SUPERCOMM 2003 June 2, 2003 NRIC VI Focus Group 2 – Network Reliability Co-Chairs: PJ Aduskevicz, AT&T Ross Callon, Juniper Networks Wayne Hall, Comcast.

Slides:



Advertisements
Similar presentations
NANC Report Numbering Oversight Working Group (NOWG) March 15, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Advertisements

Cost Recovery Working Group NANC Report Billing & Collection Working Group (B&C WG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Jim Castagna, Verizon.
K. F. Rauscher November 2004 C Q R Welcome IEEE COMMUNICATIONS SOCIETY Emergency Power Conference Monday, November 22, 2004 Bell Labs Network Reliability.
1 Focus Group 2.B2 Network Reliability - Data Reporting & Analysis for Packet Switching NRIC V Council Meeting - October 30, 2001 Paul Hartman, Beacon,
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Mark Lancaster, AT&T Suzanne Addington, Sprint December 9, 2014.
NRIC IV Network Reliability and Interoperability Council IV Washington, DC July 14, 1999 Subcommittee 2: Data Analysis and Future Considerations PJ Aduskevicz.
TIA Activities Supporting Wireless Alerts David Su Chief, Advanced Network Technologies Division NIST SOURCE:TIA TITLE:TIA Activities Supporting Wireless.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Suzanne Addington, Sprint Kathy Bakke, Wisconsin PSC Mark Lancaster, AT&T September.
NANC Report Numbering Oversight Working Group (NOWG) December 13, 2012 Co-Chairs: Laura Dalton, Verizon Communications Natalie McNamer, T-Mobile USA Karen.
Review of Hurricane Isabel 1 (September 2003) December 5, 2003 PJ Aduskevicz NRIC VI Focus Group 2 Co-Chair NRSC Chair.
Working Group 11: Consensus Cyber Security Controls March 14, 2013 Alan Paller, SANS Institute Marcus Sachs, Verizon Communications WG 11 Co-Chairs.
Review of Power Blackout on Telecom P. J
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Book 2.final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
Focus Group 2 Network Reliability
Federal Communications Commission Communications Security, Reliability and Interoperability Council Working Group 6 – Best Practice Implementation Stacy.
Network Reliability Steering Committee (NRSC) Overview and NRSC CAMA Trunk Throughput Optimization Analysis Stacy Hartman – CenturyLink Robin Howard.
WORKING GROUP 4A BEST PRACTICES FOR RELIABLE AND E9-1-1 FINAL REPORT CRAIG W. DONALDSON, SENIOR VICE PRESIDENT REGULATORY AND GOVERNMENT AFFAIRS,
Industry Collaboration to Achieve Network Security The Network Reliability and Interoperability Council Jeffery M. Goldthorp Chief – Network Technology.
Web-centric BusinessNRIC V – February 27, 2001 NRIC V Council Meeting - February 27, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
Steering Committee Working Group 6 Best Practice Implementation October 7, 2010 Stacy Hartman Steve Malphrus Co-Chairs.
December 6, 2002 M. Roden / D. Dautel FOCUS GROUP 1C Public Safety Report to NRIC VI Council December 6, 2002 Co-Chairs Mike Roden - Cingular Wireless.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
Focus Group 4 Interoperability NRIC V Council Meeting October 30, 2001 Ross Callon Juniper Networks Scott Bradner Harvard University Co-chairs, Focus Group.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
Focus Group 2 Network Reliability PJ Aduskevicz, AT&T Ross Callon, Juniper Networks Wayne Hall, Comcast Cable Communications.
North American Numbering Council (NANC) Billing & Collection Working Group (B&C WG) March 5, 2015 Co-Chairs: Tim Decker, Verizon Rosemary Emmer, Sprint.
Citizen to Government Communications ATIS’ Emergency Services Interconnection Forum (ESIF) Maureen Napolitano ESIF 1 st Vice Chair ANSI-HSSP Workshop Schaumburg,
North American Network Operations Group (NANOG) October 23, 2000 Washington, DC PJ Aduskevicz AT&T.
NRIC EDUCATIONAL OUTREACH March 14, 2003 Pamela J. Stegora Axberg NRIC VI Steering Committee Chair
NRIC VI 1 Pam Stegora Axberg Qwest
