March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
AR1 BPM Calibration (for new electronics) Before any TOA measurements we attempted to look at the BPM calibration (AR2-BPM-03) Turn off quads (Q1,Q2) and.
J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
1 Preliminary Analysis of GTF Longitudinal Emittance Experiment D. Dowell SLAC July 18, 2001.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ALICE Beam Simulations Deepa Angal-Kalinin On behalf of ALICE simulation team F. Jackson, J. Jones, J. McKenzie, B. Muratori, Y. Saveliev, P. Williams,
ALICE : Superconductive Energy Recovery Linac (ERL)
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
E. Schneidmiller and M. Yurkov (SASE & MCP) C. Behrens, W. Decking, H. Delsim, T. Limberg, R. Kammering (rf & LOLA) N. Guerassimova and R. Treusch (PGM.
Possible new EMMA injectors bdm. Motivation ALICE due to shut down soon Alternate EMMA injection (assuming EMMA project continues which it should …) Several.
Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
#3271 Sat 08-Dec-12. R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert.
ALICE August Summary. AP/FEL/Thz 3 blocks – A)7-11 Aug (7 shifts, # ) – B)16-17 Aug (4 shifts # ) – C)25-29 Aug b. hol. w/end (7 shifts # )
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
PI laser jitter measurements Data taken on 11 th April 2013.
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
UNRELIABLE DATA, SEE FIRST SLIDE WARNING!!! Data taken on these shifts had attenuation factors set incorrectly and problems with faraday cup bunch charge.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Time Of Arrival/R56 measurements Period 13. Background Dave Newton’s Parameter scans \\Dlfiles03\alice\Simulations\R56 AR1 (parameter scan).pdf Deepa’s.
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
Low Emittance RF Gun Developments for PAL-XFEL
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
3243 Fri 23 Nov Summary INJ-BPM-01: took 1 shot of data, just a reference to compare with previous recent shifts – Did not see a strong dominant 100 kHz.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Dynamics Meeting Bolko Beutner, DESY Summary of new FLASH CSR studies Bolko Beutner, DESY Beam Dynamics Meeting
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Velocity bunching from S-band photoinjectors Julian McKenzie 1 st July 2011 Ultra Bright Electron Sources Workshop Cockcroft Institute STFC Daresbury Laboratory,
Status of the Simulations on Photo Injector Optimization for Low Charges Yauhen Kot BD Meeting,
Beam-Based Calibration Screen calibration. Two screens with BPM in between. Scan beam position with upstream dipole/corrector. Absolute calibration. One.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
Wakefield effect in ATF2 Kiyoshi Kubo
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Momentum and Momentum Spread Measurements
Feng Zhou LCLS-II AP meeting 02/23/2017
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Beam-beam effects in eRHIC and MeRHIC
Longitudinal Diagnostics for start-up
Thermal emittance measurement Gun Spectrometer
BC2 Commissioning Parameters
LCLS Commissioning Parameters
Time-Resolved Images of Coherent Synchrotron Radiation Effects
LCLS Commissioning Parameters
Z. Huang LCLS Lehman Review May 14, 2009
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Modified Beam Parameter Range
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Linac Diagnostics Commissioning Experience
New VUV-FEL Simulation results
Presentation transcript:

March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA measurements NEW 4.Transverse 60 pC NEW

These Slides Started looking at the AP measurements done, but first got puzzled wondering how the values sol, buncher, booster etc were set Ended up trying to go back and understand the choice of 2012 parameters, and write up the ‘story’ of this.

Summary of Machine Set-Ups in March-May New injector set-ups for 325 kV gun field (was 230 kV for years previously). Only a few shifts on each project so not much set-up evolution. Initial injector set-ups developed over a handful of shifts. Previously (230 kV, 60 pC) had Pb ~ 500 W, BC1 phases = -20°  -10°, BC2 phases are various. Despite having various ‘standard set-up files’ there was considerably tweaking shift-to-shift. The 2012 (325 kV, 60 pC) choices of SOL and BC1 for an injector baseline evolved mainly through optimising INJ-2,3 images at Pb = 1.6 kW (#2845 was the shift where most of the parameter choices were made) – The 1.6 kW and initial guesses for SOL, BC came from prev ASTRA sims/optimisations I think. FEL took this as the baseline then tweaked Pb, BC to get lasing (immediate change of Pb to lower values)

