1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

Software Quality Assurance Plan
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Quality Management System
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
1 Mike Saleski 1 Safety Systems Configuration Control FAC 2009 Safety Systems Configuration Management E. Michael Saleski Control.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
School of Computing, Dublin Institute of Technology.
E. M. Saleski FAC 11/11/08 Configuration Control of PPS FAC Review November 2008 E. Michael Saleski Controls Dept Safety.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Configuration Management
Stephen S. Yau CSE , Fall Security Strategies.
Breakout Group 2: Software Quality Assurance Outcome 8/18/10 1.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Server Virtualization: Navy Network Operations Centers
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
S oftware Q uality A ssurance Part One Reviews and Inspections.
From Research Prototype to Production
Elements of Clinical Trial Quality Assurance Regulatory Coordinator –SCTR SUCCESS Center QA Monitor – NIDA Clinical Trials Network Stephanie Gentilin,
Software Configuration Management (SCM)
1 Configuration Management “The Cookbook Approach”
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Georgia Institute of Technology CS 4320 Fall 2003.
Software Configuration Management Lessons Learned Patrick Bong Safety Systems Group Stanford Linear Accelerator Center.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Software Engineering 2003 Jyrki Nummenmaa 1 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): -
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Software Engineering – University of Tampere, CS DepartmentJyrki Nummenmaa Configuration management.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Making the System Operational Implementation & Deployment
State of Georgia Release Management Training
Project management Topic 8 Configuration Management.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
Software and Systems Integration
Making the System Operational Implementation & Deployment
Engineering Processes
LCLS Personnel Protection System and Beam Containment System
DOE Review of the LCLS Project October 2006
Software Reviews.
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009

2 Enzo Carrone 2 NEH Safety Systems NEH ARR 2009 PPS and BCS Status Both systems are currently ready for safe operation to the FEE PPS successfully certified (IAT) on June 24-26; BCS components certified on June 26. Hutch systems HPS will be ready by the end of July.

3 Enzo Carrone 3 NEH Safety Systems NEH ARR 2009 Safety Systems Section PPS and BCS Systems combined into a single Section. Full-time QC Group Leader (M. Saleski). Manages Review Process. Oversees Engineering Change Order Process. Full-time Documentation Manager (S. Starner). Documentation system compliant to DOE Order 414.1C and ISO

4 Enzo Carrone 4 NEH Safety Systems NEH ARR 2009

5 Enzo Carrone 5 NEH Safety Systems NEH ARR 2009 Safety Systems Section Documentation Structure

6 Enzo Carrone 6 NEH Safety Systems NEH ARR 2009

7 Enzo Carrone 7 NEH Safety Systems NEH ARR 2009

8 Enzo Carrone 8 NEH Safety Systems NEH ARR 2009 Safety Systems QA Subject to a new Engineering Change Order (ECO) process Better tracking of requirements, specifications, reviews (peer and formal), and system documentation. New project QA approach Bench and pre-IAT field test of system software Acceptance tests performed for complex SLAC-built assemblies (such at stoppers) Cold and energized checkout of installed hardware Und Complex lessons learned with subcontractors Formal IAT reviews with stakeholders Overall, better management of schedule Indirectly affects quality

9 Enzo Carrone 9 NEH Safety Systems NEH ARR 2009 Documentation Control A single on line repository is available for all released documents. Formal Documentation Control is in place. Measures taken to regulate the Preparation, Change, Withdrawal, Review, Approval, Release, Distribution, Access, Availability, Storage, Disposal of documents. Document management Plan, Document Change Control Procedure, design Review Plan, Drawing Management Procedure, Engineering Change Order Procedure.

