Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.

Slides:



Advertisements
Similar presentations
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Advertisements

Observations with the Transverse Damper at High Intensities G. Kotzian for the Damper Team BE-RF-FB, 23. February 2015LIU-SPS intermediate internal scrubbing.
New PS one-turn delay feedbacks and further developments
Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:
Linac 4 LL RF Hardware Architecture and Design Status
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
LLRF FOR THE SPS 800 MHZ CAVITIES G. Hagmann, P. Baudrenghien 12/12/2013LIU meeting 1.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
AB-RF-FB LLRF Developments at CERN Historic Overview, Highlights, Future Challenges Flemming Pedersen.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
New PS one-turn delay feedbacks and further developments Thanks to Alfred Blas, Heiko Damerau, Guido Sterbini, Simone Gilardoni, Letizia Ventura, Valentin.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Requirements for the PS/PSB TFB board 1 Alfred Blas Working group meeting - 07 December Sampling frequency 2.Required Delayed Clocks.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
BCC-35 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), S. Rey, D. Stellfeld, D. Valuch, P.Baudrenghien.
RF/BR section 2014 highlights. RF/BR section in 2014 ARGYROPOULOS Theodoros BOHL Thomas BORGMANN Silke CALAGA Buchi Rama Rao CASPERS Friedhelm CHAPOCHNIKOVA.
Coupled bunch instabilities in the CERN PS
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
Controls & software Andy Butterworth.
L4-PSB working group meeting 25/06/2009
Philippe Baudrenghien, Grégoire Hagmann, BE-RF,
Plans for ions in the injector complex D
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
ADT and ObsBox in 2016 W. Hofle, M. Jaussi, G. Kotzian, S. Rains,
Digitizers in CCR for transverse wide-band pick-ups
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Transverse Feedback System (LHC Damper)
Limits on damping times
Beam dynamics requirements after LS2
Presentation transcript:

Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December

2 FB FB  “Feedbacks & Beam Control” “Low Level RF” and Transverse Feedback: 25 people in FB (20 Staff): Electronics and Control Loops Conceptual Design, Hardware, Firmware, Operation RF Group

FB Section at 2013 RF Group Meeting - December Acknowledgements: … Accelerators and Projects with FB Contributions

Organisation – Exploitation and Projects FB Section at 2013 RF Group Meeting - December Provide support for operation of the LLRF systems of existing accelerators, including Machine Supervision, Stand-by Service and Expert Support Provide Machine Development Support Design and simulations of Feedback systems Hardware and Firmware Development for Feedback Systems Contribute to conceptual design of future RF and transverse feedback systems Staff Members: 21  20 Staff 5 Students / Fellows: F.J. Galindo, T. Levens, A. Mikkelson, M. Sundal, S. Zorzetti Staff members (21) Stand-by Service for LLRF jointly with CS section

FB Section at 2013 RF Group Meeting - December LHC as p-Pb collider Successful four week LHC p-Pb run in 2013 Smooth transition between p-p and p-Pb Flexible LLRF: accelerated with separate RF, synchronization of rings at flat top LHC Transverse Feedback used at injection, ramp and during collisions for Pb and p beams Bunch trains of both rings slide against each other during acceleration, no instabilities Performance limitations dominated by IBS Excellent performance of Pb injector chain P. Baudrenghien, J. Noirjean et al.

FB Section at 2013 RF Group Meeting - December LHC - preparation of future (1) for 2015: 25 ns beam operation, beam scrubbing against e-cloud effect optimization of LLRF for 25 ns 2015 improvement of noise performance in ADT (pick-ups, cabling, electronics) Long term preparations for HiLumi era in LHC (HiLumi Project) and injectors (LIU Project) for 5x peak nominal Luminosity ADT LS1 Upgrades: New cables, new pick-ups new electronics LHC High Lumi Preparations: Example: crab cavity LLRF including SPS tests New kicker designs for transverse feedbacks (SPS-LIU) Collaboration with SLAC and INFN Frascati Mechanical Design and construction: PM Section Scrubbing beam: Bunches split: Make LLRF and TFBs work with it 1 GHz bandwidth

FB Section at 2013 RF Group Meeting - December LHC - preparation of future (2) LHC Schottky signals acquisition from RF PU Transverse Tune Diagnostics and “data mining” in ADT data Transverse instability trigger using White Rabbit (cooperation between RF, BI and CO) Improvements: SPS and LHC BQM, Bunch Length Measurement and long. Blowup Long phase modulation to reduce klystron power Long. Damper MDs and commissioning to be continued Quench Tests using ADT in February 2013 LHC Schottky diagnostics from long. PU (with BR Section) LHC Tune diagnostics from ADT (with CS Section) Quench tests with ADT: three of four Quench tests used ADT, slow and fast losses created with ADT excitation Fast Quench Test with ADT

FB Section at 2013 RF Group Meeting - December LINAC4 LLRF Functional block diagram of the Cavity Controller system Functional block diagram of the Cavity Controller system Cavity Loops module Switch & Limit module Tuner Loop module Clock Distributor module RFQ in Linac4 Tunnel RFQ commissioning with LLRF started In LINAC4 Different LLRF modules built for LINAC4 in cooperation with CS Section Racks in Faraday Cage (RFQ controller) P. Baudrenghien, F. Galindo Guarch, G. Hagmann, J. Molendijk, J. Noirjean, D. Stellfeld

