April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1.

Slides:



Advertisements
Similar presentations
NASA SCaN Service Management Workshop Summary CSSA Service Management Working Group London, UK October 2010 John Pietras Global Science and Technology,
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Muscogee County School District Division of Academics (DOA) District Accreditation Module 4: Quality Assurance.
Advanced Multimission Operations System (AMMOS)
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
The Technical Community Understanding the Procurement Cycle LaShawn Davis Professional Intern Program Level II Presentation.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
® VisualPlex Exchange Project Definition Phase June 23, 2000 Prepared James M. Dutcher Oracle Consulting Services.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Construction Project Management
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
Project Management Models
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
EU-funded Project “Implementation of Ukraine’s Commitments under WTO and ENP Frameworks in the Rural Sector (Sector-Wide Approach)” Agricultural Markets.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
System Implementation. © 2011 Pearson Education, Inc. Publishing as Prentice Hall 2 Chapter 13 FIGURE 13-1 Systems development life cycle with the implementation.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Adrian Gardner, NASA GSFC CIO August 16, 2011 Strategic Computing Strategy for Goddard Space Flight Center.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.
Office Name Goddard Space Flight Center 1 Proposed SCaN-Cx Interface Study Approach Dave Israel August 24, 2007.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Computer Technology: Your Need to Know Chapter 1 Slide 1.
Advanced Software Engineering Dr. Cheng
Introduction to Project Management
Planetary Lander PDR Team Name
Unmanned Control & Tracking System (UCATS)
Kentucky Space Facilities for satellite development, testing and operation Twyman Clements1, David Jones1 ,Jason Bratcher1, Jessamyn Delgado2, Daniel Erb1,
Systems Engineering Management
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Project Introduction Spring 2017.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
FY18 Water Use Data and Research Program Q & A Session
Presentation transcript:

April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1

Page 2 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Network Integration Management Office Functions The Network Integration Management Office (NIMO) provides its spacecraft and scientific customers with a complement of mission services. The group provides best value tracking and data acquisition options, assistance with mission-unique communications requirements, and assistance in requirements definition. The NIMO provides Principal Investigators and Mission Formulation Managers with options and planning assistance to effectively meet the mission tracking and data acquisition (T&DA) needs. The NIMO also supports the mission throughout the life cycle for its T&DA needs - from trade studies and cost analysis during the formulation phase, to project management during development and operations. In addition, the NIMO provides Network Integration Managers (NIM) with the ability to secure contract vehicles and services to implement and operate their mission most effectively.

Page 3 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Personnel & Assignments Direct Civil Servants Leslie Ambrose – Space Science Mark Ambrose – Agreements & Reimbursable Manager Jim Bangerter – Human Space Flight Evette Brown-Conwell – ELV Dick Harris – Contracts Al Levine – Loading & Feasibility Lynn Myers – Earth Sciences Tammy Wang – Resource Analyst Matrixed Civil Servants John Weiss – Estimation Dick Nefzger – Video YY Bae – Compatibility Chris Schwartz – L&F & ELV

Page 4 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Networks Integration Manager (NIM) Assignments

Page 5 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Access Methods Projects Proposal Teams Telephone Walk in NIMO

Page 6 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE External Interface to the Infrastructure ESCD GSFC Space Network Ground Network Lunar Network NISN Flight Dyn. Fac. Deep Space Net NIMO NASA Non-NASA NASA

Page 7 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Major Process Steps

Page 8 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Major Process Steps Details - Example

Page 9 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Mission Process Products Memorandum of Agreement Visibility and Loading Analysis - 1 Project Support Level Agreement Visibility and Loading Analysis - 2 Networks Requirements Document Networks Requirements Review Radio Frequency ICD Compatibility Test Plan Test Quick Look Report Final Report Compat. Test Review Customer Integration Test Plan Testing Network Operations Support Plan Customer Data Flows & Simulations Visibility and Loading Analysis - 3 Mission Operations Readiness Review Mission Operations Post Launch Report/Lessons Learned The NIMO mission development process exists, and is constructed, to assure, to the maximum extent possible, communications connectivity and data delivery to every mission on every contact.

Page 10 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Timeline

Page 11 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Backup

Page 12 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Flow (cont.)

Page 13 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Flow (cont.)

Page 14 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO PSLA Contents (Present) Section A. Customer Information Section B. Customer Requirements and Standard Services B.1GSFC Networks/Data Services B.1.1Ground Network Services B.1.1.1Customer Requirements B.1.1.2Services Provided B.1.2Space Network (SN) Services B.1.2.1Customer Requirements B.1.2.2SN Data Formatting and Interface B.1.2.3Services Provided B.1.3Customer Integration and Test B.1.4Satellite Laser Ranging (SLR) Services B.1.5Radio Frequency (RF) Interface Control Document (ICD) B.2Deep Space Network (DSN) Services B.3Flight Dynamics Services B.3.1Customer Requirements B.3.2Services Provided B.4Range Services – Not Applicable B.5NASA Integrated Services Network (NISN) Services Section C. Unique Customer Requirements for Non- Standard Services Section D. Service and Schedule Summary D.1Funding Responsibility D.2Estimated Services for Future Years Section E. Projected Documentation Set

Page 15 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO PSLA Contents (Future) SECTION A. Customer Information SECTION B. Customer Requirements And Standard Services B.1GSFC Networks/Data Services B.1.1Ground Network Services B.1.2Space Network Services B.1.3Customer Integration And Test B.1.4Satellite Laser Ranging (SLR) Services B.1.5Radio Frequency (RF) Interface Control Document (ICD) B.2Deep Space Network (DSN) Services B.3Flight Dynamics Services B.4Range Services B.5NASA Integrated Services Network (NISN) Services SECTION C. Unique Customer Requirements For Non-Standard Services C.1AFSCN Requirements SECTION D. Service And Schedule Summary D.1Funding Responsibility D.2Estimated Services For Future Years D.2.1Project Schedule SECTION E. Network Integration Documentation Set