10 Enzo Carrone 10 NEH Safety Systems NEH ARR 2009 Configuration Control Elements Prevention of Unintended Change Physical Security of System Labeling Training Control of Intended Change Work Planning (adequate review of design) Work Authorization (RSWCF) Verification of Work (RSWCF) Periodic Confirmation of System Integrity Routine testing and inspections

11 Enzo Carrone 11 NEH Safety Systems NEH ARR 2009 Configuration Management Documentation Document Management Plan Document Change Control Procedure Document Change Order Design Review Plan Software Configuration Management Engineering Change Order Procedure Engineering Change Order Drawing Management Procedure

12 Enzo Carrone 12 NEH Safety Systems NEH ARR 2009 Software Configuration Management Support Software versions are checked during annual certification. Written procedures exist for extracting PPS code from CVS and for uploading it to PLCs. A documented training program tracks personnel PLC qualifications in the Section.

13 Enzo Carrone 13 NEH Safety Systems NEH ARR 2009 Software Configuration Management Procedure PPS Software is stored in a dedicated PPS repository. Released software always has “N.0.0” version tag. Documented software bench testing is performed prior to deployment.

14 Enzo Carrone 14 NEH Safety Systems NEH ARR 2009 Software Configuration Control Issues Program Security: All communication to the safety-critical PLCs is through TCP/IP to ‘buffer’ Allen-Bradley PLC, then via DeviceNet (serial data communication). Safety-critical program ‘smart card’ cannot be written to while in the PLC Communication from the safety-critical PLCs is through DeviceNet to ‘buffer’ Allen-Bradley PLC and output to control system via TCP/IP Network Access Security: Hardwire Enable from MCC required Only specific IP addresses are allowed to issue PPS commands Physical Access Security: PLCs and DeviceNet are inside locked racks.

15 Enzo Carrone 15 NEH Safety Systems NEH ARR 2009 Software Version Management Version Management: Software versions are checked during annual certification Written procedures Exist for extracting PPS code from CVS and uploading it to PLCs A documented training program tracks personnel PLC qualifications in the Section

16 Enzo Carrone 16 NEH Safety Systems NEH ARR 2009 Implementation, Operations, and Maintenance

17 Enzo Carrone 17 NEH Safety Systems NEH ARR 2009 Proposed PLC PPS ‘Dev and Rev’

18 Enzo Carrone 18 NEH Safety Systems NEH ARR 2009 Established SSS ECO Emphasis on review and development documentation; Enables a project management approach; Collects development and review docs for auditability.

19 Enzo Carrone 19 NEH Safety Systems NEH ARR FEE/NEH PPS Checkouts Cold Checkout Verifies Hardware and Cable Plant is installed and wired correctly Verifies No Ground Shorts in the Cable Plant EEIP Hardware and Racks Hot Checkout Verifies Functionality of Hardware, Devices, and PLCs Hi-Pot Cable Plant

20 Enzo Carrone 20 NEH Safety Systems NEH ARR Review Status Final Design Review #2 (April 22, 2009) Initial Acceptance Test Review (internal and external) Starting this week.

21 Enzo Carrone 21 NEH Safety Systems NEH ARR 2009 PPS Review Status for FEE & NEH Major Review to Date LCLS SCR: May 31 st 2007 [Bong, Stefan, Horton, Hastings] LCLS PDR: Feb 29 th 2008 [Lessard, Tompkins, Schmerge, Anthony] LCLS FDR: Oct 22 nd 2008 [Anthony, Mueller(LBNL), Lessard] RSC: Oct 31 st 2008 LCLS FDR2: Apr 22 nd 2009 [ Perry Anthony, Zoe Van Hoover, Luc Lessard, Paul Miller, Robert Mueller, Mike Woods]

22 Enzo Carrone 22 NEH Safety Systems NEH ARR PPS FEE Schedule

23 Enzo Carrone 23 NEH Safety Systems NEH ARR 2009 FEE/NEH Schedule

24 Enzo Carrone 24 NEH Safety Systems NEH ARR 2009 Conclusions PPS/BCS has a Quality Assurance model in place; LCLS management is aware of the Safety Systems process and supports it throughout the project lifecycle (from conception to certification); LCLS, Operations, Radiation Physics are heavily involved in all review phases from early on (from requirements/specifications to user manual).