FB Section at 2013 RF Group Meeting - December GHz oscillator frequency, up- multiplication to 12 GHz Down conversion of RF signals to 400 MHz for direct digitization by National Instruments ACQ Boards Observation of signals in I/Q Prototype of analogue part A. Andersson, S. Rey, L. Timeo IF signals for NI ACQ system LLRF: Block diagram Signals on NI crate LLRF for X- Band Teststand at 12 GHz

FB Section at 2013 RF Group Meeting - December D. Valuch / M. Elias HIE Isolde LLRF 32 SC cavities Cu/Nb coated High Q, low power Low beam intensity Acceleration of radio-active ion beams Start-up in Self excited Mode (SEL mode) Lorentz-Force detuning Conditioning Flexible phasing for rapid species change LHC VME HW platform Synergy with electronics for SPS 800 MHz Feedback Hardware & Control algorithms, SM18 support

FB Section at 2013 RF Group Meeting - December P. Baudrenghien, G. Hagmann SPS – LLRF upgrades (LIU) SSB Modulator IF (I & Q) ≈25MHz Dual TxDac 16 bits RF Demodulator RF&LO mixing IF ≈25MHz 14 bits ADC Fs=4 · IF ≈100MHz 4x LO Distribution 2 x Duplex Optical Serial Links 2 in & 2 out 2Gbits/s ( ≤ 3.2Gbits/s) SRAM 2x8 Mbyte for diagnostics VME P1 backplane for slow controls & readout Dedicated backplane (P2): Power Supply Clocks Interlocks … Xilinx Virtex 5 SX SPS 800 MHz TWC prototype 11 Typical LLRF board, integration of analog and digital components  here tailored to SPS 800 MHz system

FB Section at 2013 RF Group Meeting - December Hardware for SPS LLRF Controls renovation and Ions SPS controls renovation, replacement of obsolete MMI system (with CS Section), BA3 and BA2, VTUs, Inj. Phase, Inj./Extr. Pulses  all moved to new hardware and controls BA2 Damper: new hardware to come Function Generator Module for SPS (Hardware, Firmware and Installation in Faraday cage in BA3, BA2 to come Supervision of cabling in tunnel in BA3 completed (BA2 in 2014) Preparation of SPS LSS3 for future RF upgrade (PU moved) Preparation for ions (Ar) FFA Studies and improvements of noise for ions SPS frequency program (with CS section) Noise improvements on Ion Beam Control J. Ferreira Bento, G. Kotzian, T. Levens, D. Stellfeld, U. Wehrle + CS / BR Section Function Generators installed in FC BA3

FB Section at 2013 RF Group Meeting - December M. E. Angoletta, A. Blas, R. Louwerse, J. Sanchez Quesada AD and Elena Antiprotons: Accumulation and Deceleration (Extra Low Energy Anti-Protons) Consolidation of AD LLRF, TFB, and Stochastic Cooling (+ CS and BR Section) Elena Ring: Design of LLRF and RF diagnostics Elena cycle Elena Elena and AD in the AD Hall

FB Section at 2013 RF Group Meeting - December M. E. Angoletta, A. Blas, A. Findlay, J. Molendijk (CS), J. Simonin (CS), J. Sanchez- Quesada, Six types of modules: MDDS v 2.0, ADC v3.0, DAC v 2.0, FMC-DSP-Carrier v 1.0, RTM v 2.0, VXS Switch v 2.0. VXS switch v 2.0 compatible with future B-train distribution Geared for machines with very large frequency swing Hardware for Injector Synchrotrons LLRF Baseline for: PSB MedAustron LEIR ELENA AD Application also for: Instrumentation (ELENA, AD) Future extension to other accelerators under study Successful Tests in PSB in 2013 Full deployment in PSB for start-up in 2014 Gradual migration of beams to new system Compatible with planned PSB Finement cavity system

FB Section at 2013 RF Group Meeting - December Tested basic features in view of new feedback kicker (finemet cavity)  Damping on different harmonic than detection works fine Detect at h = 13  damp with C10-11 at h = 8 Detect at h = 8  damp with C10-11 at h = 13 H. Damerau et al. Preparations for a new coupled-bunch feedback in the PS (LIU)

FB Section at 2013 RF Group Meeting - December Four new VME crates (LHC style) in building 359 (one for each tuning group) Same digital hardware also to be used for the 1TFBs on high frequency cavities and long. damper New inter-rack and under-floor cabling, controls renovation with CS section and BE-CO, PSB and PS Example: feedback for tuning group B (cavities 56, 66, 76 and 81)  After LS1: New 1-turn feedback and digital AVC loop (all 10+1 cav.) (in collaboration with IS section) H. Damerau, D. Perrelet Installation of new 1TFB on all 10 MHz cavities

FB Section at 2013 RF Group Meeting - December Safety: ESD: A very personal view LLRF05 Sweater

FB Section at 2013 RF Group Meeting - December A lot to complete for the Start-up 2014 Profit from the end of year break !