Focus Group 4 Interoperability NRIC V Council Meeting February 27, 2001 Ross Callon Juniper Networks Scott Bradner Harvard University Co-chairs, Focus.
14 April 1999 NRIC IV Agenda: 14 April 1999  Introductions  Opening comments  Frank Ianna -- President, AT&T Network Services  Michael Powell -- FCC.
NRIC VI Focus Group 4 - Broadband Doug Davis - FG4 Chairman September 15, Status Update.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
P ACKET S WITCHING B EST P RACTICES October 30, 2001 K ARL F. R AUSCHER Chair - Focus Group 2, Subcommittee A2 Director – Network Reliability Bell Labs.
PAMELA J. STEGORA AXBERG Chair, NRIC VI Steering Committee Qwest Senior Vice President Network Reliability Office:(763) Fax:(763)
Focus Group 4 Interoperability NRIC V Council Meeting June 26, 2001 Ross Callon Juniper Networks Scott Bradner Harvard University Co-chairs, Focus Group.
North American Numbering Council (NANC) Billing & Collection Working Group (B&C WG) March 27, 2014 Co-Chairs: Tim Decker, Verizon Rosemary Emmer, Sprint.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Mark Lancaster, AT&T Suzanne Addington, Sprint June 17, 2014.
2 Gordon Barber March 14, 2003 Focus Group Committee Chairs F Cable: John Thrower (Cox Communications) F CLECs: Robert Smith (McLeod USA) F Equipment.
Working Group 4B: Network Timing Single Source Risk Reduction Status Update December 3, 2015 Jennifer A. Manner, Chair.
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Network Reliability and Interoperability Council VII NRIC Council Meeting Focus Group 1C Analysis of Effectiveness of Best Practices Aimed at E911 and.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint December.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint Sept.
Focus Group 2 Network Reliability PJ Aduskevicz, AT&T Ross Callon, Juniper Wayne Hall, Comcast.
1 Focus Group 2.B2 Network Reliability - Data Reporting & Analysis for Packet Switching NRIC V Council Meeting - June 26, 2001.
2 Gordon Barber March 14, 2003 Focus Group Committee Chairs F Cable: John Thrower (Cox Communications) F CLECs: Robert Smith (McLeod USA) F Equipment.
H OMELAND S ECURITY P HYSICAL S ECURITY (Focus Group 1A) Update to Council September 15, 2003 K ARL F. R AUSCHER Chair Homeland Security Physical Security.
Network Reliability and Interoperability Council Focus Group 3 April 14, 1999 Ray Albers- Bell Atlantic Focus Group III Chair.
Web-centric BusinessNRIC V – June 26, 2001 NRIC V Council Meeting - June 26, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
PAMELA J. STEGORA AXBERG Chair, NRIC VI Steering Committee Qwest Senior Vice President National Networks Office:(612) Fax:(612)
Working Group 8: Priority Services CSRIC V Meeting March 16, 2016 Thomas Anderson, Co-Chair (Cisco) Bill Reidway, Co-Chair (Neustar)
ESIF Emergency Services Interconnection Forum (ESIF) Bob Montgomery ESIF 1 st Vice Chair.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Mark Lancaster, AT&T Suzanne Addington, Sprint Sept 17, 2014.
NANC Report Numbering Oversight Working Group (NOWG) March 24, 2016 Co-Chairs: Laura Dalton, Verizon Karen Riepenkroger, Sprint 03/24/20161.
© Copyright 2004 Frost & Sullivan. All Rights Reserved. Vertical IT and Telecom Spending Trends - U.S. Retail Sector Implementation of tracking technology.
Working Group 6: Secure Hardware and Software – Security by Design Deliverable 2 Status Update June 22, 2016 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli,
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
P ACKET S WITCHING B EST P RACTICES February 27, 2001 K ARL F. R AUSCHER Chair - Focus Group 2, Subcommittee A2 Director – Bell Labs Network Reliability,
Analysis of Network Outage Reports
Analysis of Network Outage Reports
NANC Report Numbering Oversight Working Group (NOWG)
Industry Numbering Committee (INC) Report to the NANC
Focus Group Committee Chairs
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
STI-GA Update to the NANC
Number Administration Oversight Working Group (NAOWG)
Presentation transcript:

