Risk Analysis. Topics - Risk and Uncertainty - General Risk Categories - Probability - Probability Distributions - Payoff Matrix - Expected Value - Variance.

Slides:



Advertisements
Similar presentations
Copyright © 2008 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Managerial Economics, 9e Managerial Economics Thomas Maurice.
Advertisements

Utility Theory.
Introduction to Decision Analysis
Managerial Decision Modeling with Spreadsheets
1 Demand for Health Insurance. 2 Which Investment will you pick Expected Value $2600 Choice 2 $5000 -$ Choice 1 $5000 $
DSC 3120 Generalized Modeling Techniques with Applications
Chapter 15: Decisions Under Risk and Uncertainty McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Managerial Economics in a Global Economy Chapter 13 Risk Analysis PowerPoint Slides Prepared by Robert F. Brooker, Ph.D. Copyright ©2004 by South-Western,
Lecture 4 Environmental Cost - Benefit - Analysis under risk and uncertainty.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 15 Decisions under Risk and Uncertainty.

Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter.
Uncertainty and Consumer Behavior
Notes – Theory of Choice
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Chapter 5 Risk and Rates of Return © 2005 Thomson/South-Western.
Defining and Measuring Risk
Chapter 6 An Introduction to Portfolio Management.
Basic Tools of Finance Finance is the field that studies how people make decisions regarding the allocation of resources over time and the handling of.
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Prepared by Robert F. Brooker, Ph.D. Copyright ©2004 by South-Western, a division of Thomson Learning. All rights reserved.Slide 1 Managerial Economics.
Copyright © 2005 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Managerial Economics Thomas Maurice eighth edition Chapter 15.
BF 320: Investment & Portfolio Management M.Mukwena.
Essentials of Investment Analysis and Portfolio Management by Frank K. Reilly & Keith C. Brown.
An overview of the investment process. Why investors invest? By saving instead of spending, Individuals trade-off Present consumption For a larger future.
Version 1.2 Copyright © 2000 by Harcourt, Inc. All rights reserved. Requests for permission to make copies of any part of the work should be mailed to:
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter 7.
Some Background Assumptions Markowitz Portfolio Theory
Investment Analysis and Portfolio Management Chapter 7.
Lecture: Decision making under uncertainty Date:
Risks and Rates of Return
CHAPTER TWO UNDERSTANDING RISK AND RETURN © 2001 South-Western College Publishing.
Chapter 4 Risk and Rates of Return © 2005 Thomson/South-Western.
TOPIC THREE Chapter 4: Understanding Risk and Return By Diana Beal and Michelle Goyen.
UNDERSTANDING RISK AND RETURN CHAPTER TWO Practical Investment Management Robert A. Strong.
Chapter 3 Arbitrage and Financial Decision Making
Decision Making Under Uncertainty and Risk 1 By Isuru Manawadu B.Sc in Accounting Sp. (USJP), ACA, AFM
Chapter 13 Risk Analysis Dr Loizos Christou. Risk and Uncertainty Risk –Situation where there is more than one possible outcome to a decision and the.
Chapter 5 Uncertainty and Consumer Behavior. ©2005 Pearson Education, Inc.Chapter 52 Q: Value of Stock Investment in offshore drilling exploration: Two.
Stephen G. CECCHETTI Kermit L. SCHOENHOLTZ Understanding Risk Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Investment Analysis and Portfolio Management First Canadian Edition By Reilly, Brown, Hedges, Chang 6.
Chapter 5 Choice Under Uncertainty. Chapter 5Slide 2 Topics to be Discussed Describing Risk Preferences Toward Risk Reducing Risk The Demand for Risky.
Risk and Return: Portfolio Theory and Assets Pricing Models
Decision theory under uncertainty
Uncertainty and Consumer Behavior Chapter 5. Uncertainty and Consumer Behavior 1.In order to compare the riskiness of alternative choices, we need to.
© 2005 Pearson Education Canada Inc Chapter 17 Choice Making Under Uncertainty.
Chapter 11 Risk and Rates of Return. Defining and Measuring Risk Risk is the chance that an unexpected outcome will occur A probability distribution is.
1 THE FUTURE: RISK AND RETURN. 2 RISK AND RETURN If the future is known with certainty, all investors will hold assets offering the highest rate of return.
Fundamentals of Decision Theory Chapter 16 Mausam (Based on slides of someone from NPS, Maria Fasli)
How to Build an Investment Portfolio The Determinants of Portfolio Choice The determinants of portfolio choice, sometimes referred to as determinants of.
5-1 Economics: Theory Through Applications. 5-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License.
Managerial Economics Uncertainty Aalto University School of Science Department of Industrial Engineering and Management January 12 – 28, 2016 Dr. Arto.
Chapter 11 – Introduction to Risk Analysis u Why do individuals, companies, and stockholders take risks?
PowerPoint Slides by Robert F. BrookerCopyright (c) 2001 by Harcourt, Inc. All rights reserved. Managerial Economics in a Global Economy Chapter 13 Risk.
Money and Banking Lecture 11. Review of the Previous Lecture Application of Present Value Concept Internal Rate of Return Bond Pricing Real Vs Nominal.
DECISION MODELS. Decision models The types of decision models: – Decision making under certainty The future state of nature is assumed known. – Decision.
Risk Analysis “Risk” generally refers to outcomes that reduce return on an investment.
Part Three: Information for decision-making Chapter Twelve: Decision-making under conditions of risk and uncertainty Use with Management and Cost Accounting.
Chapter 5 Understanding Risk
Chapter 15: Decisions Under Risk and Uncertainty
Decisions Under Risk and Uncertainty
CHAPTER 1 FOUNDATIONS OF FINANCE I: EXPECTED UTILITY THEORY
Risk Analysis.
MANAGEMENT AND COST ACCOUNTING
Chapter Five Understanding Risk.
Ekonomi Manajerial dalam Perekonomian Global
Managerial Economics in a Global Economy
Ekonomi Manajerial dalam Perekonomian Global
Chapter 15 Decisions under Risk and Uncertainty
Chapter 15: Decisions Under Risk and Uncertainty
Presentation transcript:

Risk Analysis

Topics - Risk and Uncertainty - General Risk Categories - Probability - Probability Distributions - Payoff Matrix - Expected Value - Variance and Standard Deviation (Measurement of Absolute Risk) - Coefficient of Variation (Measurement of Relative Risk)

Topics (Con’t) - Risk Attitudes Risk Aversion Risk Neutrality Risk Loving (Taking) - Utility Theory and Risk Analysis - Risk Premium - Decision-Making Under Risk - Certainty Equivalent - Game Theory - Maximin Decision Rule - Minimax Regret Decision Rule

Readings Hirschey, Chapter 17 Lecture notes

Motivation Risk – a four-letter word To make effective investment decisions, one must understand risk. Decision makers sometimes know with certainty the outcomes associated with each possible course of action.

Motivation (Con’t.) Example: A firm with $100,000 in cash Decision to make: (1) Invest in a 30-day Treasury bill yielding 6% interest (2) Prepay a 10% bank loan Which course of action to take? Choose (1) => $493 interest income after 30 days Choose (2) => $822 interest expense savings after 30 days Choose (2) provides $329 additional 1-month return

Definition of Risk and Uncertainty - Risk/Uncertainty: Both concepts deal with the probability of loss or the chance of adverse outcomes - Risk: All possible outcomes of managerial decisions and their probabilities are not completely known - Uncertainty: The possible outcomes and their probabilities are known

