Clodiagh North Tipperary Water Management Unit Action Plan Name Clodiagh North Tipp Water Management Unit Area258 km 2 River Basin DistrictSouth Eastern.

Slides:



Advertisements
Similar presentations
Municipal & Industrial Regulations. Revised Risk Assessments Status and Risk Measures.
Advertisements

Dinin Water Management Unit Action Plan NameDinin Water Management Unit Area300 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny Protected.
Suir Estuary Water Management Unit Action Plan Name Suir Estuary Water Management Unit Area699 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny,
1 Europe’s water – an indicator-based assessment Niels Thyssen.
Barrow Owenass Triogue Water Management Unit Action Plan Name Barrow Owenass Triogue Water Management Unit Area328 km 2 River Basin DistrictSouth Eastern.
How close are we in the Water Framework Directive’s Implementation ? Paul C.M. Frintrop Institute for Inland Water Management and Waste-Water Treatment.
1 What happens next? November Contents WFD timetable & consultations The River Basin Management Planning Process Applying classification Making.
Aquaculture in Scotland the potential effects of the Water framework Directive the potential effects of the Water framework Directive Peter Holmes Marine.
Are there any Supplementary Measures? Tom Stafford 5 February 2013.
WATER MATTERS TO THE EXTRACTIVE INDUSTRY Presentation to the South Eastern RBD Advisory Council 24 th October 2007 Liam Smyth FIEI Planning & Environment.
Ballyteigue Bannow Water Management Unit Action Plan Name0000. Ballyteigue Bannow Water Management Unit Area644 km 2 River Basin DistrictSouth Eastern.
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Presentation to South Eastern River Basin District Advisory Council Lisa Sheils Project Coordinator 28th April 2006.
Kings Water Management Unit Action Plan NameKings Water Management Unit Area381 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny/Tipperary.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
GIS development. Danube Commission+ISRBC meeting Sava GIS Sava GIS establishment –Performed in accordance with the Sava GIS Strategy EU WFD INSPIRE Directive.
Significant Water Management Issues (SWMI) Report – Draft Template South Eastern PSC Dec 2006.
Italian Committee of United Cities (CICU) PHARE - twinning Project SK02/IB/EN01 Slovak Hydrometeorological Institute PRP as a tool for: Reduce overall.
1 What the WFD will mean for local authorities November 2007.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
Significant Water Management Issues (SWMI) Report South Eastern RBDAC Dec 2006.
SWMI Submissions 21 st May SWMI Submissions The Water Matters booklet was published on the 22 nd June 2007 and there was a consultation period of.
The implementation of the EC Water Framework Directive in Norway Eva Skarbøvik and Stig A. Borgvang Norwegian Institute for Water Research (NIVA) with.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Public Participation 16 March – Farmers Journal Article (Andy Doyle) 27 March – Project Stand at Inland Waterways School Poster Competition, Kilkenny 11.
Drish Water Management Unit Action Plan Name00Drish Water Management Unit Area205 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
IPPC Discharges Monitoring Workshop Water Framework Directive Overview (and its implications for Industry) Peter Webster Regional Chemist (EPA Cork)
Monitoring Programs... A challenge for all of Europe Rivers draining >200km2 in Ireland compared to the Danube basin.
Significant Water Management Issues (SWMI) – Update South Eastern River Basin District March 2007.
SERBD Advisory Council Meeting 20 th February 2008 Synopsis of Public Meetings.
Derry Water Management Unit Action Plan NameDerry Water Management Unit Area246 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWicklow Protected.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Multeen Water Management Unit Action Plan NameMulteen Water Management Unit Area182 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
Slaney Upper Water Management Unit Action Plan NameSlaney Upper Water Management Unit Area260 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWicklow,
Burren Water Management Unit Action Plan NameBurren Water Management Unit Area180 km 2 River Basin DistrictSouth Eastern RBD Main CountiesCarlow Protected.
Water Framework Directive An Introduction David Whiles Anglian River Basin Manager.
Slaney Estuary Water Management Unit Action Plan NameSlaney Estuary Water Management Unit Area351 km 2 River Basin District South Eastern RBD Main Counties.
Owenavorragh Water Management Unit Action Plan Name Owenavorragh Water Management Unit Area398 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford.
Bárbara Willaarts 1,2, Mario Ballesteros 2 and Nuria Hernández-Mora 3 1 Observatorio del Agua-Fundación Botín 2 CEIGRAM-Universidad Politécnica de Madrid.
MODULE 1 Water Framework Directive, Relation of WFD with Daughter Directives, River Basin Management Planning, Water Bodies, Typology, Classification River.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Water Framework Directive Implementation and Risk Analysis John Sadlier Water Quality Section.
© WRc plc 2010 Agenda item 3b: Summary of WISE electronic delivery: presentation of an example.
Suir Main Water Management Unit Action Plan NameSuir Main Water Management Unit Area824 km 2 River Basin District South Eastern RBD Main CountiesTipperary,
Barrow Main Water Management Unit Action Plan Name Barrow Main Water Management Unit Area1110 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKildare,
SERBD River Basin Management Group Meeting 12 th December 2007 Synopsis of Public Meetings.
Slaney Lower Water Management Unit Action Plan Name Slaney Lower Water Management Unit Area417 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford,
Colligan Mahon Water Management Unit Action Plan NameColligan Mahon Water Management Unit Area641 km 2 River Basin District South Eastern RBD Main CountiesWaterford.
Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.
Nore Estuary Water Management Unit Action Plan Name Nore Estuary Water Management Unit Area129 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny.
Nore Upper Water Management Unit Action Plan Name Nore Upper Water Management Unit Area300 km 2 River Basin DistrictSouth Eastern RBD Main CountiesLaois.
Stradbally Water Management Unit Action Plan NameStradbally Water Management Unit Area123 km 2 River Basin DistrictSouth Eastern RBD Main CountiesLaois.
River Basin Management Plan Steps, Status and Objectives.
CIS Working Group 2A ECOSTAT Overall Approach to the Ecological Classification 01 July 2003 D/UK WGL CIS 2A.
Anthropogenic pressures and classification on 2 nd planning period.
Thematic assessments based on results from RBMPs Coastal and transitional ecological status & related presures Inland surface waters Hydromorphological.
Environmental Services Training Group
Identification on Significant Pressures - Surface Water Bodies
Monitoring, assessing and classifying the environment
Principles and Key Issues
Environmental Services Training Group
Proposal for reporting on Programmes of Measures in 2016
Type of presentation/visualisation
Experiences of designing WFD-monitoring networks in the Netherlands
Project 2.7 Guidance on Monitoring
WFD & Agriculture – Article 5
FROM THE BASIN… TO THE WATERBODIES
Presentation transcript:

Clodiagh North Tipperary Water Management Unit Action Plan Name Clodiagh North Tipp Water Management Unit Area258 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected AreasLower River Suir SAC

Clodiagh NT Water Management Unit Action Plan River status STATUS/IMPACTS Overall status22 RWB - 7 good, 7 moderate, 7 poor, 1 bad. 0 lakes. Status elementsQ score dictates overall status in all monitored WBs. Phys Chemical fails in one WB. Chemical Status not monitored. Status for 12 sites was extrapolated (5 good, 5 moderate, 2 poor). Possible Impacts - EPA Water Quality 2004 BORRISOLEIGH STREAM - (SE_16_3178, Status Bad and SE_16_3944, Status Poor) No change with serious pollution, bad quality, downstream of Borrisoleigh and good ecological quality near Ballyduff. (Q score 2) CLODIAGH (TIPPERARY) - (SE_16_537, Status Moderate) No change. Mostly satisfactory but again only moderate ecological quality recorded at Drumminnagleagh Bridge. (Based on Q score 3-4) (Upper reaches in SE_16_505 which was High (Q 4-5) in 2008 but extrapolated to Good in 2009) FARNEYBRIDGE - (SE_16_4165 and SE_16_4177, Status Poor, SE_16_997 and SE_16_537, Status both Moderate) Again only one location satisfactory. (Q score 3) FISHMOYNE - (SE_16_2390 and SE_16_506, Status both Poor) Unsatisfactory with poor quality at both locations. Arterial drainage in lower reach has seriously compromised ecological potential. (Based on Q score 3) OWENBEG (TIPPERARY) - (SE_16_2449 and SE_16_2411, Status both Good) Satisfactory with both locations again showing good ecological quality. (Based on Q score 4) PRESSURES/RISKS Nutrient sourcesMost TP is diffuse (98%) mainly from agriculture (86%) and unsewered properties (9%). Point pressures2 WWTP: Upperchurch, Borrisoleigh, (3 new WWTP under the small villages scheme) 2 Section 4s: Pub/Restaurant, Developer. 0 IPPCs. 0 WTPs. Wastewater Treatment Plants (WWTP) and Industrial Discharges Borrisoleigh WWTP Section 4 - Public house- at risk. Quarries, Mines & Landfills There are 8 Quarries. There are no landfills or mines within the WMU. AgricultureThere are 19 waterbodies at risk from Agriculture within the WMU: SE_16_5, SE_16_174, SE_16_537, SE_16_691, SE_16_2448, SE_16_2390, SE_16_4177, SE_16_3204, SE_16_2414, SE_16_2411, SE_16_2545, SE_16_505, SE_16_3178, SE_16_3720, SE_16_506, SE_16_3944, SE_16_4166, SE_16_997, SE_16_4165. On-site systemsThere are 2205 septic tanks in this WMU, none of them are posing a risk to water quality due to their density, location and unsuitable hydrogeological conditions. ForestryThere are no waterbodies within the WMU at risk from Forestry. Dangerous substances There are no waterbodies at risk from dangerous substances within the WMU. MorphologyThere is is one waterbody SE_16_537 at risk- Clodiagh Drainage District (pre 1945 drainage) AbstractionsThere are no waterbodies at risk from abstraction within the WMU. OtherThere are no HMWB or AWB within the WMU. SELECTED ACTION PROGRAMME NB All relevant basic measures, general supplementary measures and SEA mitigation measures apply Point SourcesWWTP – see Action Table below. Section 4s – Examine the terms of discharge authorisations to determine whether they require review for the purpose of compliance with water body objectives including protected area objectives and environmental quality standards. Diffuse SourcesAGRICULTURE – Good Agricultural Practice Regulations and Enforcement. OtherMORPHOLOGY - SE_16_537 will require Channelisation Investigation to determine impact. Sewerage Scheme for Borrisoleigh was identified in WSIP High Good Moderate Poor Bad Yet to be determined

River Data Clodiagh NT Water Management Unit Action Plan OBJECTIVES Restore/Protect water bodies Alternative Objectives Extended Deadlines – 10 water bodies with 2021 deadline New Modifications or Development – none requiring alternative objectives at present. HMWB/AWB - none FUTURE DEVELOPMENT Future Pressures and Developments Throughout the river basin management cycle future pressures and developments will need to be managed to ensure compliance with the objectives of the Water Framework Directive and the Programme of Measures will need to be developed to ensure issues associated with these new pressures are addressed. This table outlines water body information including status and a breakdown of its elements, protected areas, objectives and timescales.