SUPERCOMM 2003 June 2, 2003 NRIC VI Focus Group 2 – Network Reliability Co-Chairs: PJ Aduskevicz, AT&T Ross Callon, Juniper Networks Wayne Hall, Comcast Cable Communications

Focus Group Mission Statement  Define reliability measurements (units) for commercial communications networks (i.e., wireline and wireless transport networks, including satellite and cable) and for the Internet by March 22,  Define reasonable, measurable customer-affecting outage reporting thresholds for commercial communications networks (i.e., wireline and wireless transport networks, including satellite and cable) and for the Internet by March 22,  Conduct voluntary outage reporting trial, collect data, analyze results, and report on the validity, usefulness, and timeliness of the process and information obtained, and make recommendations for improvement.  Based on trial results (including information on services affected by an outage), evaluate and report on the reliability of public communications network services in the United States.  Should the Commission initiate an inquiry or rulemaking with respect to any of the above-mentioned issues, the Focus Group will provide input to the NRIC, which may make formal recommendations as a part of such proceeding(s).  Evaluate, and report on, the reliability of public telecommunications network services in the United States.

Focus Group Membership PJ Aduskevicz, AT&T Bonnie Amann, Sprint Ken Buckley, Federal Reserve Board Robert Burkhardt, Nextel Ross Callon, Juniper Rick Canaday, AT&T Kevin Cavanagh, AT&T Wireless Wayne Chiles, Verizon John Clarke, NCS/NCC Joe Craig, Qwest Bernie Farrell, NCS David Fears, Cox Communications Lee Fitzsimmons, Nextel Brian Goemmer, Western Wireless Jeff Goldthorp, FCC Wayne Hall, Comcast Bruce Harrod, C&W John Healy, FCC Dean Henderson, Nortel Networks Bob Holley, Cisco Robin Howard, Verizon Bruce Johnson, Verisign Rick Kemper, CTIA Bill Klein, ATIS Bernie Ku, WorldCom Jim Lankford, SBC Greg Larson, Exodus/CWUSA Mike Lecocke, SBC Bill lewis, EarthLink Chris Liljenstolpe, CW Chris MacFarland, Allegiance Spilios Makris, Telcordia Archie McCain, BellSouth Dave McDysan, WorldCom Brian Micene, AT&T Wireless Denny Miller, Nortel Erick Mogelgaard, Cox Brad Nelson, Marconi Chris Oberg, Verizon Wireless Gary Pellegrino, CommFlow Resources Bonnie Petti, Verizon Wireless Sam Phillips, BITS Christopher Quesada, PAIX.net Karl Rauscher, Lucent Tony Reed, Charter Arthur Reilly, Cisco Systems Ira Richer, The Telesis Group Jim Runyon, Lucent Andy Scott, NCTA Don Smith, NCS Ron Stear, C&W Sandy Stephens, Focal Dorothy Stout, NCS/NCC Jeff Swinton, Conexion Corp. Whitey Thayer, FCC Robert Vogel, PanAmSat Corp. Doug Williams, Comcast Cable

