MICE VC Alain Blondel 9 - 03 - 2003 1 MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
2 Oct 2008PC We have only 1 hour today May need to be brief.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Marcel Stanitzki Rutherford Appleton Laboratory
Collaboration Board Summary
Paul Drumm VC 14th September 2005
European Detector R&D: AIDA
Presentation transcript:

MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were not associated with the parts concerning MICE, which were or would have been ready but with detectors and access to CERN or Gran Sasso. Learned a lot, will now concentrate on preparing a powerful bid for a Neutrino Factory Design Study. (First prestudy of which was requested by John Wood, RAL CEO to Ken Long) 2. MICE will be a recognized CERN experiment. This gives access to CERN and to some important practicalities: use of team accounts, some office space 3. we have un-official news that the MICE-UK project has been approved by PPARC NSRC, and finally CCLRC! Congratulations! Official statement will be made by the Minister of Sciences (Lord Sainsbury) in a few weeks. Do not talk to your favorite tabloid about ‘approval of mice by UK’ until then, please. A. Funding and status

MICE VC Alain Blondel "We have just heard that the last formal barrier to MICE approval in the UK and at the Rutherford Laboratory has been passed. We expect the formal announcement from the Minister in the next two to three weeks." Ken also added: "Because of the sensitive issue of "protocol", it would be very embarrassing if there was any public announcement before the Ministerial statement."

MICE VC Alain Blondel most relevant conclusions of executive board meeting 13-february 2005 at Berkeley 1.DAQ controls and monitoring working group. Edda would be the WBS responsible for DAQ Makoto will be reponsible for tracker DAQ Brian Martlew from Darsbury will be responsible for the controls and interlocks [meanwhile Edda has a job at CERN and AB is looking for a replacement!] 2.it was re-stated that the completion of TPG R&D remains an integral part of the MICE project. 3. Analysis working group and task. we are preparing the job description of an analysis task leader. 4. Launch « readiness » audits by D&S group. --> No major problems foreseen. First step is to ensure that the task leaders that were absent at the CM are really on board. 5. responsibility of tracker-RF shield will be the responsibility of the tracker module 6. PID shielding plates (also in step 2) will be part of the tracker module. They will be assembled together with the spectrometer solenoid.

MICE VC Alain Blondel the effect of beam scraping on shielding plate on the emittance measurements will be studied (actions Vittorio  Yagmur, Malcolm) to finalize the hole in this plate. 8. Diffuser task is: -- define specs: what (how many thicknesses) and where (optics problem) -- design system with less than 30 minutes changeover time. This again is a responsibility of the tracker module. An ad hoc working group (Kevin Tilley, Chris Rogers, et al) will work it out. 9. TOF is now urgent  Alain will contact Bonesini to begin purchases with aim to participate in the KEK beam test in october 2005 (see next VC) [funds requested at Geneva to begin with a small TOF0 and TOF1 prototype] 10. policy for protection and blessing of MICE related information. Long and Blondel will come up with a proposal by 15 March 11. relation with Manx. --> Dan Kaplan will invite Rol Johnson et al to give a presentation to the next MICE CM in Frascati 12. next meeting it was suggested to get together one week after the VC so that the TB can happen in between (wednesday-monday-friday) next EB meeting will be on thursday 17 March 21:00 GMT (18 March 6:00 in Japan) to try the winter time option.

MICE VC Alain Blondel First beam 1st April 2007 **** 365*2 +22= 752 days to data taking !!!