22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Status Update on Mechanical Prototype in Rome November 6,
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Engineering Design Review for TRD-Readout Chamber
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
GRPC development in Lyon
Update on Pavia MM mechanical prototype
Quality Control Chamber Production
Quality Control in Straw Production
Module Production and Testing at Duke
Gas Monitoring Chamber Production Status
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Presentation transcript:

22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas gaps Screw distance can be varied from 10 to 15cm O-ring choice :  3mm EPDM, 50 Shore A 5 mm spacers around screws define gap size

22/04/20012Wire Chamber Working Group Status on O-ring closed Prototype Bar Gluing Tool Full Frame (4 bars) is glued in one go Bars are glued with high precision (2.5mm +/-50  m) Space between bar and panel is filled up with glue => quantity of the glue depends on bar thickness and panel planarity Good transition at the bar junctions where the O-ring sits Procedure well established

22/04/20013Wire Chamber Working Group Status on O-ring closed Prototype First tests have shown enormous leaks between bars and panel. In the corners the panels are up to 500  m less thick => A lot of glue had to be used in this regions. Due to this, the glue connection broke at these places. (stress or shrinking of the glue) Additional silicon sealing has been put on from the outside. The gap precision we get from the Spacers. ->These sit as well in the border region. ->One more reason to improve the quality of the panels in this area !

22/04/20014Wire Chamber Working Group Status on O-ring closed Prototype Result of Leak tests: After improvement of the bar gluing 3 out of 4 gaps were put in a row. Overpressure of about 15mbar was applied to the gaps. The decrease of pressure was measured over time.

22/04/20015Wire Chamber Working Group Status on O-ring closed Prototype Best results were achieved in gap 26 G2 =>The O-Ring solution is leak tight in the range of 1-4mbar/h =>The screw distance does not influence much the leak rate

22/04/20016Wire Chamber Working Group Status on O-ring closed Prototype Result of Radiation test: “A sample of the EPDM O-ring has been irradiated with a dose of 10, 13, 30KGy... apparently without any damage” (Carlo Bosio) Result of Conductivity test: In 3 gaps the HV traces were covered by a Kapton layer. The one without tripped already at 100V. We realized that this O-ring is not resistive enough ! ~200K  were measured in between HV traces and ground. We exchanged the O-ring with a more isolating one (NR  3.3 mm 45 shore A) and got in contact with the company. We measured the conductivity of around 30 samples. Based on these results and the advise from the company we will order Material. Some numbers: –EPDM 50 shore A/~10M  –EPDM 27 shore A/???  –MVQ (silicon) 20 shore A/  

22/04/20017Wire Chamber Working Group Status on O-ring closed Prototype HV Behavior The HV test in air before assembly up to 4kV has been ok. The limit for the HV of the assembled chamber under gas was around 3350 V. Trips occur randomly and can not be forecasted from the dark current behavior. Gap size uniformity Uniformity tests with the Am-source have shown that the chamber tends to trip in the border regions. This is still under investigation. Possible reasons could be: –Changes in the border region because of O-ring solution –Deformations due to the O-ring (  3.3 mm) –Bad panel quality in the border region –Full copper plane pad structure with no copper at the borders

22/04/20018Wire Chamber Working Group Status on O-ring closed Prototype Old Prototypes: Copper stopped at bars or even before. O-ring Prototypes: Full copper plane. Copper passes the bars

22/04/20019Wire Chamber Working Group Status on O-ring closed Prototype Next Steps : High resistive and softer O-ring material will be ordered. A Radiation test of this new component should be envisaged. The chamber will be reassembled. Open question concerning HV behavior and gap size uniformity will be investigated.