The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Polarized beams in RHIC A.Zelenski, BNL PSTP 2011, September 12, St.Petersburg.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
Mitglied der Helmholtz-Gemeinschaft Petersburg Nuclear Physics Institute, Russia Storage cells for internal experiments with Atomic Beam Source at the.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
7/30/99Douglas E. Fields for the E950 Collaboration 1 A CNI Polarimeter for RHIC Spin Results from IUCF CE75 & AGS E950 M. Bai, G. Bunce*, H. Huang, Y.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
K.O. Eyser --- Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region -1- Absolute Polarization Measurement at RHIC in the.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
Polarization Measurements of RHIC-pp RUN05 Using CNI pC-Polarimeter Itaru Nakagawa (RIKEN/RBRC) On behalf of CNI Polarimeter Group I.G.Alekseev A A.Bravar.
Polarization Measurement of 100GeV Proton Beams at RHIC with CNI pC Polarimeter Itaru Nakagawa (RIKEN/RBRC) On behalf of CNI Polarimeter Group I.G.Alekseev.
Proton Polarimetry at the U-70 Facility Sandibek Nurushev Institute for High Energy Physics, Protvino, Russia International Seminar on High Energy Spin.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Coherent Diffraction Radiation experiment Konstantin Lekomtsev, Grahame Blair, Gary Boorman, Pavel Karataev, Maximilian Micheler John Adams Institute at.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
A Possible Path Forward Current Polarimeter Upgrades Efforts A Possible Path Forward Current Polarimeter Upgrades Efforts Based on a proposal by Boris.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
1/30/2016Douglas E. Fields for the p+C CNI collaboration 1 Test of Small Angle Elastic Proton-Carbon Scattering as a High Energy Proton Beam Polarimeter.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Haixin Huang AGS Cold Snake: Status and Plans.
1 August CNI Carbon Polarimeter for AGS G. Atoian, H. Huang, Y. Makdisi, B. Morozov, A. Zelenski - Introduction - Detectors and Front-End - Front-End.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ApEx needs for CeC PoP Experiment December 11, 2015.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
T980 STATUS AND CHANGES FOR
Today’s topics; New AN and ANN results at s = 6.9 GeV
Presentation transcript:

The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn, D.Gassner, G.Mahler, S.Bugros, Y.Makdisi, H.Huang, M.Mapes, R.Todd, M.Sivertz, B.Morozov, R.Gill, A.Bazilevskiy …

New Proposed LEBT/MEBT, keV Spin-rotator Einzel lens OPPIS

New Proposed LEBT/MEBT, keV Spin-rotator Einzel lens OPPIS

A new 750 keV MEBT line

D.Raparia, APEX Workshop Dec.5

 So far the polarization and beam intensity profile measurements in both vertical and horizontal planes were limited by the long target switching time and possible target destruction during this complicated motion.  The RHIC polarimeters were operated near the limit of the counting rate for present silicon strip detectors and this could be a serious limitation for the further RHIC intensity and energy increase. The development of new detectors was very limited by the absence of development time during the polarized RHIC runs. The RHIC p-Carbon CNI polarimeter upgrade for the beam polarization and intensity profile measurements.

The ongoing CAD polarimeter upgrade project will address these problems for the 2009 polarized run.  The plan is two build and install the second polarimeter in each RHIC ring. These two polarimeters will be installed in new vacuum chambers with more powerful vacuum system to improve RHIC vacuum conditions. Two identical Carbon target motion mechanisms and detectors assembly will be installed in each chamber (both ring).  One polarimeter can be used for the vertical polarization and intensity profile measurements and the second can be used for the horizontal profile measurements. It will minimize number of target motions, speed up the measurements (increase efficiency of the stored beam use for about 5-10%) and reduce the risk of the target damages.

The RHIC p-Carbon CNI polarimeter upgrade for the beam polarization and intensity profile measurements (G.Mahler, S.Bugros)

 Additional set of detector ports will facilitate new detectors development, while keeping the established technique intact.  Two sets of targets will extend the period between target replacements and reduce the machine downtime.  Additional polarization and emittance measurements can be done with extra set of targets (polarization and emittance measurements during the energy ramp).

