TOB meeting, 20.9.2005 1 TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1ESAComp Users’ Meeting 2006 University of Applied Sciences of Northwestern Switzerland March 2–3, 2006 High-Precision Composite Support Structures for.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Installation of the T600 at Fermilab CSN2, September 22,
Atlas Tracker Thermal Management Workshop, , A. Onnela, CERN Experience from CMS tracker cooling: Tracker Outer Barrel (TOB) Antti Onnela TOB Project.
ICARUS Collaboration Meeting Dec A. Scaramelli.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
Installation of the T600 at Fermilab Fermilab, February 15,
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Installation of the T600 at Fermilab
MQXC Nb-Ti 120mm 120T/m 2m models
Service channels between Tracker and PP1
Service channels between Tracker and PP1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Tracker Outer Barrel COOLING Antti Onnela, CERN.
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Ideas and Plans on Tracker Module Mechanics Developments
IHEP Cryomodule Status
DET. Integration Inner detector envelope Radial clearances.
Cryomodule Assembly Plan
as a prototype for Super c-tau factory
Advantages and Challenges of this design Today status of the design
Presentation transcript:

TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n Inner (TIB/TID) Rails n MS- and DOHM-cable paths and lengths n Rod to Wheel assembly n Cooling manifolds and Service supports n To do

TOB Integration TOB meeting, TOB Wheel Geometry unchanged (within 0.15 mm) after rotation from the vertical to horizontal position and on to the final supports.

TOB Integration TOB meeting, TOB transport to building 186 Fork-lift was needed to be used in this transport - not really ideal. In 186 upstairs and downstairs we can use cranes – much better. Truck needed anyways. “Multi-layer” plastic protection was ok for this transport. But need to make better, and safer protection for the later transport to the new clean room, quite likely to be done with rods inside the wheel.

TOB Integration TOB meeting, TST-TOB integration test, July 2005 Installation tools work very well. Work platforms are to be improved (stability, height adjustment)

TOB Integration TOB meeting, TST-TOB integration test, July 2005 The TOB fits! … even if clearances reduced from nominal 10 mm to 2-3 mm at thermal screen connections. Further clearance losses must not happen.

TOB Integration TOB meeting, TST-TOB integration test, July 2005 A perfect match inside the TST!

TOB Integration TOB meeting, TST-TOB integration test, July 2005 Also the TIB installation works fine. The TIB and even the integration team fit!

TOB Integration TOB meeting, TST-TOB integration test, July 2005 Final TIB layer 4 backward + mock-up TID inside the TOB. Inner Rails function as required, clearances ok.

TOB Integration TOB meeting, Inner (TIB-TID) Rails The complete TIB-TID rails attached to the TOB … and measured Straightness of the rails within 0.2 mm! Congratulations to PH/DT2 team: J-L Loquet, et al. Complete Survey measurement report available in EDMS doc nr: Thanks are due to TS/SU team: J-D Maillefaud, et al.

TOB Integration TOB meeting, MS- and DOHM-cable paths and lengths Prepared by Christian Lönnqvist All data available in EDMS Document nr

TOB Integration TOB meeting, Rod to Wheel insertion Selecting the Rod. Helium leak test of the Rod cooling pipe and Connection of the optical ribbon Optical ribbon attached to installation fork.

TOB Integration TOB meeting, Rod to Wheel assembly Rod installation tool aligned with a “Pre-Rod” Rod attached to the installation tool at comfortable height and orientation. Installation tool supported from the Wheel

TOB Integration TOB meeting, Rod to Wheel assembly

TOB Integration TOB meeting, Rod to Wheel assembly Hybrid tail bent “à la FNAL” is ok ! Proposed change to this bending for all remaining modules. But this loose HV-wire is NOT ok! Must ensure that all wires firmly attached.

TOB Integration TOB meeting, Rod to Wheel assembly Attaching the split ribbon, shared by 2 Rods.

TOB Integration TOB meeting, Cooling manifolds and Service supports Service support, glued to the Wheel Cooling segment “2.6.2” Inlet and Outlet manifolds

TOB Integration TOB meeting, Cooling manifolds and Service supports Cooling connection pipes between Rods and manifolds.

TOB Integration TOB meeting, Alignment tube prototype Alignment tubes supplied by Aachen.

TOB Integration TOB meeting, To do (1/2) Test insertion and pipe soldering of a Double-Sided rod Accessibility, fume extraction, cleanliness, disconnecting the cooling pipes Complete preparation of lab 186 (upstairs) for the present integration work He, dry air, C6F14 lines He leak detector Assembly of the Cooling segment with its 19 FNAL “Pre-Rods” Pipe soldering Cabling Functional tests (power, ctrl, read-out) Development and testing of work platforms, tooling, etc. Get ready (by end of October) to start final Rod assembly Dismount pre-assembled Cooling segment 2.6.2, and re-assemble with final Rods Solve all unforeseen…

TOB Integration TOB meeting, To do (2/2) Production and testing of all cooling manifolds (88-2) All components available, except a set of T-connections currently in production Production and testing done at CERN Drawings ready Tooling ready Pipe bending, drilling, brazing, cleaning, He leak testing to be started asap Cable supports for the Wheel and for the Thermal Screen All components available Assembly work on-going Alodine treatment Prepare equipment for Wheel transport to downstairs 186 Cleanliness and safety