Report on WP13 Sub Task 13.3.1 and 13.3.2 “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Status of the ATLAS MM project
15th RD51 Collaboration Meeting, CERN, March 16-20, 2015
Miniweek WG5 June 2015 Hans Muller CERN/RD51
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Cern.ch/knowledgetransfer. Knowledge Transfer | Accelerating Innovation Eduardo del Castillo RD51 mini week, June 2014 RD51 mini week CERN, June 2014.
Xiaodong Wang ( 王晓冬 ) School of Nuclear Science and Technology Lanzhou University, Lanzhou, China MPGD activities at Lanzhou University July 5, 2013.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
GridPix studies at Saclay Avalanche fluctuations D. Attié, A. Chaus, P. Colas, M. Titov GridPix workshop, Feb. 22, 2012.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
Leszek Ropelewski, CERN, Switzerland Maxim Titov, CEA Saclay, France MM for ATLAS upgrade THGEM for COMPASS upgrade GEM for CMS upgrade GEM for ALICE TPC.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
ATLAS micromegas activities (MAMMA)
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
News on GEM Readout with the SRS, DATE & AMORE
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
GEM Detector R&D at Florida Tech – “Get to know each other” –
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
1 GAS DETECTORS AIDA2020- GENERAL NEWS AIDA year programme4-year programme Project selected: 18/1/2015Project selected: 18/1/2015 Starting date 1/5/2015Starting.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
GEM+Timepix2 in the framework of project Gabriele Croci, Matteo Alfonsi on behalf of CERN-GDD Group RD51 Miniweek, February 2010.
WP4 STATUS AND OUTLOOK Hartmut Hillemanns TTN Meeting, 10./11. December 2009.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
WP13 Task and “Tools to facilitate detector development” STATUS of the ACTIVITIES WP13 Innovative gas detectors 16 March 2016.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
THE USER “POINT OF VIEW” ABOUT THE VFAT2 The first day.... The first week.... The first month.... The first year... But at the end you will be a friend.
RD_FA : WP - 4 C. Chatterjee1, S. Dalla Torre, S. Dasgupta2, S. Levorato, F. Tessarotto, A. Valentini1 1 – new 2 – formally he cannot be list.
“Medium Term”: VFAT2 + SRS readout system
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
PRAD DAQ System Overview
VMM and the SRS - update Michael Lupberger.
Design of the 64-channel ASIC: status
LABORATORI NAZIONALI DI FRASCATI
TileCal upgrade EVO meeting Demonstrator tesks
Particle Physics Group Christmas Meeting December 2016 Graham Miller
Toward the final design of a TPC for the ILD detector
CMS Goal of the experiment
Electronics and DAQ for the GEM Detector
EUDET Extended SC meeting 31 August 2009
AIDA KICK OFF MEETING WP9
Perugia SuperB Workshop June 16-19, 2009
Gain measurements of Chromium GEM foils
Presentation transcript:

Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out System (SRS) 2.Development of cheap, standard MPGD dedicated laboratory instruments WP13 Innovative gas detectors RD51 Mini Week, December 2015

FE chips and SRS 2 Easy-to-use Portable Scalability from small to large system Common interface for replacing the chip frontend Integration of proven and commercial solutions Availability of robust Data Acquisition software package High impact in the community: More than 2000 APV25 chips in use with SRS in the mpgd /rd51 community SRS Components for R&D on detectors with APV25 FE chip available on the CERN store Support from AIDA2020

FE chips and SRS 3 Common interface for replacing the chip frontend: Status (few examples) SRS & Timepix (LC-TPC) – Bonn/Desy SRS & APV25 – Large MPGD/RD51 community Uva & Florida TechATLAS NSW mm test beamESS and CERN GDDCMS-GEM Support from AIDA2020 Interfacing TimePix3 New FE ASIC with: Charge & time information Self triggering High readout rate Selected Candidates: VMM (ATLAS NSW-BNL) GEMROC (AGH) SRS & SiPM (NEXT TPC)

WP13 Task : Interfacing FE-chips specific to gas detectors to the Scalable Read-out System (SRS) Task AIDA 2020 Key/Partner Institutes Milestone [M36] VMM (ATLAS NSW, ESS, RD51) CERN: H. Muller, E. Oliveri Milestone [M36] GEMROC AGH Krakow: B. Mindur, eicSys: T. Jezynski CERN: E. Oliveri, H. Muller Milestone [M36] Timepix3 (LC-TPC) University of Bonn: K. Desch, J. Kaminski FE chips and SRS 4

5 ATLAS NSW-BNL, G. Iakovidis et al. VMM Charge & time information Self triggering High readout rate

FE chips and SRS 6 GEMROC –AGH Krakow, B. Mindur et al. GEMROC Charge & time information Self triggering High readout rate

FE chips and SRS 7 Ingrid [TimePix+mM] (LC-TPC) – Bonn/Desy - K. Desch, J. Kaminski, M. Lupberger  TimePix3

Task AIDA 2020 Key/Partner Institutes Milestone [M36] VMM (ongoing activities from ATLAS NSW, ESS, RD51, ALICE FoCal) CERN: H. Muller, E. Oliveri Status: Activity going on (without support from AIDA2020 until now) on the development of a VMM hybrid compatible with the SRS and of a Digital Interface Card (D- CARD). AIDA2020 resources to support development for R&D and Generic use of the chip in our community. H.Muller & ALICE FoCAL Setup in GDD laboratory VMM2-SRS hybrids and D-Card. FE chips and SRS 8 ATLAS VMM2 NSW setup in GDD laboratory (ATLAS and RD51 SRS hybrid tests ) New bunch of chips (version 2) will be purchased in the next few months to progress on the characterization of the chip using SRS as DAQ and control system.

