5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
EN/CV/DC Fluid analyses and Radiation Protection monitoring Presentation done by Elena Perez Rodriguez For further information contact
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
André Augustinus 9 October 2006 Interlocks update.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Cooling System Solutions
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
6 th September 20061S. Eicher, M. Battistin Upgrade Thermal Management Workshop September 6 th 2006 Bdg 40 Sara Eicher, Michele Battistin CFD Calculations.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
TS/CV/DC CFD Team June 2005 – CERN & CFD Presentation1M. Battistin TS/CV/Detector Cooling - CFD Team CERN June 24 th 2005 Michele Battistin CERN presentation.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
TE-CRG Activities D. Delikaris, TE-CRG.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
Transport and Handling Manpower Planning S. Prodon – LEAF
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Demineralised water cooling system
ATLAS M&O General Comments
CMS gas systems meeting
Tracker cooling loop “check out” draft for discussion
M. Battistin CERN EN/CV/DC 9th July 2009
Current Status Future Progress Monitoring
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Low temperature chiller Market Survey
Computational Fluid Dynamic at CERN
Presentation transcript:

5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations

5 th May 20062M. Battistin Subdetectors concerned TPC SSD-SDD HMPID TOF-PHOS- CPV-EMcal TRD Outer Tracker Rich 2 Inner Tracker Trigger Tracker Rich 1 Pixel Thermal screen Silicon Stripes Preshower + TIF SCT Evaporative Tile TRT LAr Muons Diff. Pumps + SR1 Rod-Rack Other cooling systems: - CMS Ecal - Alice Phos (C 6 F 14 ) - Mixed water for electronic racks - Chilled water - Demineralised main circuits Are OUT of the scope of this presentation. M&O agreement for these installations is detailed in EDMS SPD

5 th May 20063M. Battistin TS-PH mandates during construction TS/CV/DC Cooling station Connection piping Distribution manifolds Distribution lines Heating device TS mandate TS mandate PH mandate PH mandate How organize the operation phase of these systems? Detector TS/CV Cooling network

5 th May 20064M. Battistin Volumes and Values Service to be provided: Maintenance (preventive, corrective, predictive) of the installations Stand-by duty service during LHC operation period Operation, fine tuning PFC fluid management (quality and level control, purchase, register, etc.) (*) design cost added

5 th May 20065M. Battistin Detailed estimation of installation value Back-up slide

5 th May 20066M. Battistin A dedicated team will assure the service ½ section leader 1 engineer 1 fridge expert 1 electrical & control expert 1 pipe welder 1 technician (purchase, CAMMS, store) financed by TS LS on cost refund Staff funded by CERN-Experiment Agreement (Jul ’08) Cost related to manpower refund increases as the CERN-experiment agreement will phase out in the next years

5 th May 20067M. Battistin Maintenance cost 2.67% of the installation value gives minimum reference for maintenance cost estimation Installation value gives sharing criteria ½ manpower - ½ material (contractor interventions) - assumed Major spare parts (pumps, compressors, etc.) shall be considered “on top” of these amounts.

5 th May 20068M. Battistin Stand by duty service 24 kCHF for contract amendments ~10 kCHF for ~50 intervention per year Installation value gives sharing criteria A member of the ECR is supposed to intervene WITH the DC staff for safety reasons

5 th May 20069M. Battistin Operation Basically manpower cost Initially mainly funded by the CERN-experiment agreement Installation value gives sharing criteria Operation: fine tuning, supervision, light modifications, evolution activities, detector support during working hours, etc.

5 th May M. Battistin Fluid consumption ~15% leak rate estimation during the first year of operation ~10% leak rate estimation during the following years Leak rates form SR1 cooling plant are higher today. Is that representative?

5 th May M. Battistin Cost evolution ’07 – ’10 After 2007 fluid consumption should decrease After 2007 manpower refund cost should increase

5 th May M. Battistin Detailed Cost evolution ‘07-‘10 Some experiment (especially CMS) suggested a larger involvement of TS in the detector cooling problems. The knowledge consolidation during these years could be saved keeping the trained resources.

5 th May M. Battistin Project Associates budget CV/Detector Cooling have 10 year/man of PJAS on the “Manpower for consolidation of the technical…” program =600 kCHF 2 Polish technicians x 3 years x 60 kCHF/year ( → Aug 06) = 360 kCHF Paola Tropea x 3 years x 48 kCHF/year ( → Sep 06) = 144 kCHF Paolo Guglielmini x 2 years x 48 kCHF/year ( → Feb 06) = 96 kCHF Total =600 kCHF Paolo Guglielmini (LHCb) is already “unfunded” (form Feb 06). We would need Paola Tropea (CMS) for 1 year at least. Back-up slide

5 th May M. Battistin Ressources allocation for construction Supply contact 800 kCHF Supply contact 2.8 MCHF 7 cooling units realized in-house Back-up slide