Vacuum system upgrade. Polarimeter will be pumped by two pumps (ion pump and NEG cartridge) isolated by vacuum valves. Diam. 8.0” (ID) nipples will provide sufficient conductance to utilize full pump capacity. Isolation valves will allow proper pump conditioning and faster turn around time after the venting. In future we plan to setup some moderate chamber baking after testing of polarimeter components (targets, detectors, Am-sources) tolerances to temperature.

Electronics upgrade. We will operate one polarimeter at the time (in each ring). This allows multiplexing of existing detector signal processing electronics. Also we will commutate the existing set of step-motor drivers between two polarimeters (no need for additional power supplies and cables). This will save money and also minimize software changes.

New target motion mechanism.

Target drives mechanical part Is near completed. Motion control tests and multiplexing are in progress.

New detectors development using BNL tandem facilities Carbon ion beam from BNL tandem facilities revealed (confirmed observation in RHIC) strong effect of carbon beam intensity on silicon strip detector operation presently used at RHIC polarimeter, which appeared as spectrum shift and distortion. New types of silicon detectors were selected, which have better properties and we plan to test these detectors during 2009 Run in RHIC polarimeter.

November 21 December 4, Blue-target drive installation Yellow-pumping, baking.

Target drives installation December 4

Yellow polarimeter baking, Dec.4 Vacuum torr Dec,15

Operation modes. Polarization measurement scan (main mode). Polarization, polarization profiles, beam intensity profile (including bunch-by bunch. Polarization measurement on the ramp (fixed target with some position adjustment, if necessary). Emittance measurements and calibration in fast scan mode, with dedicated targets.

Polarimeter upgrade commissioning. August- Design, procurement, September target drive prototype. October. Vacuum chamber delivery, baking, leak- check, installation. Target drive manufacturing. November. Installation in the tunnel. Vacuum system commissioning. Wiring. Tests. December. Pumping. Tests.

RHIC luminosity. Figure of merit LP 4.  = beam- beam tune shift. Luminosity: L =3f 0 BN 2  / 2  n  * B=120,  - 250GeV,  *=1.0m 250 GeV 2·10 32

Emittance measurement in AGS, single pulse at flattop. Sigma 0.96 mm~15 pi Horiz emittance Ev=6  (0.96) 2 ·25.3/10.0=14.0 .  h =096 mm

AGS Vertical emittance CNI scan (horizontal target). Intensity=1.6·  =25.3  *=21.7m Ev=6  (1.44) 2 ·25.3/21.7=14.5 .

AGS Emittances at Extraction (2006 setup). 15 pi Horiz. CNI 1.5·10 11 Vert. IPM Horiz IPM

20pi 8000

Polarization evolution during the store. March % 50%

Figure of merit optimization, L·P Y 2 P B 2 Integrated luminosity, lifetime

Blue.horiz. at store, Target #5, Febr.15.08

Target lifetime Carbon strip target is only 5-10  m wide and 4-5  g/cm 2 thick. This corresponds about atoms in the beam. The recoil Carbon production rate is about 10^8 atoms/s at present very high RHIC beam intensity), therefore after one hundred (10 s) measurements about 0.1% of carbon atoms are knocked out of the strip. Some targets survive for two weeks which corresponds to about 300 measurements.

 Additional set of detector ports will facilitate new detectors development, while keeping the established technique intact.  Two sets of targets will extend the period between target replacements and reduce the machine downtime.  Additional polarization and emittance measurements can be done with extra set of targets (polarization and emittance measurements during the energy ramp).  A new carbon target production technique (by the laser ablation developed at TRIUMF, Vancouver, Canada) will be also tested.  The polarimeter upgrade project is funded by CAD ($150k) and RIKEN ($75k) and planned to be completed by the end of December 2008 for operation in 2009 polarized proton run.

The RHIC p-Carbon CNI polarimeter. Ultra thin Carbon ribbon Target (5  g/cm 2 ) Si strip detectors (TOF, E C ) 18cm Polarized proton Recoil carbon Carbon target Elastic scattering: interference between electromagnetic and hadronic amplitudes in the Coulumb-Nuclear Interference (CNI) region. A N (pC)~1%