STS Radiation Environment 11 th CBM Collaboration Meeting GSI, February 2008 Radoslaw Karabowicz GSI.

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

1 Geometry layout studies of the RICH detector in the CBM experiment Elena Belolaptikova Dr. Claudia Hoehne Moscow State Institute of Radioengineering,
12 th CBM Collaboration Meeting October 13-18, 2008, JINR, Dubna A. Zinchenko 1 (L.Naumann 2, D.Peshekhonov 1, V.Peshekhonov 1 ) 1 VBLHEP, JINR, Dubna.
Radiation Doses in CBM - A first estimate and an assessment of consequences Walter F.J. Müller, GSI, Darmstadt 11 th CBM Collaboration Meeting 26 February.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Feasibility Studies of Low-mass Mesons Identification for the CBM Project Radosław Karabowicz Hot Matter Physics Department, Institute of Physics, Jagiellonian.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
D 0  K -,  + reconstruction with CBM STS detector I.Vassiliev (GSI) CBM collaboration meeting 06-Oct-04 Simulation tools (cbmroot) & geometry Signal.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Vector meson study for the CBM experiment at FAIR/GSI Anna Kiseleva GSI Germany, PNPI Russia   Motivation   The muon detection system of CBM   Vector.
Characterization of double sided silicon micro-strip sensors with a pulsed infra- red laser system for the CBM experiment Pradeep Ghosh 1,2 & Jürgen Eschke.
1 J.M. Heuser et al. CBM Silicon Tracker Requirements for the Silicon Tracking System of CBM Johann M. Heuser, M. Deveaux (GSI) C. Müntz, J. Stroth (University.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
IFluka : a C++ interface between Fairroot and Fluka Motivations Design The CBM case: –Geometry implementation –Settings for radiation studies –Global diagnosis.
CBM Collaboration Meeting 1 Simulation Status V. Friese.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Radiation levels in CBM Radiation effects iFluka (Fluka C++ interface to CbmRoot) Fluka Geometry Models Results Conclusion.
Simulations with event pile up in MVD 1. Improvement of the MVD-digitiser 2. General simulations with pile up 3. Open charm reconstruction Christina Dritsa.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
CBM Software Workshop for Future Challenges in Tracking and Trigger Concepts, GSI, 9 June 2010 Volker Friese.
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
TRD and Global tracking Andrey Lebedev GSI, Darmstadt and LIT JINR, Dubna Gennady Ososkov LIT JINR, Dubna X CBM collaboration meeting Dresden, 27 September.
Feasibility studies of open charm reconstruction with pile up 1. General simulations with pile up 2. Open charm reconstruction Christina Dritsa Outline:
M. Deveaux, CBM collaboration meeting, Oct. 2008, Dubna, Russia A revision of the concept of the CBM – MVD Or: Do we need an intermediate pixel.
Summary STS working group Design optimization STS (Strip) layout R&D (MAPS) Working packages.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
1 J.M. Heuser − Silicon detector systems for CBM Silicon detector systems for CBM Johann M. Heuser, GSI CBM meeting, University of Jammu, 14 February 2008.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
Standalone FLES Package for Event Reconstruction and Selection in CBM DPG Mainz, 21 March 2012 I. Kisel 1,2, I. Kulakov 1, M. Zyzak 1 (for the CBM.
Dmitri Ossetski Obninsk State University Department of Applied Mathematics
NA62 Gigatracker Working Group 28 July 2009 Massimiliano Fiorini CERN.
D. Dutta 13th CBM Collaboration Meeting 1 Dipanwita Dutta Much Segmentation Study: A Flexible Scheme.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
RPC Design Studies Gabriel Stoicea, NIPNE-HH, Bucharest CBM Software Week GSI-Darmstadt May 10, 2004.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
SIGNAL AND BACKGROUND SIMULATION AT THE RECOMBINATION CHAMBER Vadim TALANOV CERN and IHEP, Protvino Joint LHC Machine-Experiments Workshop on Very Forward.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
J/psi trigger status Alla Maevskaya INR RAS 11 March 2009 CBM Collaboration meeting.
Track reconstruction in TRD and MUCH Andrey Lebedev Andrey Lebedev GSI, Darmstadt and LIT JINR, Dubna Gennady Ososkov Gennady Ososkov LIT JINR, Dubna.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
20/12/2011Christina Anna Dritsa1 The model: Input Charge generation The charge of the cluster is taken by random sampling of the experimental distribution.
CBM-Meet, VECC July 21, Premomoy Ghosh CBM – MUCH Simulation for Low-mass Vector Meson Work done at GSI during June 2006.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
D 0 reconstruction: 15 AGeV – 25 AGeV – 35 AGeV M.Deveaux, C.Dritsa, F.Rami IPHC Strasbourg / GSI Darmstadt Outline Motivation Simulation Tools Results.
Realistic detector layout for MUCH system M.Ryzhinskiy, SPbSPU CBM Collaboration Meeting September 25-28, 2007, Dresden, Germany.
1 PP Minimum Bias Triggering Simulations Alan Dion Stony Brook University.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
Masashi Kaneta, RBRC, BNL 2003 Fall Meeting of the Division of Nuclear Physics (2003/10/31) 1 KANETA, Masashi for the PHENIX Collaboration RIKEN-BNL Research.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
Anna Kotynia.  8 stations  fully based on micro-strip detectors Tracking detector: -low-mass detector -full azimuthal angle coverage -polar angle coverage:from.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
LHCf Collaboration Meeting, Catania, 4-6 July 2009 MC comparison: Fluka vs Epics Oscar Adriani.
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Multi-Strange Hyperons Triggering at SIS 100
IPHC, Strasbourg / GSI, Darmstadt
– a CBM full system test-setup at GSI
Updates on vertex detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Huagen Xu IKP: T. Randriamalala, J. Ritman and T. Stockmanns
The LHC collider in Geneva
Feasibility of   γγ study with ECAL
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Presentation transcript:

STS Radiation Environment 11 th CBM Collaboration Meeting GSI, February 2008 Radoslaw Karabowicz GSI

Outline 1.Cave geometry and STS layout 2.Fluka results on cave radiation environment 3.Fluka results on STS radiation environment 4.Geant3 results on STS radiation environment 5.Conclusion 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS detector layout STS geometry: 8 double-sided micro-strip silicon stations composed of sectors with thickness of 300  m Support structure made of carbon boxes Cables are represented as capton boxes with thickness of 200  m Readout: thick layers of silicon and aluminium 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS Radiation Environment (Geant3) Particle energy loss in central Au+Au collisions at 25 AGeV on different STS stations. 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS Radiation Environment (Geant3) Particle energy loss in mbias Au+Au collisions at 25 AGeV on different STS stations. 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS Radiation Environment (Geant3) Comparison between energy loss in mbias collisions and central collisions 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS Radiation Environment (Geant3) Comparison between energy loss WITH and WITHOUT Much system 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

STS Radiation Environment (Geant3 vs Fluka) Comparison between energy loss produced in Geant and that produced in Fluka. 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008

Occupancy Sensors’ occupancy in one Au+Au central 25 AGeV collision 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008 Station 1, z =30cm

Work in progress – realistic response Sector view: Front strips in blue Back strips in green MC points in circles Reconstructed hits: stars Size of plot [cm] Position in STS: X Y Z Front strips’ ADC distribution Back strips’ ADC distribution Simple Event Display 11 th CBM Collaboration Meeting, GSI R.Karabowicz Feb 27 th, 2008 Hit sharing multiply factor: ~3 (guestimated) In other experiment: 1.4

Radiation levels Radiation doses in megarads on the STS silicon stations as calculated by Geant during 6 years* of CBM running. *1 year = 2 months at full intensity (10 7 interactions/s) 11 th CBM Collaboration Meeting, GSI D. Bertini, R.Karabowicz Feb 27 th, 2008 Station 8, z =100cm Station 4, z =50cm Station 1, z =30cm

Conclusions -Difference between minimum bias and central collisions or with/without the MUCH system is rather straight forward -Comparison between Fluka and Geant is not easily to be understood, but was not a surprise for Fluka/Geant experts -Radiation dose on STS is tough, but still tolerable (up to 20MRads in 6 years) -Occupancy reaches 5.7%, but assuming hit sharing of ~1.4 it would rise to almost 10%