General Risk Categories Business Risk – the chance of loss associated with a given managerial decision; typically a by-product of the unpredictable variation in product demand and cost conditions Market Risk – the chance that a portfolio of investments can lose money because of overall swings in financial markets Inflation Risk – the danger that a general increase in the price level will undermine the real economic value of corporate agreements Interest-rate Risk – another type of market risk that can affect the value of corporate investments and obligations Credit Risk – the chance that another party will fail to abide by its contractual obligations

General Risk Categories (Con’t.) Liquidity Risk – the difficulty of selling corporate assets or investments that have only a few willing buyers or are otherwise not easily transferable at favorable prices under typical market conditions Derivative Risk – the chance that volatile financial derivatives such as commodity futures and index options could create losses by increasing rather than decreasing price volatility Currency Risk – the chance of loss due to changes in the domestic currency value of foreign profits

Probability - Probability: likelihood of particular outcome occurring, denoted by p. The number p is always between zero and one. - Frequency: estimate of probability, p=n/N, where n is number of times a particular outcome occurred during N trials. - Subjective probability: If we do not have frequency, we often resort to informed guesses. Subjective probabilities must follow the same rules of the probability calculus, if we are dealing with rational decision-makers.

Probability Distribution Discrete probability distribution: deals with “events” whose “states of nature” are discrete. The “event” is the state of the economy. The “states of nature” are recession, normal, and boom. Continuous probability distribution: deals with “events” whose “states of nature” are continuous values. The “event” is profits, and the “states of nature” are various profit levels. Event State of Economy P (probabilty) Recession0.2 Normal0.6 Boom0.2

Payoff Matrix A table that shows outcomes associated with each possible state of nature. State of Economy Project AProject BProbability of State of Economy Recession$4,000$00.2 Normal$5, Boom$6,000$12, Project A more desirable in a recession. Project B more desirable in a boom. In a normal economy, the projects offer the same profit potential. Decision to Make: A firm must choose only one of the two investment projects (choose Project A or Project B). Each calls for an outlay of $10,000.

Expected Value The payoffs of all events: x 1, x 2, …, x N The probability of each event: p 1, p 2, …, p N Expected value of x: EV(x) is a weighted-average payoff, where the weights are defined by the probability distribution. Use the payoff matrix in the previous slide, together with the probability of each state of the economy.

Expected profit of Project A and B under different economic states of nature

Variance and Standard Deviation Variance and Standard Deviation: measuring risk The payoffs of all events: x 1, x 2, …, x N The probability of each event: p 1, p 2, …, p N Expected value of x: Variance: Standard deviation: square root of variance

For project A, what are the variance and standard deviation? EV(A) = $5,000 Variance (σ 2 ) = ($4,000-5,000) 2 (.2) + ($5,000-$5,000) 2 (.6) + ($6,000-$5,000) 2 (.2) (σ 2 ) = ($1,000) 2 (.2) + ($0) 2 (.6) + ($1,000) 2 (.2) (σ 2 ) = $400,000 (units are in terms of squared dollars) σ A = $ For project B, what are the variance and standard deviation? EV(B) = $5,400 Variance (σ 2 ) = ($0-5,400) 2 (.2) + ($5,000-$5,400) 2 (.6) + ($12,000-$5,400) 2 (.2) (σ 2 ) = 5,832, , ,712,000 (units are in terms of squared dollars) (σ 2 ) = 14,640,000 (units are in terms of squared dollars) σ B = $3, Project B has a larger standard deviation; therefore it is the riskier project

Risk Measurement Absolute Risk: - Overall dispersion of possible payoffs - Measurement: variance, standard deviation - The smaller variance or standard deviation, the lower the absolute risk. Relative Risk - Variation in possible returns compared with the expected payoff amount - Measurement: coefficient of Variation (CV), - The lower the CV, the lower the relative risk.

Project A EV(A) = $5,000 σ A = $ Project B EV(B) = $5,400 σ B = $3, Coefficient of variation CV A == CV B == Coefficient of variation measures the relative risk; the variation in possible returns compared with the expected payoff amount.

