive Workshops & Storage needs A status report Presented by L.Bruno Checked by P.Carvalho-Correia, M.Hatch, P.Strubin, T.Wijnands.
Fusion at SCKCEN. SCKCEN Foundation of Public Utility: created 1952, ~ 600 employees; turn-over ~ 80 M€/yr Reactors: safety, materials, instrumentation,
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
Preliminary Decommissioning Plan for the Canadian Light Source
HPM.
Management of Radioactive Waste
Update of 2017 Activities of the ENVIRONET NORM Project
LIFE CYCLE ASSESSMENT.
Planning for Design Project
Presentation transcript:

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK, SCKCEN, UKAEA EFDA-CSU Garching

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 2 Aims of the meeting For task -001B (art.5.1.b): q to present the results For task -001 (art.5.1.a): q To review the work already done (D1- D3; part of D8) q To coordinate the different subtasks and deliverables q To define how the results will be reached for each subtask q To try to detect potential difficulties q Planning, schedule, reference documents, actions For task -002 (art.5.1.a): q D1: (changes in IAEA clearance ref. doc) : present status q D2: (3D Alara planning tool): definition of the tools, needs and applications; how to apply it for a fusion example: present situation

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 3 The waste and recycling aspect is of very high strategic importance the claim on low radioactive waste production from fusion must be substantiated and based on solid analysis the recycling process is the main part of the waste minimization process recycling materials always produces secondary waste; it should be interesting to know which proportion these waste represent the sorting and classification of materials cannot be based on the radiation level alone

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 4 Task TSW-001: Recycling Fuel cycle Secondary Waste Contaminated materials Decontaminate Detritiate Secondary Waste Recycle Free release Activated materials Waste Disposal Storage Recycle Secondary Waste Detritiate maybe need to detritiate here

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 5 Feasibility of recycling what are the issues ? It is not obvious that all the materials and parts can be recycled The radioactivity is not the only parameter leading to recycle or not Recycling “noble” or valuable materials involves also other challenges (separation, metallurgy, refining, machining, joining, leak-tightness, changes in properties,…) What is the experience in remote handling for all these steps (dismantling – separation – raw material processing – machining and fabrication) Are there needs for further R&D (like e.g. mechanical testing of reused material)

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 6 How are the steps linked together ? Store for decay Recycle How long? waste Sort & separate how to manufacture? radioactive buildup? mech & phys properties changes? secondary waste How? selective decay? capacity Refine, Manufacture, Assemble, Test, Qualify Detritiation to be foreseen somewhere

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 7 Therefore it was proposed to work in steps Define components and materials involved; Determine volumes & masses+ properties + main boundary conditions Define activity limits for the dismantling, (melting), fabrication or reuse (&waste ) Define duration before recycling, activation of materials and decay time (depending on parts & components concerned) Estimate storage capacity needed or limits. Compare with existing storage facilities. Summarize the whole process and cycle Category of wastes (based on international standards) and on results of the cycle analysis Define the categories of materials based on the different routes in the cycle Define the needed R&D Finalised In parallel, study on the so-called “Complex Recycling” industrial experience

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 8 We should also prepare our common SOFT paper on recycling ChapterProposed author pages 1. IntroductionVM fig. 2. Definition of concerned components and materialsLDP Return of experience of current fission material recyclingRB, RP, LO fig. 4. Activity categories and limits for dismantling, fabrication and reuse LO Activation of material and decay timeRP Storage capacity needsLLS, KB fig. 7. Summary on categories and material routesLLS, all fig. 8. Remaining issues (and needed R&D)LO, LLS, all Conclusion and referencesVM, all0.25 TOTAL 6.0 Proposal of work breakdown