How did set-ups emerge? There have been many ALICE injector simulations and optimisations using ASTRA over the years (Hywel, Chris, Bruno, …). Including some (Julian) this year 2012 on a parameter set-up for 350 kV. Partly based on Bruno’s 2008 simulations (and other arbitrary choices)? These showed that the higher the buncher power the better, to reduce injector bunch length. Over 1.6 kW is desirable (this was with BC1 = -20, which was not used in the end) – Later on when BC1 = -10 was used in first shifts (#2844) a minimum bunch length at 1.5 kW was observed. And also that the smallest injector bunch lengths are obtained with BC1 = + 20 to + 30 (yes, really +ve), for Pb = 1.0 or 1.6 kW. Small injector bunch length = small post linac energy spread = better FEL gain. See folder \\Dlfiles03\alice\Simulations\ALICE Simulation Meeting

First Injector Setup Attempt First inj set-up with 325 kV (#2840, 14 Mar) Chose SOL-01 at 4.0 A by observing INJ-1 while scanning SOL from 4.0 A to 4.4 A 3.9 A = 330 Gauss is the optimum for (350 kV, 80 pC) according to BDM ASTRA sims of EPAC 08. Then Pb = 1.5 kW, BC phases = -10/+15, SOL-02 = 2.6 A (220 G) – Not sure what the reasoning behind these parameters was. #2840 LOG

Pulse Stacker Studies Pulse stacker was tried in and out on #2844 Used params BC = -10/+15 Bunch length measured w/wo pulse stacker (RF zero cross quick and dirty, #2844) clear minimum at Pb ~ 1500 W Stability on INJ-5 seemed better WITH pulse stacker.

‘Final’ Baseline Injector Set-Up in March 2012 Over #2845, YMS tired various SOL-01,02, BC1 BC2 phases. All with Pb = 1.6 kW. Main critera was to get beam looking ‘nice’ on INJ-2, INJ-3 BC1 varied from -20 to -10. Final set up Pb = 1.6 kW, BC = -15/+22 SOL-01,02 = 4.0, 2.8 was one that gave the nicest images. Conclusion that only BC1 grad and phase affects the INJ-2,3 beamsize. And, final decision on pulse stacker, INJ-2,3 not much better without p.s., so leave it in.

FEL setups development FEL first lasing #2865: 325 kV, 60 pC, Pb = 1.25 kW, BC1 phases = -14/+12, LC phases = +14/+14. – later on same shift more FEL power was achieved with BC1 = -12 (and other changes) First lasing shift #2865 carried on from #2864, which used a starting point with Pb  kW, BC1=-15°, from #2845 ‘final injector set-up’ FEL lasing tweaking involves tweaking Pb, BC1, BC2 pragmatically from the starting point until achieving lasing – Buncher power reduced significantly 1.6  1.25 in these tweaks. – BC2 phase moved closer to crest to chirp bunch positively – cause bunch compression in FEL. – The snapshot on #2865 looks very different on INJ2-3 to the starting baseline found in #2845. – Raises the question whether INJ-2,3 are the best thing to optimise on, and if not, what is?

Conclusions (set-ups) Perhaps the injector param space has not been explored as thoroughly as it might have been. Particularly Pb value was not explored very thoroughly in dedicated injector set-up shifts. What is the value of more dedicated injector set-up work?

Bunch Length/Energy Spread in Pre- compressed Bunch Several observations in set-up period and AP shifts Bunch charge questions (scope “probe gain” problem, and differences between how people define the bunch charge – first bunches, rest of train etc)

Pre-Compressed Bunch Length – General Features Absolute bunch length of ~ mm FWHM measured at booster exit (#2867,#2869) for – Pb = 1.6 kW, BC1 = -15 – Period 12 (2011) bunch length was ~ mm* for THz-like set-ups At linac exit, bunch length measured at mm FWHM over a variety of conditions – Period 12 generally measured much smaller post-linac bunch lengths  1mm FWHM Quick and dirty booster exit bunch length vs Pb, with BC1 = -10 gives minimum at Pb = 1.5 kW – Does this agree with simulation? Bunch length evolution in INJ line (conflicting observations) – One shift #2867 measured post-booster AND post-linac bunch length indicating bunch lengthening in INJ (Pb = 1. 6 kW, BC = -15/+22). – Another two shifts (#2847,#2852) recorded a contradictory observation – bunch shortening The AR1-1 energy spread for BC2 at +22 and +30 was measured with the equivalent linac offcrest phase and found dE greater at BC2 = +30 than at BC2 = +22 At BC = +30, linac crest phase same as phase min AR1-1 energy spread  bunch not chirped at linac entrance. Thus at BC=+22, positive chirp, head > tail. And at BC+22 the post linac energy is smaller, so … … this implies bunch shortening in injector at BC = +22 (R56) *Corrected for incorrect INJ-YAG-05 calibration

