Moldova Floods 2010. Joint Government and Development Partners response Chisinau, July 29, 2010. State Chancellery Government of Moldova.

Slides:



Advertisements
Similar presentations
National Response Plan on Natural and Man Made Emergency Situations Emergency Management Department Ministry of Internal Affairs (MIA) of Georgia.
Advertisements

Flood Loss Assessment APFM methodology
FIAR International Insurance- Reinsurance Forum 2013 Nat Cat mitigation programs in Bulgaria Roumen Galabinov.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
1Comprehensive Disaster Risk Management Framework National Disaster Management Systems 111 Institutional Arrangements and Organizational Structures Session.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
OCHA UGANDA TESO FLOODS LESSONS LEARNT July-December 2007.
Transition of Clusters in Zimbabwe September 2013 OCHA Zimbabwe.
Hospital Emergency Management
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
Progress and Strategic Directions in the Pacific Brussels, 07 July 2014 Michael Bonte-Grapentin, Senior DRM specialist.
2008 Hurricane Season in Haiti Post Disaster Needs Assessment (PDNA) Damage, Losses and Needs Estimation.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
RESPONSE TO SHELTER CRISIS APRIL INTRODUCTION In July 2006, Lebanon was the target of a devastating war led by Israel In July 2006, Lebanon was.
NATIONAL DISASTER RECOVERY FRAMEWORK INDIA ANNUAL CONFERENCE OF RELIEF COMISSIONERS VIGYAN BHAVAN, NEW DELHI 27 MAY 2014 MINISTRY OF HOME AFFAIRS, GOVERNMENT.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session identifies the six transitional reconstruction.
Alachua County Post-Disaster Redevelopment Plan Alachua County Board of County Commissioners Meeting April 27, 2010.
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
HEALTH SECTOR ASSESSMENTS IN EMERGENCIES 3rd ANNUAL REGIONAL TRAINING COURSE ON THE MANAGEMENT OF PUBLIC HEALTH RISKS IN DISASTERS FOR THE EASTERN MEDITERRANEAN.
United Nations Development Programme
WRC 2 World Reconstruction Conference 2 Resilient Recovery- an imperative for sustainable development Conference Objective To advance consensus on resilient.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
U.S. Chamber of Commerce: Post Tsunami Reconstruction- Sri Lanka Country Assessment Tuesday January 18 th 2005 by H.E. Devinda R. Subasinghe Ambassador.
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
Part of a Broader Strategy
Community Preparedness & Disaster Planning. Why Disasters occur ?
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
EMERGENCY SUPPORT FUNCTION 6 - MASS CARE & EMERGENCY ASSISTANCE
Community Participation in Recovery Jon Bennett Director, Oxford Development Consultants Wenchuan Earthquake Response, China Workshop, July 14-15, 2008,
Special Session II Increasing Investment for Disaster Risk Reduction.
South Asia Earthquake: Transition from Relief to Development Joint Executive Board of UNDP, UNFPA, UNICEF and WFP New York, 20 January 2006 Presented by:
United Nations Economic Commission for Latin America and the Caribbean (UNECLAC) Disasters Lessons Learned and Impact on Recovery and Reconstruction University.
INITIAL PLANNING CONFERENCE FOR ARF DiREx 2015
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Spencer Stevens FHWA Office of Planning Michigan Transportation Planning Association 2011 Annual Conference July 14, 2011.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Rehabilitation in agriculture What can we learn from recent experiences? Laurent Thomas, Director FAO Emergency Operations and Rehabilitation Division.
Survivor Centric Emergency Management Integrating the Access and Functional Needs of the Whole Community Before, During and After Disasters August 2015.
The Early Recovery and Reconstruction Cluster in Pakistan - From saving lives to restoring livelihoods - Angelika Planitz UNDP BCPR Shelter Meeting May.
Shelter Meeting 09b is hosted by UNHCR Safer Homes, Stronger Communities: Rebuilding After Disaster Update of “Safer Homes, Stronger Communities: Rebuilding.
 WHAT IS MITIGATION?  DISASTER MANAGEMENT CYCLE.  ORGANISATIONS RESPONSIBLE FOR DISASTER MANAGEMENT AT THE REGIONAL AND NATIONAL LEVEL IN THE CARIBBEAN.
National CEP strategies, priorities and related policies in Ukraine 4 june 2009, Brussels, NATO HQ Valeriy Tretyakov, Deputy Minister of Ukraine of Emergencies.
Shelter Meeting 09b is hosted by UNHCR Shelter After Disaster: update Shelter After Disaster: transitional settlement and reconstruction Shelter After.
UNCLASSIFIED As of W Mar 08 Mr. Scott A. Weidie, J722 1 Multinational Planning Augmentation Team (MPAT) 04 March 2008 Governments and Crises: Roles.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
2008 Cyclone Season in Madagascar Results of the Assessment.
Cash for Repair & Reconstruction Project, Sri Lanka 1 November 16 / 2006 Cash for Rehabilitation Home owner driven housing reconstruction project in Sri.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Disaster Risk Management Concepts and Applications Southern Province of Sri Lanka 1.
CCfER Training, 7 December, 2015 Integrated Early Recovery Programme Response.
Evacuation Procedures City Council October 20, 2015.
November 7th 2009, the combined effect of Hurricane IDA and low-pressure system off the Pacific Coast led to heavy rainfall (355mm in few hours) Severe.
A Presentation to the 2017 GEO Work Programme Symposium,
San Bernardino County OES
DISASTER MANAGEMENT.
NEPAL RECOVERY TO RESILIENCE
Flood No.5 in Nghe An Qui Chau and Que Phong districts
District Disaster Risk Reduction Managment Plan
Recovery Cluster Meeting
South Australia’s recovery arrangements
Shelter and reconstruction options
Exercise.
Developing a shelter strategy
Yemen Towards early recovery
Presentation transcript:

Moldova Floods Joint Government and Development Partners response Chisinau, July 29, State Chancellery Government of Moldova

Situation Overview  1084 flooded households  3114 displaced persons: (incl. 614 children and 30 pregnant women). 2 persons dead  Children evacuated to summer camps, adults ensured with temporary shelter  7 bridges, 9 km of roads, 21 km of electricity lines, 17 km of dams damaged or deteriorated (data from the field, covering all 16 affected districts throughout the country) Exact Losses Unknown

Immediate Coordinated Actions  A command center lead by the Gov. Group established in first 24 hours  Protection: 725 persons immediately dislocated in the field (Army, Carabinieri, Police)  Around 1300 families evacuated from risk areas, 1800 rescue / evacuation missions in first three days (goods and people)  30 km of new temporary dams built and permanently maintained – over 200 households, 2 roads, saved from flood  2 bridges reinforced, alternative access roads built to flooded areas  Healthcare: 4 mobile emergency posts, 3 permanent posts – over 240 people assisted; evacuated people vaccinated against A Hepatitis.  Public order maintained by 12 road police posts and one reinforced police department in Obileni. 15 collection and distribution points permanently guarded

Prompt Government response  All people in flooded households and under risk were evacuated immediately  Available aid immediately deployed: food, water, medicines, tents, fuel  Special Working Group, chaired by Minister of State instituted, and deployed on the ground during the peak of the disaster (three weeks)  Appeal by Prime Minister Vladimir Filat to the international community and development partners

Prompt Government response  Coordination assistance assigned with Aid Coordination Unit in the State Chancellery  At regional (district) level, assistance coordinated by District Emergency Situations Committees  Site in a risk-free area for building 700 new settlements identified, planning and design works carried out  Permanent information of the population (mobile audio devices, billboards, door-to- door) carried out

Emergency Aid mobilized from within the country DistributedAvailable Foodstuff228.7 t unit 41.7 t unit Personal use items91.3 t unit 20.4 t. 38 units Hygienic products1.98 t units 20 kg units. Industrial products150 kg 1740 units units Strategic products (crops, fuel)-11.7 TOTAL t units 73.4 t units

Donor-funded emergency needs and interventions (calculated until September 30, 2010) Monetary needs (USD) as of :  Cases of oversupply, with in-kind products. Although any separate initiative is encouraged, in order to rationalize the use of resources, coordination of actions with the authorities is paramount both at national and local level

Monetary Pledges

Government Treasury Account Small part of funds has been transferred for the hard-hit for covering urgent needs Bulk of government treasury account funds to be directed at recovery and reconstruction efforts Total donations Cash transfers Funds available Situation as of 28/07/2010, expressed in USD

Emergency needs

Post-Disaster Actions – mid-term. Phase 1: Post-Disaster Needs Analysis. Financial and logistic support secured from UN, World Bank and European Commission. Estimate cost of the action – USD. Phase 2: Identification and mobilization of funds Phase 3: Elimination of flood consequences Phase 4: Disaster Risk Reduction

Post-Disaster Needs Analysis (PDNA) – Aug 2-Sept 9, Overall Objective: determine the floods impact Short-term impact mitigation; recovery and reconstruction needs; financing requirements Medium and long term Elaborate measures to reduce the risk of future floods and other hazards Improved disaster reduction management strategy Financing needs – substantial, not yet assessed.

Estimated post-disaster recovery needs to be addressed  Housing settlements – an estimate of 700 houses to be built  Social services and infrastructure  Infrastructure: roads, dams, communications  Compromised private business plans – to be assessed  Seasonal, annual, permanent crops destroyed – to be assessed  Destroyed farmland and pastures  Environmental damage, healthcare risks

Estimated post-disaster needs  Legal, institutional framework in the sector needs improvement and clarity  Stringent need for organizational re-engineering and capacity building for improved disaster reduction management strategy  Design a Flood and multi Hazard Risk Management strategy  Explore the possibility for establishing a compensation mechanism (insurance fund)