Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
RRP & PIT Deformation & RRR Comparison: M. Brown, C. Tarantini, W. Starch, W. Oates, P.J. Lee, D.C. Larbalestier ASC – NHMFL – FSU M2OrA – 05 06/30/15.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
1 SIS 300 Dipole Low Loss Wire and Cable J. Kaugerts, GSI TAC, Subcommittee on Superconducting Magnets Nov15-16, 2005.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
April-20, 2015MQXF Strand :Specification choices - A. Ghosh1 MQXF Strand: Available Implementations of various Cu/No-Cu in RRP April-20, 2015 LARP-CERN.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
Lessons learnt from CERN experience
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF cable with RRP wires for Q2
Development of Nb3Sn (and Bi-2212) strands in preparation for the FCC
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
CERN Conductor and Cable Development for the 11T Dipole
MQXF Short Models Status and Plans
To be presented at Nb3Al R&D Review,
Procurement of Nb3Sn strand for coils assembled at CERN
MQXF cable with RRP wires for Q2
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Development of Nb3Sn in Japan
Presentation transcript:

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans BNL -FNAL - LBNL - SLAC HiLumi-LHC/LARP Conductor and Cable Internal Review Oct 16-17, 2013 By Video Arup K. Ghosh (BNL)

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh2 Outline 1.Introduction 2.QXF Magnet Strand a.Specification 3.QXF Strand Procurement Plan a.Implementation of 169 design b.Details of Plan 4.Strand Evaluation 5.Summary

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh3 Introduction  For the QXF Magnets we use RRP® wire from Oxford Superconducting Technology  Strand diameter 0.85 mm  Whereas so far HQ has used Ta-Ternary strand, QXF will use Ti-Ternary Nb 3 Sn  (Nb- 1.5 at% Ti) 3 -Sn  Cable is a 40- strand Rutherford Cable with stainless steel core  Wire is currently based on the 108/127 design  Specification for the strand is a “performance - based specification” that satisfies the minimum requirements as set by the magnet design.

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh4 Ta-Ternary vs. Ti-Ternary 0.7 mm strand from CDP Influence of Ta and Ti doping on the irreversible strain limit of ternary Nb3Sn superconducting wires made with restacked-rod process* N. Cheggour, L. F. Goodrich, T. C. Stauffer, J. D. Splett, and X.F. Lu, A. K. Ghosh, G. Ambrosio Supercond. Sci. and Tech., 20, (2010) Ti-doped Nb 3 Sn wire more strain tolerant than Ta-doped  irr increases to 0.25 % from 0.04 % This has been confirmed for 0.8 mm (Nb-1.5 at% Ti) 3 -Sn strand  irr = % as well as strands with 108 and192 filaments. Expect 169 design to be similar.

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh5 Present Specification LARP-MAG-M-8004 Rev. A Strand Diameter, mm0.85 J c (12 T) at 4.2 K, A/mm 2 > 2650 I c, A> 684 J c (15 T) at 4.2 K, A/mm 2 > 1400 I c, A> 381 d s, µm (nominal)< 60 Cu-fraction, %> 53 Cu/non-Cu> 1.13 RRR > 150 Piece length> 750 m d s sub-element diameter J c Critical Current Density RRR residual resistivity ratio 108/127 Reduced-Sn content to obtain high RRR

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh6 Implementing 169 design wire  Motivation for adopting 132/169 (144/169) design wire  smaller filament diameter: increase stability, lower magnetization  HQ02 strand at mm is 108/127 For QXF with 0.85 mm strand a similar filament diameter requires 132 filaments. Note: 108 to 132 is only 10% change in filament diameter Cu/Non-Cu= 1.2

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh7 For LARP QXF magnet SQXF01 Magnet will use 108/127 strand Presenting a plan to use 169-strand in SQXF02 and in LQXF magnets In FY14 with CDP funds, contracts were placed at OST for 180 kg of 144 or132 filament strand with “Reduced-Sn” 90 kg of wire 169-design with 30% increased barrier thickness and “normal-Sn” content. LARP has an existing PO of 275 Kg for 108/127 meeting the specification shown previously Convert to 169- strand with “reduced-Sn”. All future LARP contracts in FY15 for 169-strand Implementing 169 design wire