Voluntary Trial Outage Reporting Units and Thresholds Type of Internet AccessCustomer DefinitionComments CableHouseholdWhether they are actively using it or not at the time of the outage Dial-UpDial-Up PortWhether or not the port is in use at the time of the outage DSLHouseholdWhether they are actively using it or not at the time of the outage SatelliteHouseholdWhether they are actively using it or not at the time of the outage WirelessCustomers or Blocked Calls Historical trends may be used

Internet / IP Service Provider Inter-Domain Routers PSTN DSL Wireless Cable Dial-Up DNS RADIUS DHCP Core Backbone Distribution Service Aggregation XYZ Corp

Contents of Confidential Outage Reports Reporting carrier / service provider Contact person Telephone number of contact person Start date Start time of impact Geographic area affected Estimated number of customers affected Types of services affected (if applicable) Duration of outage (hours and minutes) Apparent or known cause Name of equipment involved [OPTIONAL] Type of equipment involved [OPTIONAL] Specific part of network involved Methods used to restore service [OPTIONAL] Steps taken to prevent recurrence Root cause and trouble found [OPTIONAL] Applicable best practice [OPTIONAL] Purpose of the Voluntary Outage Reporting Trial Derive information from the analysis of outage reports that is useful in evaluating and improving the reliability of increasingly important Data and Wireless Voice Networks, as has been done by the Network Reliability Steering Committee (NRSC) for Circuit Switched Voice Networks over the last ten years.

Service Provider NCS / NCCFocus Group 2NRIC VI & Industry If yes If no NCS/NCC Logs Report Determine if Outage meets Trial Criteria Outage Occurs Create Initial Report Within 3 days Send to NCS / NCC Conduct Root Cause Analysis Identify Best Practice Send Final Report Within 30 Days Approve Scrubbed Report Local Analysis Collect, Validate and Send Data 1 2 initial final Scrub Data per Criteria established By FG2 Scrubbed Data Received by FG2 Analyze Scrubbed Data, Review BP coverage Provide Status at NRIC VI Council meetings Make Recommendations Monitor Progress Concur or Provide Input on Recommendations Develop Final Report to Include Recommendations File Final Report initial final 3 NRIC VI Voluntary Outage Reporting Trial Process

Voluntary Outage Reporting Trial Results to Date MonthReporting Organizations January4 February10 March12 April13

Voluntary Outage Reporting Trial Results to Date

Voluntary Outage Reporting Trial – Conclusions  All participating organizations should submit a positive report if no outages that met the Voluntary Outage Reporting Trial thresholds occurred during the month.  More complete information on the outage reports regarding the cause of the outage and the applicable best practices would improve the analysis of the data and consequently increase the benefit of the Voluntary Outage Reporting Trial to the industry.  The industry should take note of existing NRIC Best Practices, as well as industry activities identified by the Network Reliability Steering Committee (NRSC) and the Common Ground Alliance (CGA), to mitigate outages related to fiber optic cable damage.  NRIC Best Practices are also available for use in other areas identified in the scrubbed outages reports submitted to date, including software design errors, hardware failures, power failures, procedural errors, and maintenance procedures. For the Initial Stage of the Voluntary Trial  Results are promising.  Metrics/Indicators are going in the right direction.  Initial Report published this week to NRIC Council members.

Participating Organizations Providing Technical Contacts  Allegiance  AT&T  AT&T Wireless  BellSouth  C&W  CenturyTel  Charter Communications  Cingular  Comcast Cable Communications  Cox Communications  EarthLink  Focal Communications  Intelsat  Level 3  McLeod  Nextel  NSF  PanAmSat  Qwest  Sprint  SBC  T-Mobile  Time Warner Cable  Verisign  Verizon  Verizon Wireless  Western Wireless  WorldCom

Focus Group 2 – Ongoing Work  Voluntary Outage Reporting Trial Process Improvements  Model outage reports by network type  Outage report withdrawal process  Positive communication with all technical contacts  Continue Enhancement of Voluntary Outage Reporting Trial Guidelines Document  Continue Review of 47 C.F.R.§  Publish final report in December 2003