Oct. 2 - 3, 2006P. Padovani, 1st DCA Board Meeting1 VO Activities at ESO Paolo Padovani, ESO Head, VO Systems Department, DMD EURO-VO Facility Centre Scientist.

Slides:



Advertisements
Similar presentations
VO/IVOA and The Astronomy Community Dave De Young NOAO.
Advertisements

ESO-ESA Existing Activities Archives, Virtual Observatories and the Grid.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
Paolo Padovani, May 23, 2007, e-Science in Chile - 1 e-Astronomy: the Virtual Observatory and its implementation Paolo Padovani Head, Virtual Observatory.
Who does what and when? Mary Rowlatt MDR Partners.
ADASS, London Sep 23-26, 2007 VOExplorer : Visualising Data Discovery in the Virtual Observatory Jonathan Tedds University of Leicester/AstroGrid/ EuroVO.
Introduction to Spitzer and some applications Data products Pipelines Preliminary work K. Nilsson, J.M. Castro Cerón, J.P.U. Fynbo, D.J. Watson, J. Hjorth.
Long-Term Preservation of Astronomical Research Results Robert Hanisch US National Virtual Observatory Space Telescope Science Institute Baltimore, MD.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
Deploying the AstroGrid: Science Use for the Black Hole Census Deploying the AstroGrid: Science Use for the Black Hole Census Nicholas Walton Institute.
1 The EIS Experience: Lessons Learned May 12, 2005.
VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Welcome to: DS4 * User Tools WP Manager Markus Dolensky, ESO * DS... Design.
AVO Status June 2002 Status M. Dolensky. AVO Status June 2002 WA0 - European Initiatives Enabling a Virtual Observatory for Europe EVOE –Submitted expression.
Markus Dolensky, ESO Technical Lead The AVO Project Overview & Context ASTRO-WISE ((G)A)VO Meeting, Groningen, 06-May-2004 A number of slides are based.
Summary of distributed tools of potential use for JRA3 Dugan Witherick HPC Programmer for the Miracle Consortium University College.
Paolo Padovani, October 15, 2007, VO Workshop, IUCAA, Pune - 1 The Virtual Observatory: an Overview Paolo Padovani Head, Virtual Observatory Systems Department,
1 27-Apr-2004AstroGrid Consortium Meeting - PL talk Agenda Tuesday status review / goals / science Lunch + AGLI Itn-05 review Dinner at Coton (share.
Advanced Data Products at ESO P.Rosati (DMO/VOS) with special thanks to: B.Vandame, C.Rite, J.Retzlaff, R.Slijkhuis, M.Nonino Faculty Meeting - Dec 13,
An established ESA-ESO cooperation. 15/16 ESOST-ECF2 What is the ST-ECF? Established at ESO in1984 following an open call-for-proposals Fourteen.
Science Processes in VOTECH Nicholas Walton AstroGrid Project Scientist and Euro-VO VOTC Project Scientist IoA, Cambridge 18 Nov2004.
The Astrophysical Virtual Observatory to EURO-VO transition Paolo Padovani ESO Virtual Observatory Systems Department EURO-VO Facility Centre Scientist.
Virtual Survey System sept 04 ASTRO-WISE- federation OmegaCEN AstroWise a Virtual Survey System OmegaCAM – Lofar – AstroGrid –((G)A) VO AstroWise a Virtual.
The Virtual Observatory Europe and the VO: the Astrophysical Virtual Observatory and the EURO-VO Astrophysical Virtual Observatory and the EURO-VO Paolo.
Common Archive Observation Model (CAOM) What is it and why does JWST care?
1 ASTRONET Coordinating strategic planning for European Astronomy.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
Solar and space physics datasets within a Virtual Observatory: the AstroGrid experience Silvia Dalla * and Nicholas A Walton  * School of Physics & Astronomy,
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Introduction / Context.
EURO-VO Structure Data Centre Alliance (DCA) A collaborative and operational network of European data centres who, by the uptake of new VO technologies.
March 1st, 2006Prospective PNG PNG: Databases - Virtual Observatory.
MAST Users Group – July 9, 2009 other planned and ongoing projects within MAST.
