MCC TF160 / SS VENDORS SESSION 3GPP RAN5#69 16 th – 20 th November 2015 Anaheim, USA R5-15xxxx MCC TF160 © ETSI 2014. All rights reserved.

Slides:



Advertisements
Similar presentations
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
Advertisements

1 Development and evolution of 3GPP Core Network Hannu Hietalahti, CT chairman.
Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox.
All you always wanted to know about 3GPP … but were too afraid to ask.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
T3UC 2012 Bangalore, India12-13 June, 2012 © ETSI All rights reserved IMS voice conformance test over LTE ETSI STF160.
Voice over IP Fundamentals
1 3GPP TSG CT Chairman 3GPP TSG CT Chairman Hannu Hietalahti Hannu Hietalahti 3GPP presentation Architecture evolution Moscow, October 2008.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February Next Generation Core Networks Summit 2011 Standardisation and Developments within SAE.
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
TF160 / SS VENDORS SESSION 3GPP RAN5#65 10 – 14 November 2014 Venice, Italy R5-14xxxx Presented by TF160 Leader © ETSI All rights reserved.
1 Progress made in specifying the GERAN Andrew Howell, Chairman (Motorola) Marc Grant, Vice-Chairman (Cingular Wireless)
Istanbul, April.2014GSM-R Packet Switched Technology Ingo Wendler / UIC Project Manager - ETCS over GPRS GSM-R Packet Switched Technology Introduction.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Service requirements from 3GPP TS SDO Emergency Services Coordination Workshop (ESW06) Columbia.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
IEEE P802 Handoff ECSG Submission November 2003 Stephen McCann, Siemens Roke ManorSlide 1 WLAN – Cellular Interworking Stephen McCann, Siemens Roke Manor.
Support for CSFB Tony Lee David Wang David Wang June/15/2009 VIA Telecom grants.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: srho Title: Introduction of 3GPP IWLAN Architecture and SRVCC Date Submitted: Presented.
Critical Communications Workshop, 26-27/August 1 © 3GPP 2012 © 3GPP GPP Status Balazs Bertenyi Chairman of 3GPP TSG SA.
Ronald D. (Ron) Ryan Chair T1P1.SAH Slide 1 Copyright Nortel Networks T1P1/ Overview 3G UMTS LI Capabilities T1P1.SAH April 2001.
Geneva, Switzerland, 11 June 2012 Switching and routing in Future Network John Grant Nine Tiles
CP-a Emergency call stage 2 requirements - A presentation of the requirements from 3GPP TS Keith Drage.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Protocol Testing GSM /GPRS Protocols: MM, CC, RR,Physical Layer, RF & NAS UMTS Protocols: NAS, RRC,RLC,MAC,BMC,PDCP, Physical Layer, RF,QoS Core specs.
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
5th Emergency Service Coordination Workshop 3GPP Update Deb Barclay Alcatel-Lucent October 2008.
1 © NOKIA Functionality and Testing of Policy Control in IP Multimedia Subsystem Skander Chaichee HUT/Nokia Networks Supervisor: Professor Raimo.
LTE Mobility. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text.
Typical M²M applications InduBox GPRS sample applications.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
Company Confidential 1 © 2006 Nokia IMS emergency reqs.ppt / 4-Jul-2006 / Hannu Hietalahti IMS emergency call requirements Presentation for 3GPP – IETF.
VoLTE Device Interoperability Challenges
VoLTE Device Interoperability Challenges
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
IMS developments in 3GPP
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
November 2001 Lars Falk, TeliaSlide 1 doc.: IEEE /617r1 Submission Status of 3G Interworking Lars Falk, Telia.
COMBINING CIRCUIT AND PACKET BASED SERVICES IN CONVERGING NETWORKS Sauli Österman
ETSI TCCE WG4 work G. Marque-Pucheu (Airbus / ETSI TCCE WG4) 26-27/08/ 2014.
3GPP TSG RAN WG2 meeting #92 Nanjing, China 23-27, May 2016 R
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation ETSI RTEGSM-R #18 ETSI & GERAN update on ER-GSM band introduction 27.
1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP
Doc.: IEEE /1060r1 Submission September 2013 S. Rayment, Ericsson & S. McCann, BlackBerrySlide 1 3GPP Liaison Report Date: Authors:
Ultra-Flash CSFB(SRVCC based CSFB)
NetHawk EYE Network Monitoring System Introduction
Status Report RAN WG6 to TSG-RAN #73
Status Report RAN WG6 to TSG-RAN #73
MCC TF160 / SS Vendors Sidebar
MCC TF160 Status Report (Pre-RAN5#75)
TSG-RAN Workshop on Radio mobility MOB
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
LTE Mobility LTE Mobility.
© ETSI All rights reserved
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
Service requirements from 3GPP TS
VoLTE Device Interoperability Challenges
3GPP Status.
MTS#59 - Input from CTI Silvia Almagia May 2013
OMA – SUPL Security SUPL 1.0 has reliable security for H-SLP non-emergency location of a SET 3GPP solution 1: GBA (Generic Bootstrap Architecture) support.
György Réthy MTS IPT chairman
TTCN-3 Status Report.
Open Forum th November 2016.
STF430 Final Report Summary
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Thesis Work Presentation
UPDATE on SVN & MANTIS Upgrade
UPDATE on SVN & MANTIS Upgrade
UPDATE on SVN & MANTIS Upgrade
Name of Speaker, Title and Organization
CTI/MTS collaboration - 3GPP TF160
Presentation transcript:

MCC TF160 / SS VENDORS SESSION 3GPP RAN5#69 16 th – 20 th November 2015 Anaheim, USA R5-15xxxx MCC TF160 © ETSI All rights reserved

Agenda Workshop#31 – open Action 31.3: TF160: To provide status update on IMS re-transmissions and Big Grants. RTP/RTCP loopback – R : follow-on discussions on the two alternatives. IMS GBA (Anritsu): Different IP address / port number for BSF server? TTCN CRs reservation system: migration to 3GU. GCF WI-087/097 EPS FDD/TDD - GERAN Inter-RAT Protocol Rel-8: Several TCs still unverified © ETSI All rights reserved

Workshop#31 – open Action 31.3 Action 31.3: TF160: To provide status update on IMS re- transmissions and Big Grants. Confirmed that: In test cases with default IMS handling (i.e. no test case specific IMS behaviour) we have a TTCN default handler which in case of unexpected IMS messages (e.g. SIP re-transmission) just discards them. © ETSI All rights reserved

RTP/RTCP Loopback – R R was discussed Tuesday morning in the RAN5 SIG session. RAN5 endorsed that two possible ways forward will be discussed further, with a final decision being taken by the end of RAN5#69: A. Keep the current test model with clarifications in TS prose. B. Alternative test model based around TTCN socket emulation. Questions on AlternativeB? © ETSI All rights reserved

IMS GBA Different IP address / port number for BSF server? © ETSI All rights reserved

TTCN CR Tdoc number reservation system – Status Update Current status: ETSI ADN system still in use for TTCN CRs for both RAN5 (R5s15xxxx) & GERAN3 (G3t15xxxx). 3GU migration plans: When: Plan is to start using 3GU right after TSG RAN#70, i.e. week starting 14 th December TTCN CRs reservation will use 3GU (same as RAN5 prose CRs). RAN5: R5s16xxxx. GERAN3: H1’16: G3t16xxxx. H2’16: R5s16xxxx (GERAN3 merged into RAN5). Further details TBC. © ETSI All rights reserved

GCF WI-087/097 EPS FDD/TDD - GERAN Inter-RAT Protocol Rel-8 TCTitleGERAN feature Inter-RAT cell reselection failure from GPRS Packet_transfer to E-UTRANACC Inter-RAT cell reselection / From GSM_Idle/GPRS Packet_Idle to E-UTRA idle CSG cellCSG Inter-RAT handover / From E-UTRA to GPRS / PS HOPS HO Call setup from E-UTRA RRC_IDLE / CS fallback to GSM with PSHO / EDTM not supported / MT callPS HO Call setup from E-UTRA RRC_CONNECTED / CS fallback to GSM with PSHO / EDTM not supported / MO callPS HO Call setup from E-UTRA RRC_IDLE / CS fallback to GSM with PSHO / EDTM supported / MT callPS HO Inter-system mobility / E-UTRA to GPRS packetPS HO Inter-RAT PS handover / From GPRS Packet_transfer to E-UTRA cellPS HO Inter-RAT PS handover / Synchronized / from GPRS Packet_transfer to E-UTRA cell / CCN modePS HO Inter-RAT PS handover / Synchronized / from GPRS Packet_transfer to E-UTRA cell / NC2 modePS HO WI-087 has got 44 TCs, out of which 10 are still in ‘verifiable’ status. Any idea on the cause(s)? Is it because the required GSM/GPRS features are typically not implemented/deployed? (e.g. PS HO?) Should those TCs be added to iWD-003? © ETSI All rights reserved