Risk Attitudes Risk Aversion characterizes decision makers who seek to avoid or minimize risk. Risk Neutrality characterizes decision makers who focus on expected returns and disregard the dispersion of returns. Risk Seeking (Taking) characterizes decision makers who prefer risk.

Scenario: A decision maker has two choices, a sure thing and a risky option, and both yield the same expected value. Risk-averse behavior: Decision maker takes the sure thing Risk-neutral behavior: Decision maker is indifferent between the two choices Risk-loving (or seeking) behavior: Decision maker takes the risky option Risk Attitudes

Utility Theory and Risk Analysis Typically, consumers and investors display risk-averse behavior, especially when substantial sums of money are involved. Risk aversion is the general assumption behind decision models in managerial economics. Examples to the contrary: State-run lotteries Casinos (gaming) Today, U.S. consumers spend more on legal games of chance than on movie theaters, books, amusement attractions, and recorded music combined! Source: Wall Street Journal, Ann Davis, September 23, 2004.

Risk averter: diminishing MU Risk neutral: constant MU Risk lover: increasing MU (MU) Risk Attitudes

Examples of utility functions Let w = income (or profit) or more generally wealth, w > 0 Which utility function is consistent with risk-seeking behavior? Which utility function is consistent with risk neutrality? Which utility function is consistent with risk aversion?

Under risk aversion behavior, the decision rule is to maximize expected utility. EV[U(risky option)] = U(w 1 )p 1 + U(w 2 )p 2 + U(w n )p n Also, it is important to find the level of income, profits, or wealth that is consistent with the utility level of the expected value of utility associated with the risky option. Call this level of wealth w *. The difference between the expected value of the risky option and w * is the risk premium. Risk premium = EV(risky option) – w *

Example: Joshua lives in San Francisco, CA, where the probability of an earthquake is 10%. Suppose that Joshua’s utility function is given by, where w represents total wealth. If Joshua chooses not to buy insurance next year, his wealth is $500,000 if no earthquake occurs, and $300,000 if an earthquake occurs. The reduction in wealth is attributable to the loss of his house due to the earthquake. The risky option is not buying insurance. (a)Is Joshua risk averse, risk loving, or risk neutral? (b)Find the EV of not buying insurance (the risky option). (c)Find EV[U(risky option)]. (d)Find the wealth that results in the utility level associated with the expected value of utility of the risky option. (e)Find the risk premium.

(a)Is Joshua risk averse, risk loving, or risk neutral? MU diminishes with increases in w. Joshua is risk averse (b)Find the EV of not buying insurance. EV(risky option) = ($500,000)(.9) + ($300,000)(.1) = $480,000 (c)Find EV[U(risky option)]. EV[U(risky option)] = EV[U(risky option)] = $ $54.77 = $ (d)What level of wealth is consistent with the utility level of the EV[U(risky option)]? (e)Risk premium. EV(risky option) – w * = $480,000 - $477,716 Risk premium = $2,284.

Graphical Analysis Utility Wealth U(500,000) = ,000477,716480,000500, U(500,000) + 0.1U(300,000) = U(300,000) = U= risk premium

Decision-Making Under Risk Possible Criteria to consider: - Maximize expected value - Minimize variance or standard deviation - Minimize coefficient of variation - Incorporate risk attitudes: certainty equivalent - Maximin criterion

Maximizing Expected Value Event (State of Economy)PProfit Project AProject B Recession0.2$4,000$0 Normal0.6$5,000 Boom0.2$6,000$12,000 EV(A)=$5,000 EV(B)=$5,400 Thinking: Which project will you choose based on this criterion? What is ignored using this criterion?

Minimizing Variance/Standard Deviation Event (State of Economy)PProfit Project AProject B Recession0.2$4,000$0 Normal0.6$5,000 Boom0.2$6,000$12,000 = $ = $3, Thinking: Which project will you choose based on this criterion? What is ignored using this criterion?