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh8 Procurement Plan for QXF magnets  Require 12 + (1 PC) coils for SQXF; unit length 170 m  Require 17 + (1 PC) coils for LQXF; unit length 450 m  Assuming 10% loss in strand from cable mapping  Total length of strand for SQXF: ~ 470 Kg (94 km)  Total length required for LQXF: ~ 1760 Kg (352 km)  Present Inventory  350 Kg (Ti-Ternary 108/127 design)  200 Kg (Ta-ternary 108/127 design) Used for Practice coils  CDP (Conductor Development Program) will provide ~ 520 Kg  270 Kg 132/169 design  May – July’14  250 Kg  June’15  LARP procurement in FY’13 for 275 Kg (Ti-ternary 108/127)  Convert to 169-strand ?  Additional orders to be placed in FY15:  ~ 900 Kg, either as one lot or two lots of 550 and 350 Kg

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh9 Strand Procurement and Cabling Schedule For LARP QXF magnet Procurement and Cabling schedule set by the demands of coil fabrication Cabling start is set 4 months before start of coil winding Typical time for cabling is 2 weeks Braided Insulation at New England Wire 4 weeks Strand procurement time is presently at 13 months Partial delivery can start as early as 9 months

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh10 Strand Procurement and Cabling Plan

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh11

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh12 Cost and Yield In going from 54/61 to 108/127, the yield dropped by ~ 14% and the average piece-length decreased. Cost premium ~ 14%. Based on recent quote from OST, 144/169 wire cost is ~ 14% higher for the same performance specification. OST expects yield to be less than 108/127. Note that for the 132-filament strand the cost would be slightly lower (less Nb) and fractionally higher expected yield. 144 filament strand will have higher I c and lower Cu %. CERN procurement results can yield some insight in comparing 108/127 with 132/169. There is loss of J c as one goes from 54 to 108 to 132 filaments and a higher probability of lower RRR as the number of filaments increases for the same wire diameter. “Reduced-Sn” will mitigate this.

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh13 LARP Near Term Measurement Plan To fast-track the evaluation of the 169-strand, OST has offered one billet of 132/169 with “normal-Sn” delivered in early Jan’14 under the CDP contract. Plan to use this delivery to make lengths of QXF cable for evaluation and comparison with 108/127 strand cable Mechanical tests, metallographic test, electrical test using extracted strands windability, sub-element damage, cabling degradation HT optimization using 640 °C/48h, 650 °C/48h and 640 °C/96h. In Mar-Apr’14 we will use wire delivered under LARP contract which uses “reduced-Sn” to do a similar evaluation.

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh14 Summary Strand specification based on minimum I c, Cu fraction, RRR and piece-length and a specific strand design Plan shown implements 169-strand in SQXF02 magnet and all LQXF. Strand procurement has been planned to meet coil winding schedule. Cabling start precedes coil winding by ~ 4 months Specification and production QA plan to be formalized prior to placing contract in FY’15

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh15 End of Presentation

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh16 Risk Mitigation for strand For LARP QXF magnet Strand quantities outlined is just sufficient for the 17 coils of LQXF Loss of UL during cabling assumed to be zero. Typically this happens if there is a strand cross-over in the cable. This is low risk as cabling at LBNL has not experienced such an event. Plan to have an option in the 350 Kg lot order for extra 200 Kg of wire sufficient for 2 Unit Lengths of LQXF ?

Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh17 Nov 8-10, Arup Ghosh 17 Conductor Qualification -1 Billet Qualification –Rely on OST data –Meets minimum performance specification –OST data will be cross-checked with measurements of at least one sample per billet Cable Qualification –This is important and needs to be completed prior to coil winding. –Mechanical tests, metallographic test, insulation thickness –Electrical test: minimum 3 extracted strand and one round wire –Heat Treatment schedule (HT) as specified for coil reaction Coil HT Qualification –Witness sample tests of extracted strands –Tests done at one measurement laboratory –Minimum of four extracted strand and one round wire