Energy Spread Observations #2841. Uncorrelated energy spread in injector at 5 keV RMS (~0.1%) over large range of Pb ( kW), BC1 (- 20,+10) params. About 10 pixels on INJ- YAG-05 In 230 kV days we did observe ~ 5 KeV RMS energy spread (40 pC) when measuring uncorrelated energy spread vs Pb (2010 FEL commissioning days), but not over whole. In 2011 with 60 pC running uncorrelated energy spread not studied in detail May 2010

#2867 Bunch Length Evolution AW/PW #2867 did some bunch length evolution studies and analysis – \\Dlfiles03\Apsv4\Astec\Projects\ALICE\ALICE_Physics_Meeting\2012_04_10 \\Dlfiles03\Apsv4\Astec\Projects\ALICE\ALICE_Physics_Meeting\2012_04_10 Some agreement between measurements (bunch lengthening) and prediction, based on R56 of injector set-up and estimated post-booster chirp of bunch But +vs/-ve signs are critical to understand if this should be bunching or debunching R56 #2867, 19:11 apply BURT: ELEGANT R56 using BURT: R56 is the OPPOSITE SIGN to post linac compression, And in the injector we assume head is higher energy than tail This should lead to bunching not debunching. But can we trust the ELEGANT R56 plot, or should we try and measure R56 in the injector? I notice that increasing INJ-Q5 strength by 50% REVERSES THE SIGN of R 56. Checked that Q-05 is not model is not central as in real life.

Two Beam Studies Relevant In March-May kV revisted for two beam studies Two beam z-separation as function of Pb, compared with ASTRA sims of RMS bunch length vs Pb (BC1 = -10, 60 pC) Both measurement and sims show minimum bunch length/separation at the same value Pb = 1 kW

Conclusions (longit. measurements) Interesting that post-linac bunch lengths seem longer with the 325 kV set-ups Some conflicting data on longit. evolution in injector Is it worth pursuing this further with lots of shift work? – Fiddly measurements, might get - as in the past experience (2011) - a large amount of somewhat inconclusive data – Many difficulties in getting precise measurements with current injector diagnositcs (beta minimisation, large energy spread ‘reconstruction’, difficulty in knowing the bunch charge in first bunches …)

TOA First Attempt # April 2012 Prelim results presented at – \\Dlfiles03\Apsv4\Astec\Projects\ALICE\ALICE_Physics_Meeting\2012_05_01 \\Dlfiles03\Apsv4\Astec\Projects\ALICE\ALICE_Physics_Meeting\2012_05_01 R56 measured by TOF at AR2-BPM-01 and ST1-BPM-01. First measurement of post linac R56 at AR2-BPM3 (#2907) gave 150 mm, expect 280 mm naively And ELEGANT model of BURT _2351 on this shift predicts R56 = 450 mm – ARC is NOT isochronous for this BURT. AR1-Q1-4 are not the right values for isochronicity, and R56 is VERY sensitive to these quads. – Another reason for discrepancy could be because AR1-SEXT-01 was on (2.8 A), misalignment could affect R56 – Dipoles are not perfect symmetrical currents. On this shift in comp-chicane first 3 dipoles are symmetric and fourth one is 2 % weaker. AR2-Dipoles differ by < 0.5%. ELEGANT investigations suggest this alone isn’t enough to explain the discrepancy. – R51, R52?? Also attempted measurement of injector R56 but inconclusive. Try again in future. ELEGANT BURT _2351 post linac R56, AR1-SEXT-01 off Change in TOF (mm) vs fract change in beam energy

#2908 (Deepa, Julian) AR2-BPM-01 vs AR1 params (Q1/3, Q2/3, SEXT-01, SEXT-02) Indicates very strong effect from AR1-Q1,Q4, as expected. Trend of R56 AR1-SEXT-01 = 2 A for first point, = 0 A for other two points AR1-SEXT-02 = 0 A AR1-SEXT-01/2 = 0 A Nominal Q1,4 setting, first measurement was 150 mm (with AR1-SEXT-01 on), here it is 191 mm with AR1- SEXT-01 off Q2,3 nominal value Shouldn’t this be the same value as this? Shouldn’t this be the same value as #2907, 150 mm? Repeatability of measurements?

#2927 FJ/HA/Terry Atkinson Repeatability of Measurment AR1-SEXT-01 (A) R56 Pretty repeatable Wanted to get a more detailed scan of R56 vs Sext-01 to see trend. Scanned AR1-SEXT-01 0 A to 9 A then back to repeat a point at 3 A BPM No particular trend observable but alignment of beam w.r.t quadrupole unknown

#2996, July 2012 Aim was combined effect of AR1 steering and AR1-SEXT-01 on R56. Attempt to use AR1-BPMs to judge trajectory. AR1-BPMs have new EMMA-style single bunch electronics. Also attempt beam-based calibration of AR1- BPMs