OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.

Slides:



Advertisements
Similar presentations
First developments of DAQ\Trigger for RPC 30 October, 2002 General layout of OPERA DAQ\Trigger Naples activity Conclusions Adele Di Cicco Naples RPC Groups:
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
C.Gustavino, XPC and VETO, LNGS OPERA meeting, may VETO AND XPC: Preliminary ideas Outline: Mechanical structure Gas mixture study Aging tests Glass.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Compressor status AWAKE Technical Board meeting 19 August 2015.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
ATLAS micromegas activities (MAMMA)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
C.Gustavino, october 28-31, The RPC testing LNGS The RPC testing LNGS Outline : Trigger walls (Glass RPC, Flat Cable Strips,
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
C.Gustavino, may 19-23, The Trigger walls of the test LNGS The gas system of the trigger wall is ready only since the last week (delay.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Results with the RPC system of OPERA and perspectives
University of Wisconsin
Mini-drawers, FE-ASIC , Integrator
Hall A Compton Electron detector overview
Pierluigi Paolucci - I.N.F.N. Naples
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC Detector Control System
Limited Streamer Tube Project Summary
RPC Detector Control System
SALTRO16 activities in Lund
Presentation transcript:

OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including Mechanics, Strips and FE electronics) Luca Stanco15’ 3.Status System Test at LNGS Carlo Gustavino20’ 4.RPC production at GT and Automatic Pushing Test Alberto Garfagnini20’ 5.First developments of DAQ/Trigger for RPC Adele Di Cicco15’ 6.Results of RPC under tests at LNGS Alessandro Paoloni20’ 7.Status of RPC test at CERN Stefano Dusini10’ 8.Status of Drift Tubes Raoul Zimmermann30’

OPERA Coll.Meet. October 2002Luca Stanco - Padova2 Mechanics Strips Situation on Production System Test Facility Automatic tests on RPC Electronics FE – DAQ RPC under tests at LNGS and Cern

OPERA Coll.Meet. October 2002Luca Stanco - Padova3 MECHANICS frame and “culla” for installation here at LNF ! to be checked on the magnet prototype next 5+5 transportation boxes ordered.

OPERA Coll.Meet. October 2002Luca Stanco - Padova4

OPERA Coll.Meet. October 2002Luca Stanco - Padova5

OPERA Coll.Meet. October 2002Luca Stanco - Padova6

OPERA Coll.Meet. October 2002Luca Stanco - Padova7 Final design reached (2.6 cm pitch in x-view, 3.5 cm pitch in y-view) Full double layer (x any view) (final) prototype ordered at Pol.Hi.Tech To be ready in November To be tested at LNF in December Started procedure for tendering to be ended in January-February 2003 STRIPS

OPERA Coll.Meet. October 2002Luca Stanco - Padova8 RPC PRODUCTION Production plan for OPERA: October 1rst Delayed 1 month in cooperation with ARGO  November 4th Bakelite planes ready at PanPla company. To be sent to General Technica (this week) 500 chambers are necessary for one Spectrometer Each Spectrometer has to be installed, together with RPC’s in 6 months

OPERA Coll.Meet. October 2002Luca Stanco - Padova9 ELECTRONICS Front-End card (2nd prototype): - 64 channels (final, 16 ch for prototype) - differential receivers exaustively studied (good response until 5 mV) - Z in = 100  - input polarization for at least two samples - threshold tunable 0 – 300 mV for groups of 16 channels - mask single input - digital test-in - FastOR over 16 channels 1  s long, TTL output at 50  - generation of interrupt on the FastOR - external trigger/gate for all the channel. TTL output at high Z - double buffer for the events - VME-like read-out … under test with RPC in Padova

OPERA Coll.Meet. October 2002Luca Stanco - Padova10 Backplane: - for Eurocrate 6U - 19 FE cards of 64 channels each - in the 2 free positions a power supply “switching”-like 250 W, +3.3 V, +5 V, ±12 V, standard PCI …offers from company on the way …possibility to build the prototype in Padova under investigation FE 64 channels card: - final design under going Strip-connectors-FE-cards: - Impedence adapters - under definition at LNF Cabling: - ready to buy High Voltage system: - under development at LNF

OPERA Coll.Meet. October 2002Luca Stanco - Padova11 System test at Gran Sasso very well in time and succesfully set-up RPC pre-production will allow complete test of the system for end of August Many tests on the full scale RPC prototypes -> good results Mechanics on the way on. First prototype for installation end of July Electronics well suited. Need FE – DAQ integration. More people are coming Production for OPERA at General Technica tight but acceptable. of June 2002 … end of September Naple not yet true … at October 2002