Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.

Slides:



Advertisements
Similar presentations
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
SVT workshop October 27, 1998 XTF HB AM Stefano Belforte - INFN Pisa1 COMMON RULES ON OPERATION MODES RUN MODE: the board does what is needed to make SVT.
Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 1 Data Board l 2 production boards in testing on the 14th floor l Both boards are fully functional at.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
1/24/01TDC Review1 Report to the TDC Review Committee Presented by Myron Campbell.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
5/7/2004Tomi Mansikkala User guide for SVT/XTRP TX firmware v1.0 XTRP out Control FPGA Tomi: - Introduction - Control bit descriptions - Test Pattern format.
PULSAR Specifications for RECES and ISOLIST ● Zeroth order start on “exploring” how a PULSAR scheme might look for isolation trigger and RECES ● Philosophy.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Calorimeter Status Electronics Installation and Commissioning
Initial check-out of Pulsar prototypes
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
AFE II Status First board under test!!.
T1 Electronic status Conclusions Electronics Cards:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger issues for the CALICE beam test
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University of Michigan Trigger Commissioning Workshop

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, Calorimeter trigger Overview DIRAC ADMEM XTRP AUX_DIRAC CRATESUM PREFRED DCAS LOCOSCLIQUE CLIST To Lv2 crate To Lv1 crate ISO-CLIQUE ISO-CLIST ISO-PICK To L2 crate PMT signals L1 tracks

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2CAL Hardware Status DCAS: 72 installed in B0 + 8 spare. DCAS_TRANS: 36 installed in B0 + 8 spares. LOCOS: 10 production boards will arrive from ADCO next week (It is true. Myron saw them!). CLIQUE: 3 production boards assembled + 1 to be done in the next month.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2CAL Hardware Status DCAS known problems 1)VME hangs at power-up: good news: already detected and solved in D0 boards which use same VME interface (Cypress ‘960/964 chipset). bad news: full fix requires lifting of pins in fine pitch component. We have implemented a partial (easy!) fix on 7 boards. We will test it here tomorrow and see if it solves/improves the situation. 2) B0 counter mismatch Confusing at the moment. There is a known problems with some chips having bad solder joints which was detected in Michigan. Some boards in B0 showed occasional B0 counter mismatchs in the past detected by Carla’s problem. No reports of such problems for a while (checking disabled??). Last week change of the Clock Module seemed to exacerbate the problem but “almost” gone away now. Pedro has a fix for DIRAC.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2CAL Hardware Status LOCOS known problems 1) Need fix for board automatic VME reset at power-up. 2) Minimal changes between prototype (working, in B0) and production version. Expected in B0 for Sept. 20. CLIQUE known problems 1) Minimal functional changes between prototype (working in B0) and production. 2) Still debugging clustering State Machine…need LOCOS to do a thorough job Full system expected in B0 for Sept. 20. Timing tests in May using LOCOS/CLIQUE prototype gave: 1.7  s to fully process one cluster in one pass. 7  s to fully process one event with 1 high p T electron and 5 jets.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2CAL Software Status RC software esists for DCAS, not yet for LOCOS (ID Prom only) and CLIQUE (ID PROM and clustering algorithm version). Will be done when production boards arrive in B0. TRIGSIM Simulation done. Calorimeter DAQ readout tested. Clustering simulation is waiting for the hardware. Must define TRIGMON variables most useful for finding hot/dead towers, triggering efficiencies,…. Top 2 goals for Commissioning Run: 1) if full system works 2) if full system works well!

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, Calorimeter Trigger Cable Tester Heather Ray has been working on an automated test to check ADMEM  DIRAC  DCAS trigger cable continuity. Use Diagnostic FIFO/FRAM in ADMEM to send out known patterns of data (walking bit 1, alternating 0’s and 1’s) for a single or multiple cables. Will not interfere with E T weight look-up table. RC integration done for ADMEM initialization in a special calibration run mode. Working on L1A timing/synchronization so to test all of channels with a single FIFO load  need to add extra functionality to RC to simulate existing TS features.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2ISO Hardware Status ISOLIST: 1 needed 2 stuffed and working. ISOCLIQUE: 1 needed 2 stuffed 1 tested and working. ISOPICKS: 6 needed 5 stuffed 1 needs a part (delay) due last week 2 tested and working. ISO TERMINATION BOARDS: 7 needed (but system works OK without) Artworks sent out this week. If delay chip comes in next week, system should be ready and complete by Sept. 15.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2ISO Hardware Status Integration tests with L2CAL and Alpha board still under way... Main known problem  The queueing of seeds from the CLIQUE board looks fine on the scope but data from ISOLIST shows that many of those seeds are lost. Probably simple to fix once it can be recreated at ANL.

Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, L2ISO Software Status RC Control software does not exist (needed? No VME on isolation boards for what I know…) TRIGSIM simulation existed as part of the RUN2TRS package. Don’t know if imported in AC++ yet.