RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008 EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.

Slides:



Advertisements
Similar presentations
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Advertisements

Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
Mission Success Starts With Safety 5/3/ Changes in Rev. A of NASA STD NASA STD A 1.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
Workmanship Requirements Compliance
Company History  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
Kursus “electronic assemblies & SOLDERING Technique”
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Gayle K. Martin November 14, 2016
Acronyms 3-4 Sept DRAFT EFW INST+SOC PDR 483
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
GLAST Large Area Telescope:
Common termination methods:
BRIAN KLATT MISSION ASSURANCE MANAGER
Integration and Test Organization Chart
Emulsion Task Force Meeting
Single-Phase Qualification of Microcircuits in ESCC 9000
Materials Spreadsheet –
DOE Review of the LCLS Project October 2006
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product Assurance Trent Taylor, Flight Assurance Manager Laboratory for Atmospheric and Space Physics University of Colorado at Boulder

983-4 Sept. 2008EFW INST+SOC PDR Product Assurance Topics Flight Assurance Team EEE Parts, PWBs and GIDEP PWA Build Processes Workmanship Standards Contamination Control ESD Control Program

993-4 Sept. 2008EFW INST+SOC PDR Flight Assurance Team Trent Taylor, LASP Flight Assurance Manager Tracy Vincent, EFW Quality Engineer Sharon Dooley, EFW Procurement Expeditor and GIDEP Coordinator Cat Brant, EEE Parts Engineer Jeff Brown, LASP Controlled Stores Technician Dwight Reinhardt, LASP Cleaning Lab Technician

Sept. 2008EFW INST+SOC PDR EEE Parts, PWBs & GIDEP LASP’s EEE Parts Engineer, Cat Brant, will work with the RBSP Parts Control Board to assure that all parts have approval for use. –Will facilitate delivery of as-built parts list –Parts will be procured, and derated, to EEE-INST-002, Level 2 or better EEE spreadsheets used to track all pertinent information on a part-by-part basis, including TID, SEE, and Displacement Damage ratings Exceptions will require PCB approval through waivers/deviations Printed Wiring Boards –Coupon approval shall be obtained prior to population of flight PWBs. LASP’s GIDEP process described in Alert and Advisory Procedure (103782) –Sharon Dooley is LASP’s Alert and Advisory Coordinator and GIDEP representative. –Single point of contact for entire lab –Disseminates information to all programs

Sept. 2008EFW INST+SOC PDR PWA Build Processes Inspect and remand EEE parts to program-segregated controlled stores Evaluate PWBs, visual (coupon testing at APL) EEE component lead-forming Kitting inspection Electrical assembly with magnified, 100% visual inspections and photographs at key process points Aliveness testing Staking and conformal coating Final workmanship inspection and photographs Environmental burn-in Package and ship

Sept. 2008EFW INST+SOC PDR Workmanship Standards Certifications –NASA-STD , Staking and Conformal Coating –NASA-STD , Surface Mount Technology –NASA-STD , Soldered Electrical Connections –NASA-STD , Crimping, Cables and Harnesses –ANSI/ESD S20.20, Electrostatic Discharge Control LASP QA has certified Level B Instructors for all 5 disciplines Member of Process-Based Mission Assurance (PBMA) Knowledge Management System

Sept. 2008EFW INST+SOC PDR Contamination Control Cleaning provisions – PWBs cleaned and baked before assembly – Gloves used during all handling – All assembly done at Class 1000 flow-benches – PWAs cleaned prior to conformal coating – All materials compliant with NASA publication 1124 – Packaging and shipping provisions to maintain low contamination exposure during transport – No items on Materials Identification List (MIL) with marginal out-gassing /off-gassing characteristics Final bake-out process (RGA)

Sept. 2008EFW INST+SOC PDR ESD CONTROL PROGRAM ESD Control Program implemented by LASP QA –Mandatory training by LASP’s NASA-trained Level “B” ESD Control Instructor –Certification of lab users to the LASP ESD Procedure and ANSI/ESD S20.20 –Support for all assembly and test labs to ensure properly ESD-controlled environments