Getting Ready for Net Zero Laurie L. Goscha, Bailey Edward Sachin Anand, dbHMS.

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
BIM EXECUTION PLANNING PROCESS
OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
1 Expertly Engineering Safety From Fire NFPA 25 As A Means to Improve Sprinkler System Reliability William E. Koffel, P.E., FSFPE President Koffel Associates,
Continuous Value Enhancement Process
1 RFP PROCESS FOR BANKING Presented by: Martin McConahay, District 39 Jackie Schimizzi, Consultant Kimberly Feeney, Bank of America.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Building and Energy Consultants Lloyd Hamilton, owner IGSHPA Certified Geothermal Designer IGSHPA Certified Installer Net-Zero Energy Building Specialists.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Software Developer By: Charlie Edwards Period 6 th Mrs. Truong.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Linking Objectives to Programs EPA Regions 9 & 10 and The Federal Network for Sustainability.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Chapter : Software Process
Process: A Generic View
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Course # Unit 3 - IEMP and PEMS. Unit 3 IEMP and PEMS Goals: Understand phases of emergency  Before the emergency (Mitigation, Prevention,
What is Value Analysis? Value Engineering a.k.a. Architorture”
Chapter 2 Process: A Generic View
What is Marketing?  Marketing is about meeting the needs and wants of customers;  Marketing is a business-wide function – it is not something that operates.
Tom MAZOUR IAEA, Division of Nuclear Power
Chapter 2 Process: A Generic View
Specification & Quantities Estimating
Overview of the draft work programme of the CGE First meeting of reconstituted Consultative Group of Experts on National Communications from Parties not.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
EVALUATION OF LOCAL PILOT SLOVENIA “Active after 50” Vanja Hazl Edinburg, December 2010.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Department of Energy EVM Update NDIA Program Management Systems Committee August 17, 2005 Mike Donnelly Office of Engineering and Construction Management.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Sistemas de Información Agosto-Diciembre 2007 Sesión # 9.
Software Engineering CE 501 Prepared by : Ashwin Raiyani.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Road Investment Decision Framework
Introduction to Energy Efficient Design
Devin Rauss Building California’s Flexible Grid October 27, 2018
BIM EXECUTION PLANNING PROCESS
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Administration of a FIDIC Contract - Pre-Contract Phase -
Global 8D Problem Solving
(Additional materials)
Enterprise Content Management Owners Representative Contract Approval
Lifecycle Services for Advanced Wireless LAN (LCSAWLAN) practice-questions.html.
Supporting learning in practice
BIM EXECUTION PLANNING PROCESS
بازاریابی و بازرگانی زمستان 93.
What Will You Learn 1. How To Plan Projects
PROJECT DELIVERY METHODS
What is Project Management?
Engineering Processes
CCWF(e)L Workshop Workshop 1 documentation Work in groups
Nuclear Energy Programme Implementing Organisation
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Software Reviews.
Workshop: Equipment June 29, 2006.
Project Process Gather information Set up team Plan project
Stakeholder Engagement
Fall 2013 Migrant Director Workshop
Common strategy development process I
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Getting Ready for Net Zero Laurie L. Goscha, Bailey Edward Sachin Anand, dbHMS

Why Net Zero? Definition Policy Requirements Practical Limits and Results Net Zero through Emerging Technologies2

Focus Area Definition of a military base Existing base considerations Net Zero through Emerging Technologies3

Focus Area Installation energy consumption Net Zero through Emerging Technologies4

5 Steps to Achieve Net Zero Preparation Information Energy Workshop Presentation Implementation Net Zero through Emerging Technologies5

Net Zero through Emerging Technologies6 Preparation Establish the Team Define the Project Planning Meeting FinancialOperationalPerformance Owner/ Operator Project Financing Adherence to Predicted OperationUsage Schedule / Maintenance Design Engineer Energy Prices / Escalation RateCommissioningDesign Energy Modeler Energy Prices / Escalation Rate Model Calibration / Data Processing Controls Contractor Construction DelaysCommissioning / CalibrationConstruction

Net Zero through Emerging Technologies7 Information Survey existing conditions Document

Net Zero through Emerging Technologies8 Information Model energy consumption

Net Zero through Emerging Technologies9 Information

Net Zero through Emerging Technologies10 Energy Workshop Function

Net Zero through Emerging Technologies11 Energy Workshop Function AASFReadiness CenterHanger Area

Net Zero through Emerging Technologies12 Energy Workshop Speculation

Net Zero through Emerging Technologies13 Energy Workshop Evaluation and Development

Net Zero through Emerging Technologies14 Energy Workshop

Net Zero through Emerging Technologies15 Presentation Present recommended alternatives Discuss recommendations Gain consensus Document recommendations

Net Zero through Emerging Technologies16 Implementation

Net Zero through Emerging Technologies17 Gather Energy Data

Net Zero through Emerging Technologies18 Confirm and report results

Net Zero through Emerging Technologies19 Q&A Laurie L. Goscha –Bailey Edward – Sachin Anand –dbHMS –