Established in 1955 in Dunaújváros Produce 60.000 m3 of concrete per year.

Slides:



Advertisements
Similar presentations
Portal Framed Construction
Advertisements

Introduction to composite construction of buildings
Erection of steel portal frame for warehouse Construction
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
2.2 STRUCTURAL ELEMENT BEAM
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Heavy Concrete Construction Formwork
Gravity Force Resisting Systems
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
LAYOUT OF STEEL STRUCTURES
Skyscraper Construction
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Foundation Systems.
Advantages of Lattice Towers
CONSTRUCTION.
ARCHITECTURAL DESIGN STUDIO I ARCH 201
Rectangular framed structures
Chapter 19 Floors.
Reinforced Concrete Design II
Michelle Perticarari Rebeca Peña
CONSTRUCTION AND DETAILING 1
Unit 1 Types of Construction
COLUMNS.
Topic C1 Superstructures - walls
PRE-FABRICATED STRUCTURES
Concrete Construction
Introduction to composite construction of buildings
Prefabricated Timber Frame Construction
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
The ground must push up as hard as the building pushes down
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
PRECAST CONCRETE CONSTRUCTION
Group N Chris Jones Ella Feekins Nikoline Hong
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
An Introduction to Sazeh Negar 6.
Reading Structural Drawings
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
STRUCTURE By Simonnett Rosenberg Gabriela Di Lorenzo.
C1 Conceptual Design of Buildings Lecturer: XY. 2 List of lectures 1)Multi-storey buildings 2)Floor slabs, primary and secondary beams 3)Joints of floor.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
1 HVACR116 – Trade Skills Structural Drawings. 2.
FORMS, SCAFFOLDING and STAGING
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
FRAMED STRUCTURE Members: *Daniela Rodriguez *Sofia Saturno
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Topic Today’s Objective
Chapter 23: Structural Drafting
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Economical Design of Concrete Buildings Lawrence Novak.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Framing Vocabulary Stud: upright beams in the framework of a building
Introduction to composite construction of buildings
Prefabricated Timber Frame Construction
Pearl Condominiums Philadelphia, PA
Structural drawing.
BUILDING CONSTRUCTION 1
Structural Drawing Chapter 19.
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
Name____________________________ Tutor Group _____
STRUCTURAL TIMBER FRAMING
Masonry Bearing Walls.
Presentation transcript:

Established in 1955 in Dunaújváros Produce m3 of concrete per year

FERROBETON is the member of the CRH Group and the middle-east european center of CRH Structural

Ferrobeton Zrt. ’s fields of action Design: Construction plan, shopdrawings, 3D modelling, statical calculations Production: Structural products, railway elements, housing, road elements, electric poles Transport: By road or railways Installation:

-Possible to use higher quality of materials like C60/75 or higher -Controlled and monitored production, consistant quality -Independent from weather conditions -More precise production of reinforcement and concrete shape -Can be pre-scheduled for weeks, flexible in ordering Basic about prefabricating concrete Advantages Disdvantages -Sometimes difficult to transport to site -Shape is often limited by the formwork capacity -Creating load-bearing joints are complicated and expensive -Unit cost is higher Summary and worth to use Recommended to use in complex structures where lots of same elements are repeated Recommended to use to reduce in-situ concrete needs of large projects Recommended to use to decrease construction time

Main projects of and their specifications HANKOOK TYRE Factory phases of m2 total production area Normal frame structure, one and 3 storey GREEN HOUSE Building storey office building with m2 for offices Combination of columns, beams and hollowcore GROUPAMA Football Stadium 2013 Stadium for more than visitors Combination of precast, monolitic and steel

HANKOOK TYRE Factory, Rácalmás 1 st phase: year Production area: m2 -Volume of precast structure: 7540 m3 -Max. span of concrete beam: 26 m -Part of the roof structure is steel 2 nd phase: year Production area: m2 -Volume of precast structure: 5955 m3 -Max. span of concrete beam: 32 m -No steel roof structure anymore 3 rd phase: year Production area: m2 -Volume of precast structure: m3 -Max. span of concrete beam: 38,4 m -No steel roof structure anymore

HANKOOK TYRE Factory, Rácalmás Structural description: -Foundation is solved with piling and in-situ base blocks -Column fixation is by precast rounded or doubled sockets being concreted into the monolitic base blocks -Vertical bearing and stability by retangular columns with the size of 50x50cm, longest column is 18,0m -Horizontal bearing by prestressed longitudinal I shaped main beams and crossing secondary beams with T and I sections, longest beam is 38,40m -Main groundfloor support is solved by TT floor panels above tunnels (calculated live load is 4 tons/m2) The frame structure Specification: the longest beam on roof has a span of 38,40 meters

Special multi-storey structural solution with precast elements Structural description: -3-storey building with the need of bearing 3 tons/m2 load -Column fixation is by precast rounded or doubled sockets being concreted into the monolitic base blocks -Vertical bearing by retangular columns with the size of 60x60cm, longest column here is 21,0m (in one piece) -Horizontal bearing by beam grid in two direction, with upside-down T shaped prestressed main beams and retangular secondary beams, longest beam is 12,0m -20cm floor plate is made with prestressed filigran panels with the thickness of 8cm and 12cm upper screed, max. span is 3,5m with no support Specification: the highest column produced in one piece is 25,2 meters long

More construction pictures

GREEN HOUSE Office building, Budapest Conditions to be known: -The erection time was scheduled to winter time -The construction site was narrow, the location is in the middle of the Capital -Only tower cranes were possible to use -3 weeks was given to complete a floor -The span were between 4,50 and 13,2m -Only a few bracing cores were possible -There are 3 levels for parking in the cellar as monolitic -There are 7 levels up for offices done as precast SPECIFICATIONS: -7 levels of precast flooring -Octagonal shaped columns -Delta-beam for floor support -No column in one corner Story: In Hungary almost all the office buildings are usually built with monolitic concrete structure sometimes combined with masonry. SKANSKA, a nord-european company insisted on that the structure has to be made by precast concrete elements to help FERROBETON completing this project.

GREEN HOUSE Office building, Budapest - Usual sizes are 40/50 and 60/60cm - Most columns are 2-level high - All fixation is screwed by shoes - Beams are supported by consoles - Lightning protection is built-in - Beam ends are fixed with bolts - Some columns needed as circular - These were made as octagonal - Small, one level columns are 30/30 - Weights were limited according to the capacity of tower cranes Columns

GREEN HOUSE Office building, Budapest - Side beams are retangular or L- shaped concrete beams - Inner floor beams are Delta-beams - Beams are supported by consoles - Beam ends are fixed with bolts - Weights were limited according to the capacity of tower cranes Floor beams

GREEN HOUSE Office building, Budapest - Long elements are FF 320 type - Short elements are FF 200 type - At bracing cores we used filigran floor plates - Floor elements are collaborating with 8cm of in-situ screed - Weights were limited according to the capacity of tower cranes Floor beams

GREEN HOUSE Office building, Budapest More construction pictures