Coefficient of Variation: Standard Deviation Divided by the Expected Value AB Expected value$5,000$5,400 Standard deviation$632.46$3, Coefficient of Variation Think: Which project will you choose based on this criterion? What is ignored?

Incorporating Risk Attitudes: Certainty Equivalent Suppose that you face the following choices: (1)Invest $100,000 From a successful project you receive $1,000,000. If the project fails, you receive $0. The probability of success is 0.5. EV(investment) = ($1,000,000)(0.5) + ($0)(.5) = $500,000. (2)You do not make the investment and keep $100,000. If you find yourself indifferent between the two alternatives, $100,000 is your certainty equivalent for the risky expected return of $500,000. A certain or riskless amount of $100,000 provides exactly the same utility as a 50/50 chance to earn $1,000,000 (or $0).

In general, any risky investment with a certainty equivalent less than the expected dollar value indicates risk aversion. In our case, $100,000 risk aversion. Certainly Equivalent Adjustment Factor = = Equivalent Certain Sum Expected Value of the Risky Venture In our case, = $100,000 =.2. $500,000 The “price” of one dollar in this risky venture is equal to 20¢ in certain dollar terms.

= Equivalent Certain Sum Expected Value of the Risky Venture IfThen Implies Equivalent certain sum < Expected Value of the < 1 Risk aversion Risky Venture Equivalent certain sum = Expected Value of the = 1 Risk indifference Risky Venture (or neutrality) Equivalent certain sum > Expected Value of the > 1 Risk preference Risky Venture (or taking)

Game Theory - Game Theory dates back to the 1940s by John von Neuman (Mathematician) and Oskar Morgenstern (Economist) - Game Theory is a useful decision framework employed to make choices in hostile environments and under extreme uncertainty. - Use of maximin decision rule - Use of minimax regret decision rule (opportunity loss).

Maximin Decision Rule The decision maker should select the alternative that provides the best of the worst possible outcomes. Maximize the minimum possible outcome. The maximin criterion focuses only on the most pessimistic outcome for each decision alternative. The maximin criterion implicitly assumes a very strong aversion to risk and is quite appropriate for decisions involving the possibility of catastrophic outcomes.

Minimax Regret Decision Rule This decision rule focuses on the opportunity loss associated with a decision rather than on its worst possible outcome. The decision maker should minimize the maximum possible regret (opportunity loss) associated with a wrong decision after the fact. Minimize the difference between possible outcomes and the best outcome for each state of nature. Opportunity loss => the difference between a given payoff and the highest possible payoff for the resulting state of nature. So, find the maximum payoff for a given state of nature and then subtract from this amount the payoffs that would result from various decision alternatives.

Maximin and Minimax Regret Decision Rules Event (State of Economy) Profit Project AProject B Recession$4,000$0 Normal$5,000 Boom$6,000$12,000 Thinking: Which project will you choose? - Based on Maximin Decision Rule? - Based on Minimax Regret Decision Rule? What is ignored in the respective decisions?

Maximin Decision Rule Example Minimum possible outcome for project A is $4,000. Minimum possible outcome for project B is $0. Therefore by the maximin decision rule, choose project A.

Minimax Regret Decision Rule Calculate the opportunity loss or regret matrix State of Nature Project AProject BMaximum Payoff Recession$4,000-$4,000=$0$4,000-$0=$4,000 $4,000 Normal$5,000-$5,000=$0 $5,000 Boom$12,000-$6,000=$6,000$12,000-$12,000=$0$12,000 Maximum possible regret$6,000 Project A $4,000 Project B Therefore, by the minimax regret decision rule, choose project B.

What’s Next? Preparation for Exam I Exam I Covers: -Expected Value Maximization; Value of the Firm; Profit Margin; ROE -Univariate Maximization/Minimization - Demand analysis - Risk analysis