Workshop on How to Publish Data in the VO ESAC, June 25-June Publishing Combined Image & Spectral Data Packages (Mex Images & Spectra) M. Sierra,
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
NEON School NEON Archive Observing School Alberto Micol ESA Space Telescope Operations Division 15 July 04 ESO & HST Archives.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
SVO: The Spanish Virtual Observatory Enrique Solano, LAEFF / SVO Partner’s VO Project  Census of Spanish Data Centres Partner.
VO DCA WP5 EuroVO-DCA Review, 10 January 2007 Giuliano Taffoni & Fabio Pasian - INAF EuroVO DCA WP5 Coordination with Computational Grid Projects G. Taffoni.
Paolo Padovani, VO Overview, 23/6/08, EURO-VO DCA Workshop - 1 The Virtual Observatory: an Overview Paolo Padovani Head, Virtual Observatory Project Office,
WP4 - VO-enabled services to the science community Euro-VO AIDA – First periodic review – 24 April 2009 Paolo Padovani, AIDA Project Scientist 1 AIDA WP4.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
WP8 – Assessment of emerging technologies EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP8 Assessment of emerging.
WP2 status and plans First PMT meeting, May , Strasbourg Françoise Genova WP2 status and plans.
TCG Meeting, May 15, IVOA Science Requirements - 1/14 Science Requirements and IVOA Standards Paolo Padovani on behalf of the Take-Up Committee.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
1 15-Dec-2004Andy Lawrence : AstroGrid Consortium Meeting, Edinburgh AstroGrid2 and Euro-VO AstroGrid and AVO Euro-VO VO-TECH project How to manage the.
Christophe Arviset Paolo Padovani EURO-VO DCA Review, EC, Brussels, 10/01/2008 page 1 DCA WP3 Report Support to take-up and implementation of the VObs.
Introduction to the VO ESAVO ESA/ESAC – Madrid, Spain.
P. Padovani, September 15, ESO VO Day - 1/15 The Virtual Observatory Paolo Padovani Head, Virtual Observatory Project Office, ESO EURO-VO Facility.
P. Padovani, March 30, 2009, Euro-VO AIDA School - 1/19 The Virtual Observatory Paolo Padovani Head, Virtual Observatory Project Office, ESO EURO-VO AIDA.
Publishing Combined Image & Spectral Data Packages Introduction to MEx M. Sierra, J.-C. Malapert, B. Rino VO ESO - Garching Virtual Observatory Info-Workshop.
Christophe ARVISET EURO-VO AIDA Kick-Off, 17-18/03/2008, Strasbourg, page 1 ESAVO Project WP3 – SA1 Service activities in support of deployment of IVOA.
Project overview First Board Meeting – 2&3 October 2006 Françoise GENOVA, EuroVO-DCA Coordinator EuroVO Data Centre Alliance Project overview.
WP4 - VO-enabled services to the science community Euro-VO AIDA – Final review – 5 October 2010 Paolo Padovani, AIDA Project Scientist 1 AIDA WP4 Report.
ESA Scientific Archives and Virtual Observatory Systems Science Archives and VO Team Research and Scientific Support Department.
VO Data Access Layer IVOA Cambridge, UK 12 May 2003 Doug Tody, NRAO.
Photometry Data Model v0.2| Jesus Salgado | ESAC | 09 Dec 2010 | IVOA Interop Nara | Pag. 1/13 Photometry DM Working Draft 0.2 Jesus Salgado
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
RI EGI-InSPIRE RI Astronomy and Astrophysics Dr. Giuliano Taffoni Dr. Claudio Vuerli.
Critical Design Review, April 2003
DCA WP3 Report Support to take-up and implementation of the VObs framework Christophe Arviset (ESA-VO) Paolo Padovani (ESO) Christophe Arviset (ESA),
WP 2 Definition of the EuroVO-DCA Strategy
aspects of archive system design
EuroVO-DCA Support to Data Centres from non-partner countries Enrique Solano INTA- Spanish VO EuroVO-DCA WP6 coordinator.
Concluding Remarks Paolo Padovani Head, Virtual Observatory Project Office, ESO, Garching bei München, Germany & EURO-VO Facility Centre.
Moving towards the Virtual Observatory Paolo Padovani, ST-ECF/ESO
Observing with Modern Observatories (the data flow)
Presentation transcript:

Oct , 2006P. Padovani, 1st DCA Board Meeting1 VO Activities at ESO Paolo Padovani, ESO Head, VO Systems Department, DMD EURO-VO Facility Centre Scientist

Oct , 2006P. Padovani, 1st DCA Board Meeting2 ESO Paranal 12 instruments offered at last call (Sept. 29) [+ 2 sub-mm]

Oct , 2006P. Padovani, 1st DCA Board Meeting3 ESO La Silla 8 instruments offered at last call (Sept. 29)

Oct , 2006P. Padovani, 1st DCA Board Meeting4 The ESO archive

Oct , 2006P. Padovani, 1st DCA Board Meeting5 The ESO archive: VO challenges 1.Ground-based: calibrations/observing conditions changing on a nightly basis 2.Varied: 20 different instruments, ranging from imagers and spectrographs to polarizers and interferometers; optical and sub-mm 3.Evolving: 2nd generation VLT instruments coming + Public Surveys and ALMA 4.Large: currently 100 Tb (compressed), expected growth x 15 in the next ~ 6 years

Oct , 2006P. Padovani, 1st DCA Board Meeting6 VO-compliant archive The VO requires data centres to have a “VO-layer” to: “translate” any locally defined parameter to the standard (IVOA compliant) ones (e.g., RA can be called in many different ways) hide any observatory/telescope/instrument specific detail and work in astronomical units: e.g., wavelength range/band (not grism or filter name), spectral resolution, field of view, limiting magnitude  provide the right meta-data (data about data) The VO will work at best with high level “science-ready” data  data centres should make an effort to provide such data

Oct , 2006P. Padovani, 1st DCA Board Meeting7 E S O VO Systems (VOS) department created in the Data Management & Operations Division (DMD) Nov to formalize ESO VO work. Its tasks: make the ESO archive into a real scientific resource for the ESO community by: creating, ingesting, and publishing “Advanced Data Products” (ADP) [science ready, level 3] making the archive “VO-compliant” [provide access via VO standards and tools] develop VO technology, standards, and tools develop the VO Facility Centre with ESA take care of all ESO archive interfaces (Jan 2006)

Oct , 2006P. Padovani, 1st DCA Board Meeting8 VOSystems Paolo Padovani Advanced Data Products Piero Rosati Facility CentreVO Technology Markus Dolensky Paul Harrison J.-C. Malapert Bruno Rino Fabien Chereau (Oct. 06) Nausicaa Delmotte Jörg Retzlaff Charles Rite Remco Slijkhuis Benöit Vandame Myha Vuong (DFO) NN (DCA funded) 14 FTEs, 3 EC funded (2 VO-TECH+ 1 DCA) Andreas Wicenec E. Hatziminaoglou (Dec. 06) VOS Dept.

