SURATGARH SUPER THERMAL POWER STATION

Slides:



Advertisements
Similar presentations
In India 65% of total power is generated by the Thermal Power Stations. Main parts of the plant are 1. CHP.
Advertisements

Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
PRESENTATION OF INDUSTRIAL TRAINING ON
THERMAL POWER PLANT.
SURATGARH SUPER THERMAL POWER STATION
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Steam (Vapour) Power Plant Rankine cycle Power Plant
WELCOMES ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1.
Steam Power Plant.
AC Machine.
Three-Phase ac Voltage Generation
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Gas Turbine Power Plant
How Power Plants Work. What is electricity? Charge is one of the fundamental characteristics of matter Particles like protons and electrons have a certain.
Operation and Maintenance
A SEMINAR PRESENTATION ON SURATGARH SUPER THERMAL POWER STATION
AIM :- TO STUDY ABOUT STEAM POWER PLANT
1 Motors and Generators ©Dr. B. C. Paul More Fun with Flux Mechanically Rotated Shaft Slip Rings Wires with brush contacts to slip rings Electromagnetic.
They are broadly classified as:
Chapter 5. Synchronous Machines.
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Welcome PRESENTATION BY ASHISH MISHRA.
STEAM POWER PLANTS.
Generator protection Generator protection is very complex compared to protection for other elements of the power system. For example, when a turbo-alternator.
Construction of Turbo Generator
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
THERMAL POWER PLANT. INTRODUCTION : THERMAL POWER PLANTS CONVERT THE HEAT ENERGY OF COAL INTO ELECTRICAL ENERGY. COAL IS BURNT IN A BOILER WHICH CONVERTS.
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
A Presentation On Summer Training At Bharat Heavy Electricals Limited, Haridwar.
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To :- NITESH SONI.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
Thermal Power Station.
KOTA SUPER THERMAL POWER STATION ,KOTA
Submitted to: Submitted by:
A Presentation On Construction Of Turbo Generator
THERMAL POWER PLANT.
SURATGARH SUPER THARMAL POWER STATION
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
Seminar Report On KOTA SUPER THERMAL POWER STATION Submitted in partial fulfilment for the Award of degree of BACHELOR OF TECHNOLOGY In Electrical Engineering.
A Presentation on construction of Turbo Generator.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To : Department.
Presentation on Steam Power Plants R.C.Chaturvedi
INDUSTRIAL TRAINING AT
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
Industrial Training Project on Turbo Generators
Presented by Presented to:- Mr.Rajan Karir Associate Professor A PRACTICAL TRAINING SEMINAR ON KOTA SUPER THERMAL POWER STATION,KOTA UCE, RTU, Kota.
Prepared by : Nishant .A. Raval
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
AC Machines. BOOSTER Basic Function:- -Sometimes when we use electrical power we need different voltage level to main supply. It is provided by Booster.
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
TRAINING SEMINAR Submitted By :- Submitted To:- Training carried at:
Presented By :- Saurabh Sharma VII th semester Electrical Branch Guided By :- A SEMINAR PRESENTATION ON Supriya Kumari Asst. professor (EE) KOTA SUPER.
Thermal power plant , panipat
By : VAIBHAV KUMAR IV YEAR, VII SEM ELECTRICAL ENGINEERING.
Introduction And Thermal Power Plant
Seminar on Practical Training By: Er. Kapil Kantia Electrical Engineering BIO-MASS ENERGY DIVISION.
CHAPTER 10 SYNCHRONOUS MOTOR Electrical Machines.
Gas Turbine Power Plant
 II THE ADVANTAGES OF ELECTRICITY
Gas Power Plant - Layout and Operation
POWER PLANT THERMAL POWER STATION.
INDUCTION MOTOR.
BASICS OF ELECTRICAL ENGINEERING
BASICS OF ELECTRICAL ENGINEERING
Induction Motor. Induction motor Main parts are Stator Rotor.
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Generation of Electrical Energy: Sources and Generators
Presentation transcript:

SURATGARH SUPER THERMAL POWER STATION A SEMINAR PRESENTATION ON SURATGARH SUPER THERMAL POWER STATION

Location of station on broad gauge main Railway line. ADVANTAGES OF CHOOSING SURATGARH FOR THERMAL PLANT SETUP : Availability of large amount of clean cooling water required for the station. Location of station on broad gauge main Railway line. Constant power supply. Proximity to M.P. Coal fields. Transmission and Grid substation are quite nearer to the site.

