New Hampshire State fish hatchery effluent discharge and EPA/NPDES permit story.

Slides:



Advertisements
Similar presentations
Agreement between the Village of Owego and Inflection Energy.
Advertisements

LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Rocky Beem 2013 Smithfield Environmental Training Conference.
1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee August 24, 2010 Metro Permit Reissuance Proposed.
Case S-5_L-Reactor1 Case Study 5: L-Reactor Thermal Effluent.
Indiana Department of Environmental Management
Proposed Effluent Guidelines For the Concentrated Aquatic Animal Production Point Source Category by Janet Goodwin.
Environmental Policy Water Pollution Air Pollution State & Local Issues Global Environment.
Clean Water Act Section 402 Issues Facing Kentucky Kentucky Professional Engineers in Mining Seminar September 6, 2013 Lloyd Cress, Kentucky Coal Association.
Anne Arundel County Department of Public Works
Clean Water Act SAFE 210. History/Amendments Recent major amendments were enacted in 1972, 1977, and – Established the National Pollutant Discharge.
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
MERCURY REQUEST FOR EFFLUENT DATA. MERCURY - BACKGROUND STATEWIDE CAMPAIGN TO ELIMINATE THE USE AND RELEASE OF HUMAN- CAUSED MERCURY IN WASHINGTON STATE.
Tertiary Treatment: Nutrient Removal, Solids Removal, and Disinfection.
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Wastewater Systems Effluent Regulations October 23, 2013.
NetDMR Training for KYG4E and KYG4W
MDFW Hatchery NPDES Program Ken Simmons Chief of Hatcheries/Trout Project Leader.
Bureau of Water Program Overview Local Government Interest.
Water Treatment Plant General Discharge Permit
Module 2 History of the Seafood Processing Waste Permitting Program.
DID YOU KNOW? – Cuyahoga River on Fire in Cleveland, Ohio – Raw wastewater spewed in the San Francisco Bay – City of Columbia Discharged Raw Wastewater.
Environmental Impacts of Aquaculture Effluents
Command and Control Regulation in Action Regulating Industrial Water Pollution in the US.
Introduction: We will start with an overview of treatment processes 1) Why do we treat water and wastewater? The main objectives of the conventional wastewater.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
National Pollutant Discharge Elimination System(NPDES) Permit.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Clean Water Act (CWA) (1977, 1981, 1987). Description and Affects This Act was put into place in order to regulate the amount of pollutants that were.
Lower Mokelumne River l Description of Watershed l Beneficial Uses l Pollution Sources l Potential Pollution Management Strategies.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Human Waste Disposal  More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water.  Natural Processes.
Human Waste Disposal More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water. More than 500 pathogenic.
OMSAP Public Meeting September 1999 Monitoring Plan Mike Mickelson and Ken Keay Massachusetts Water Resources Authority.
1 EPA Regulatory Authority and PPCPs Octavia Conerly Health and Ecological Criteria Division Office of Water Office of Water October 26, 2005 October 26,
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
What’s This HWA Design Thing All About??? Design Capacity HWA Info from one POTW CITY OF GREENSBORO North Buffalo POTW.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
A quantification of groundwater seepage during drought and its importance for water quality modeling in the St. Vrain watershed Hannah Chapin Thomas Gerber.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Public Information Meeting Wastewater Treatment January 26, 2016.
ARE 309Ted Feitshans016-1 Unit 17 Point Source Control Federal Water Pollution Control Act (Clean Water Act of 1972)
City of Cedar Rapids Water Pollution Control. 56 million gallons day (86 mgd max) 240,000 lbs/day BOD (organic waste) 168,000 lbs/day TSS (solids) 19,000.
The Clean Water Act (1977, 1981, 1987) By: Jonas Szajowitz.
NPDES Permitting for Coal Ash Ponds in North Carolina EMC Meeting January 12, 2012 Sergei Chernikov, Ph.D. 1.
MONTHLY OPERATIONS REPORT February 2016 Town of Discovery Bay, CA 2373 Days of Safe Operations 107,602 worked hours since last recordable incident.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
The Application Process In accordance with LAC 33:IX.2501.D.2 – All sugar mills with effective permits are required to submit a renewal application 180.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
CTC 450 Review Open Channel Flow (Manning’s Equation)
Waste Discharge Permit: Paradise Irrigation District
Highlights of the New NPDES Permit
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Sacramento County Stormwater Quality Program
CTC 450 Review Open Channel Flow (Manning’s Equation)
John Tinger U.S. EPA Region IX
The Clean Water Acts of 1977, 1981, & 1987
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Spencer Bohaboy Policy Development Specialist Water Quality Policy
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Indiana Department of Environmental Management Office of Water Quality
Sacramento County Stormwater Quality Program
Presentation transcript:

New Hampshire State fish hatchery effluent discharge and EPA/NPDES permit story

Federal Water Pollution Control Act (1972) known as: “Clean Water Act” (CWA) Prohibits discharge of pollutants from point sources to waters of the U.S. except as authorized by a National Pollution Discharge Elimination System (NPDES) Permit Permits were issued for all NH F&G hatcheries - only one had effluent treatment (settling ponds) and single point discharge in The old design of the rest, tends to be closely associated with natural watersheds, focused on the welfare of the fish, not addressing effluent concerns, and discharged wherever convenient. = many point discharges.

re-applications were made to EPA There was no response, and we have continued to monitor monthly and send in reports quarterly, like automatons, ever since. Thinking that the old permit remains in effect, by administrative extension until EPA issues a new one. > 20 years

Capital funding priorities have not addressed - solids removal Settling ponds have been submitted for capital budget planning for a number of years. Capital budget preliminary plans for replacement of deteriorated raceways built in 1947 incorporated studies & modern design (FishPro) for solids removal, but cost estimates beyond revenue capabilities of Dept.

Now - EPA is ready to issue new permits = effluent control is #1 priority EPA said no to using “< 20,000 lbs production = no permit required”, because receiving water is low dilution Dept. wants $2 million (maximum) to go as far as possible. “Un-funded federal mandate” – Help! New NPDES permit Applications have just been submitted.

Self - Monitoring Settleable Solids (ml/l), by administrative letter, after a year of measuring the other parameters. Limitations not to exceed values that would be experienced with maximum fish production, utilizing the most efficient cleaning methods First (1)DAILY AVERAG E DAILY MAXIMUM DAILY AVERAGE DAILY MAXIMUM SAMPLE TYPE TSS ~annual NA 3 grabs during cleaning SS monthly NA grabs during cleaning NH3-N ~annual NA 3 grabs during cleaning pH ?

Six facilities in operation Berlin* – 83,968 lbs – 3DIS – 1 solids (-) Milford – 143,833 lbs – 1DIS – 1 solids (-) New Hampton – 42,354 lbs – 28 DIS – 0 Powder Mill – 168,782 lbs – 10 DIS – min Twin Mt. – 13,348 lbs – 24DIS – 0 Warren – 23,834 lbs – 8 DIS - 0

OUTFALL Measurement parameters Total suspended solids Five-day BOD DO Total Phosphorus Ammonia nitrogen Total residual chlorine(if disinfectant compounds are used) Flow + species* Formaldehyde – whole effluent toxicity

High cost monitoring – not budgeted for $176per X 9 DIS X 2 = $3,168 X 12 = $38,016 potentially for just one facility? [unknown] Monitoring to determine something which can be determined by modeling of known feed fed, conversion, chemicals used, and does nothing to improve environment. Criteria will be set in permit, and a compliance schedule negotiated? Alternative - to shut down hatcheries, and not use them as a tool for management = not acceptable.

Fish stocked SpeciesTotals Eastern brook trout896,264 Rainbow trout306,570 Brown trout197,653 Tiger trout800 Landlocked salmon52,075 totals1,453,362