Oct , 2006P. Padovani, 1st DCA Board Meeting9 Current ESO VO Work 1.Improved archive interface ( [VO Table format output, prototype SIA service] 2.Science-driven requirements already implemented into ESO metadata repository and data models to serve both the real and virtual observatory (behind the scene) 3.Creation of Advanced Data Products (ADP = “science- ready” data) 4.Preparation well under way for ADP ingestion and publication (metadata extraction and mapping tool)  

Oct , 2006P. Padovani, 1st DCA Board Meeting10 ESO Science Archive New Interface A first step towards a VO-compliant interface Complex queries by: Coordinates, target name Input lists Scheduling info. Proposal information Instrument, obs cat. As of 4 Apr 2005, ESO SAF is open worldwide to the astronomical community VO Table

Oct , 2006P. Padovani, 1st DCA Board Meeting11 ADP Production 1.Built the ADP/MVM data reduction system for the production of ADP, specifically for ISAAC, WFI, VIMOS, SOFI and other VLT imaging instruments (based on the EIS/MVM software) 2.Released on Sept the ISAAC/GOODS ADP, reduced with the ADP/MVM (astrometrically calibrated stacked images and mosaics reduced from 11,600 science frames, 10,600 calibration frames, photometrically calibrated using SOFI data) 3.Part of the GOODS/ESO Public Programme in Chandra Deep Field South (PI: Cesarsky) 4.Deepest large nearIR field carried out to date: 160 arcmin2 in J & K, 127 arcmin2 H (J, H, K: 25.5, 25, 25 ABlim at 5s) ISAAC/GOODS release Sept Extensive use by worldwide community; complements HST and Spitzer data for galaxy evolution studies out to z~7 Users highly satisfied with data quality ( ” seeing, good inter-calibration)

Oct , 2006P. Padovani, 1st DCA Board Meeting12 ADP Ingestion & Publication 1.ADP currently scattered around the community will be collected, validated and published into archive (according to detailed guidelines) [paradigm change] 2.ESO now requires ADP from Large Programs and upcoming VST & Vista surveys 3.Science-ready imaging ADP are being produced by ADP/MVM 4.A “VO-compliant” data ingestion interface is being developed

Oct , 2006P. Padovani, 1st DCA Board Meeting13 EURO-VO Projects DCA! VO-TECH: work integrated within ESO (SED builder [mag. to flux conversion], user certification [Single- Sign-On], VOSpace specification and prototype) Facility Centre: a joint ESO/ESA activity, physically located at ESO

Oct , 2006P. Padovani, 1st DCA Board Meeting14 The EURO-VO FC An operational organization, that provides the EURO-VO with a persistent, centralized registry for resources, standards and certification mechanisms as well as community support for VO technology take-up and scientific programs (the EURO-VO “public face”) At present, resources provided by ESO & ESA at a “best-effort” level (≈ 1 FTE; no EU funding: FP7 proposal!?) EURO-VO FC Astronomer, Evanthia Hatziminaoglou, will join VOS on Dec. 1 First Activities: ✦ Selection of EURO-VO Science Advisory Committee; held first meeting in April at ESO, second meeting planned for Nov. 22 at ESRIN ✦ New EURO-VO Web pages ( ✦ EURO-VO technical workshop (ESO June 2005), with EURO-VO partners (

Oct , 2006P. Padovani, 1st DCA Board Meeting participants from 47 institutions and 16 different countries EURO-VO Workshop Jun July

Oct , 2006P. Padovani, 1st DCA Board Meeting16 Our Plans 1.More ADP (internal and above all from ESO PIs) 2.Brand new VO-compliant archive interface (based on metadata registry) part of new ESO portal 3.VO tools to enhance archive interface: e.g., Visualization of multi-wavelength data sets/observations building on AVO and AstroVirtel experience Integrated browsing of imaging and spectral data Flux conversions based on optical element database Spectral Energy Distribution building, spectral templates and models 4.Data quality (Quality Control products) 5.All this by 2008

Oct , 2006P. Padovani, 1st DCA Board Meeting17 DCA Project ESO’s interests: 1.WP3, lead with ESA (16 person-months) 2.WP6 (2 person-months) WP3 is the largest WP in terms of FTEs (68/170 p-m) and includes also: CNRS, INAF, INTA, NOVA, LU Preliminary Data Centre census: first input of “essential VO archives” was given by the SAC at its first meeting. It includes ~ 35 entries