CONTENTS OF THE PRESENTATION: INTRODUCTION BLOCK DIAGRAM AND PROCESS OF STEAM GENERATION COAL HANDLING PLANT. BOILER PROCESS AND ITS SPECIFICATION. TURBINE AND TURBO GENERATOR. ASH HANDLING PLANT PROTECTION AND SWTICHING (CONTROL PANEL)

Introduction Of SSTPS Location: situated near village riyanwali about 25km from Suratgarh town Installed capacity: 1500 MW. 7th Unit of 250MW is under construction. Favorable conditions: Availability of large amount of water. Location at broad gauge Delhi-Mumbai railway. Concentration of load. Constant water supply. Transmission and grid sub station are quit near.

SSTPS IS DESIGNED IN SIX STAGES Units Rating Cost Date of Commission I 1 250 MW 143Cr. 17/01/1998 2 13/01/2000 II 3 480Cr. 25/04/2001 4 01/05/2002 III 5 480 Cr. 21/03/2003 IV 6 535 Cr. 30/04/2010

BLOCK DIAGRAM OF THERMAL POWER PLANT

PROCESS OF STEAM GENERATION

OVERVIEW OF COAL HANDLING PLANT Row coal from bharat coal ltd. Dhanbad & bilaspur(MP) To SSTPS from gurla via a single railway track Wagon trippler Bunkers Crusher house Hoppers Coal mills (pulverization) Row coal feeders Boiler furnace ( tangential firing of pulverized coal)

Air from environment via draft fans BOILER PROCESS: stack Boiler water tubes & various stages Flue gases DM water Super heated steam Air from environment via draft fans Boiler furnace Ash handling plant Pulverized coal

TECHNICAL SPECIFICATION OF BOILER 1.TYPE Water tube ,pulverized fuel fired, single drum type, tangential firing system 2. MAKE BHEL 3. CAPACITY 680tonnes /hour(250MW) 4. PRESSURE 155 Kg./cm2 [G] 5.TEMPERATURE 540 degree

TURBINE :- Turbine is a machine in which a shaft is rotated steadily by impact of steam it converts heat energy into mechanical energy. High pressure TURBINE Intermediate Low pressure

TURBO GENERATOR :- Designed for continuous operation at the rated output. Driven by directly coupled steam turbine at a speed of 3000 r.p.m. Have two main parts: Rotor Stator A temperature detector is provided to maintain the temperature. Temperature of windings is maintain by H2 coolant.

Stator Frame: Welded steel frame construction. Withstand the thermal gas pressure.   It is used for holding the armature stampings and windings in position. Stator Core: Built up of special sheet laminations to minimize eddy current losses . The laminations are stamped out and after that each lamination is varnished on both side.

Stator Bars: Manufactured as half bars. Made in strips to reduce skin effect. Semi-conductor coating is also applied  to a part of overhung to reduce eddy currents to minimum. Stator Windings: Double star layers, lap wound, three phase, short pitch type(to reduce losses). Complete arrangement of winding circuit is viewed from turbine end of generator.

ROTOR: Smooth cylindrical type Rotor shaft made of single piece alloy steel forging of high mechanical and magnetic properties. The cylindrical structure gives better balance , less losses To avoid excessive peripheral velocity rotors have small diameter.  The slip rings are made of forged steel.  They are located at either side of Generator Shaft.

ASH HANDLING PLANT Electrostatic Precipitator(ESP). Chimney. Ash Fly ash (80%). Used for making bricks. Cement. Bottom ash (20%) Used to improve fertility. Roads. To collect ash two ponds of capacity 150 & 230 hact. Are available `

ESP BLOCK DIAGRAM OF ASH HANLING PLANT FURNACE EXHAUSTED GASES FLY ASH & FLUE GASES (80%) ESP FURNACE CHIMNEY DRY & WET ASH(20%) HOPPERS TRANSPORTED TO CEMENT FACTORIES ETC. BLOCK DIAGRAM OF ASH HANLING PLANT

Circuit breakers Isolators Lightning arrestors C.T P.T Relays PROTECTION & SWITCHING: Circuit breakers Isolators Lightning arrestors C.T P.T Relays Control panel

CIRCUIT BREAKERS: Bus coupler is provided with minimum oil circuit breaker of BHEL make. ISOLATOR: All the isolators are provided in 220 KV switchyard and are motor operated. CURRENT TRANSFORMER: All the 220 KV current transformers are provided for measuring and protection.

POTENTIAL TRANSFORMER: Each of 220 KV buses is provided with three P.T.’S are core for each phase of BHEL make. LIGHTENING ARRESTOR: For protection against lightening each if line feeder, generator transformer, station transformer has been provided three L.A. (One for each phase).

CONTROL PANEL CONTROL ROOM Steam pressure & control desk Turbine desk Generator control desk Fuel control desk Fan control desk

QUERIES…..

It is good to have good will.. It is good to have enthusiasm.. But it is essential to have “Training”.. THANK YOU…