Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments Transmission Workgroup 6th October 2011.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
European Developments: Capacity Transmission Workgroup 6th October 2011.
CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
CBA Results Files Analysing the results. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
The EU internal energy market
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
How the PCIs are developed Céline Heidrecheid System Development Business Area Manager TYNDP perspective on project progress Copenhagen – 24 June 2016.
Gas Regional Initiative South South-East
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
EU Implementation Programme
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
ACER’s view on the future role of the Gas Regional Initiative
Update on European Network Codes
Transparency in the Energy Community Contracting Parties
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative South South-East
Guidelines for the implementation of Regulation (EC) No 91/2003 of the European Parliament and of the Council on Rail transport statistics version 6.0.
ACER’s view on the future role of the Gas Regional Initiative
Update on WS3 Activities
Gas Regional Initiative South South-East
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September 2012

System Operation: scope and relations 2 INT NC IAs UNITS Capacity Calculation Data Exchange Gas Qualitiy Odorisation TRA TRA Guidelines TRA Platform

System Operation: scope and relations 3 INT NC IAs UNITS Capacity Calculation Data Exchange Gas Qualitiy Odorisation BAL TRA CAM TRA Guidelines CMP REMIT TRA Platform TYNDP Tariffs

System Operation: scope and relations 4 INT NC IAs UNITS Capacity Calculation Data Exchange Gas Qualitiy Odorisation BAL TRA CAM TRA Guidelines CMP REMIT TRA Platform TYNDP

The Concept of project 5 >Why are we updating the TP now?  Commission decision of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks >What are the challenges?  We have to meet current and (as far as possible) future transparency needs >What are the risks?  New requirements not yet well-defined (codes / guidelines / REMIT) >What are the opportunities?  IT developments on tools and data handling  Wider ENTSOG needs can be covered >Why are we organizing the WS?  To inform  To initiate feedback process Transparency Platform

Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels EML: WWW: Panagiotis Panousos Business Area Manager System Operations Do you have further questions?