1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.

Slides:



Advertisements
Similar presentations
10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/29/20121 PHENIX WEEKLY PLANNING 11/29/12 Don Lynch.
9/13/20121 PHENIX WEEKLY PLANNING 9/13/2012 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
8/29/ PHENIX WEEKLY PLANNING Aug. 29, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
4/18/20131 PHENIX WEEKLY PLANNING 4/18/2013 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Presentation transcript:

1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch

1/31/20132 This Week Commission FVTX rad monitors Complete FVTX East services restoration, ready for commissioning VTX Strip pixel failure analyses and evaluation Continue working on RPC3 shielding near Q3 Continue window Washer safety upgrades Continue sPHENIX design support Continue MPC-Ex design support Finish White/Blue sheets Begin Building Shield Wall

1/31/20133 Next Week FVTX commissioning Continue working on RPC3 shielding near Q3 Continue window Washer safety upgrades Continue sPHENIX design support Continue MPC-Ex design support Finish Building Shield Wall/Roll in Ready for run 13

1/31/20134 RPC Background Attenuation Project Looking towards RPC3 North  EastWest  Looking towards RPC3 South  WestEast  Large shielding modifications at Q2 upstream north and south to be planned and installed by CA-D (Dave Phillips) by 12/14/2012. In progress this week

1/31/20135

1/31/201312/20/20126 Radiation Monitoring System 12/20/2012 6S. Boose

1/31/201312/20/20127 Five sensor boards, each with RADFET, Silicon diode and temperature sensor are installed on PHENIX central arm. Sensors are multiplexed by RadMon Switcher board into Keithley 2400 SourceMeter. RadMon Switcher and Keithley are controlled by RS-232 from serial server in CMN rack. Data acquisition is controlled by a Python script running on a computer in the counting house. 12/20/2012S. Boose7

1/31/201312/20/ /20/ S. Boose

1/31/20139

10 Window Washer Remote Pin Removal and Winch/spooler safety upgrades South Side pin North Side pin Limit switch

1/31/ Window Washer Remote Pin Removal and Winch/spooler safety upgrades Minimum angle from winch: Need clearance between 1 and 2 inches from wall Maximum angle from winch: Need clearance between 1 and 4 inches from wall

1/31/ HVAC Rack Room Controls The two 10 ton units will have their Trane controls replaced with Automated Logic Corp. (ALC) controls. Both units will be out of service during modification work for two weeks in February. Rack Room winter heat loads will be handled by the 30 ton and floor unit during this time. Engineering work is in progress to eventually upgrade the 30 ton roof mounted unit controls and IR HVAC controls.

1/31/ HVAC Rack Room Controls

1/31/ MPC-Ex Existing vacuum bellows anti-squirm In MPC S Cavity Proposed vacuum bellows anti-squirm In MPC S Cavity to accommodate MPC-Ex MPCS Flat cables replaced with round cables.

1/31/ sPHENIX Proposed Upgrade Work continues evaluating engineering tradeoffs for EMCal and HCal design, materials, etc. Prototype HCal and EMCal in progress

1/31/201316

1/31/ Shutdown Schedule Remaining Tasks De-cable and disconnect utilities for VTX/FVTX East Done Disconnect gas, water, electric, fibers from ECDone Move EC to AHDone Dismount VTX/FVTX EastDone Prep Chemistry Lab for VTX/FVTX EastDone Transport VTX/FVTX East to Chemistry LabDone Document Current configurationDone Remove FVTX CagesDone Dismount VTX Strip LayersDone Dismount VTX Strip-Pixel LayersDone Test FVTX Done Design and fabricate VTX stiffeners and bigwheel spacer/sealsDone Re-assemble FVTX with VTX stiffeners and spacer/sealsDone Transport FVTX to 1008 and install on railsDone Align and Survey FVTX EastDone RPC Shielding under DX magnetsDone

1/31/ Move EC to IR Done Re-cable and re-store utilities to FVTX East and isolate (valve off) VTX West circuits Done? Re-connect gas, water, electric, fibers to ECDone? Unfold the EC platforms, re-install safety rails, (carpenters and Riggers under CAD supervision)Done Move the MMS northDone Martin Luther King Holiday weekendDone Install the MuID CollarsDone Pink SheetsDone? Test and Commission FVTX1/22-2/8/2013 Re-install the EC material lift and ladder (dumb waiter) BNL carpenters and Riggers under CAD supervisionDone Blue SheetsDone Magnet Tests (white Sheets)Done Start Watch ShiftsDone RPC tunnel Shielding (Dave Phillips)1/31/2013 Window Washer pin & spool upgrades1/31/2013 Run 13 Prep Schedule Remaining Tasks (continued)

1/31/ Assemble shield Wall1/28-2/7/2013 Roll-in shield wall2/8/2013 Safety system checkout complete/start flammable gas flow2/8/2013 Start run 13(cooldown)2/11/2013 End of Shutdown/Start of Run Party2/13/13

1/31/ PHENIX Annual Safety Review: action items PHENIX to provide C-AD with a plan for continued use of the RPC factory (O’Brian, Lynch Feb 15, 2013) Review to assure all power supplies are NRTL equivalent compliant and affix respective labels (Giannotti Feb 10, 2013) Provide the new flammable gases leak rates (Pisani, Feb 1, 2013) Provide the updated gas usage quantities (Pisani Feb 1, 2013) Provide details of the Rad Monitor EE! (Boose Feb1, 2013) Done Provide approval by a certified EE for the Rad Monitor system (Giannotti Feb 1, 2013) Carry out the Blue Sheeting (CAS, Phillips Feb 1, 2013) Done Provide documentation on the upgraded NOVEC gas system (Pisani Feb 15, 2013) Provide an assessment of the new gas system software, what QA rating and proposed configuration control (Pisani Feb 15, 2013) Provide updated sweep procedures (Sampson Feb 15, 2013) Carry out an inspection of the installed platform gates (Cirnigliaro Feb 10, 2013)

1/31/ Safety and Security 1.(cont’d) General Items: Update the PHENIX ECR. (Craner, Feb 15, 2013) Update the PHENIX work plan (Cirnigliaro Feb 1, 2013) Done Carry out a magnetic safety review (Phillips Feb 10, 2013) A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi / Etkin et al Feb 7, 2013) Update the documented work procedures. (Lynch Continuing from last year) Done Establish trained PHENIX watch shifts. (O’Brien Feb 1, 2013) Done Review and update the PHENIX emergency procedure if necessary (Makdisi Feb 1, 2013) 2.PHENIX Procedures: Rob/Paul/Don 3 year cycle review completed: 22 procedures renewed without change, 6 procedures de-activated, PHENIX Awareness revised to include ladder stuff ODH1 and POM training renewal 3.RHIC tunnel is now posted as ODH-0 (does not include PHENIX IR). Web training necessary to go in tunnel. 4.Make sure annual PHENIX awareness and Collider User trainings are up to date. 5.BNL PPE Demo Room Open every Thursday 9:30-1:00

1/31/ Safety, Security, Etc.

1/31/201323

1/31/ Where To Find PHENIX Engineering Info Groundhog Day Feb. 2 If he sees his shadow: 6 more weeks of winter If not: an early spring Punxsutawney Phil has been right 37% over 125 years of records, Overall groundhogs have about a 28% record. So if you bet against the groundhog you will be a big winner Other Famous Groundhogs: Balzac Billy (Alberta, Canada); Staten Island Chuck; General Beauregard Lee (Georgia); Buckeye Chuck (Ohio); Smith Lake Jake (Alabama); Sir Walter Wally (N. Carolina); Wiarton Willie (Ottawa, Canada);