Task AIDA 2020 Key/Partner Institutes Milestone [M36] GEMROC AGH Krakow: B. Mindur CERN: E. Oliveri Status: ongoing technical discussion with eicSys (ATCA SRS) for the development of the parts needed to interface the FE chip with the SRS (hybrid and adapter card). If the technical discussion will converge in the next weeks (most likely), a production of about 100 GEMROC chips will be done in end 2015/beginning 2016 (covered by AIDA 2020). First half of 2016, first SRS compatible prototype of the hybrid (based on the existing version), end of 2016 adapter cards for ATCA SRS ready for test and debugging. Redesign of Hybrid and ATCA SRS FEC Adapter Card GEMROC SRS-ATCA FE chips and SRS 9

Task AIDA 2020 Key/Partner Institutes Milestone [M36] Timepix3 (LC-TPC) University of Bonn: K. Desch, J. Kaminski Status: PCB layout of chip carrier/FEC extension cards ongoing. On schedule with the original plan. CERN, as leading institute and beneficiary of the EU fund, will transfer part of the AIDA 2020 resources to Bonn University (thanks to the involvement of Bonn University as leader of other AIDA2020 WPs). This will allow us to use the EU resources in the best and more efficient way. Based on the existing TimePix-SRS interface Bonn/Desy FE chips and SRS 10

From AIDA Kick-Off Meeting FE chips and SRS 11 today

WP13 Task : Development of cheap, standard MPGD dedicated laboratory instruments Instrumentation 12 High Voltage Preamp/Amp readout… Event by event signal detection, Triggering Pico-Amps detection Laboratory instrumentation for MPGDs (characterization)…

WP13 Task : Development of cheap, standard MPGD dedicated laboratory instruments Task Ref. Institute/Person Deliverable [M24] High Voltage Power Supply for MPGD CERN: H. Muller, E. Oliveri; CEA: P. Colas Wigner: D. Varga; INFN Trieste: S. Dalla Torre (Floating) Pico ammeter CERN: H. Muller, E. Oliveri, INFN Trieste: S. Dalla Torre, S. Levorato; Wigner: D. Varga Signal Processing CERN: H. Muller, E. Oliveri Monitoring and Control Unit CERN: F. Brunbauer, F. Resnati, H. Muller, E. Oliveri Regeneration Gas System CEA: P. Colas Instrumentation 13

Task Ref. Institute/Person Deliverable [M24] High Voltage Power Supply for MPGD CERN: H. Muller, E. Oliveri; CEA: P. Colas Wigner: D. Varga; INFN Trieste: S. Dalla Torre Instr.1: Compact HV for MPGD [Deliverable – M24] Status: Compact active voltage divider to provide high voltage with high precision to multi electrodes MPGDs. Prototype for GEM detectors under test. Zero-version of protection circuit and monitoring unit under test now. AVD Kept as deliverable for this task because of its status. AIDA2020 support can be nevertheless used for parallel developments carried on by partners. 3D CAD of AVD, protection and monitoring circuit Instrumentation 14 H. Muller et al.

FemtoBox Task Ref. Institute/Person (Floating) Pico ammeter CERN: H. Muller, E. Oliveri, INFN Trieste: S. Dalla Torre, S. Levorato; Wigner: D. Varga Signal Processing CERN: H. Muller, E. Oliveri Monitoring and Control Unit CERN: F. Brunbauer, F. Resnati, H. Muller, E. Oliveri Task Ref. Institute/Person Regeneration Gas System CEA: P. Colas INFN Trieste Arduino Based Monitoring and Control Unit CERN Ongoing activities in the involved institutes [Low current measurements (not floating - Femtobox (CERN), floating (Trieste)), Signal Processing (Pick-Up Box (CERN)), Monitoring & Control system (MoCos (CERN)).] Gas System Regeneration (to be better defined and discussed with our partners (CEA)) Status: prototypes existing or almost finalized. AIDA2020 planned to be used on the final Engineering steps and for improvement. PickUpBox (pre+amp) CERN Instrumentation 15

Instrumentation 16 AVD (Active Voltage Divider) Suitable for multistage MPGDs E-Fuse Circuits Arduino-based monitoring Units Control and Monitoring Software Voltages Currents Voltage Ratio between all stages hardware defines (resistors) H. Muller et al. V.Karaventzas

Instrumentation 17 APIC and TPIC: analog and trigger pickup Energy, S/N ratio, signal shape optimization, triggering H. Muller et al.

Instrumentation 18 Gain Calibration Leakage Current Measurements

From AIDA Kick-Off Meeting (Simplified version) HV Pico-ammeters Signal processing Monitoring Regeneration Gas System Instrumentation 19 today

Budgets 20 Task Budget (FE Chip for SRS) 50k from EU Task Budget (Instrumentation) 70k from EU Possibility of changing the resource sharing between the two subtask