Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
How to do Business with the Regional Transportation Commission Disadvantaged Business Enterprise (DBE) Program RTC Outreach.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
Procurement Reform 2SHB 2452 Procurement for the State of Washington East Side Vendor Training June 20, 2012.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
New York State Department of Transportation
Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.
Bridge Engineering Section Bridge Rehabilitation.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Construction Notes Amer Bata, Area Construction Manager.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
B A Y A R E A T O L L A U T H O R I T Y 1 Toll Increase Recommendation for the State-owned Bay Area Bridges BATA Oversight Committee January 13, 2010.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
1 Regional Measure 2: Capital Program Update October 14, 2009 Programming and Allocations.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.
You passed the Bond or secured some funds What do we do now? 2014.
San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Capital Facilities Program Update San Rafael City Schools August 8, 2016.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Holly Street Bridge Retrofit and Rehabilitation Project
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
5th Street Bridge Replacement Project Contract No
Doing Business with Santa Clara Valley Transportation Authority (VTA)
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Asset Acquisition Process
Issaquah-Fall City Road
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Measure – V Facilities Update April 8th, 2019
Second Avenue Subway Project Execution Strategy
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Athletic Field Improvements
Presentation transcript:

Toll Bridge Seismic Retrofit Program Project Schedule and Budgets

Toll Bridge Seismic Program Project Schedules

Toll Bridge Seismic Retrofit Program Baseline AB 1171 (2001), AB 144 (2005) and Expenditures

Toll Bridge Seismic Retrofit Program 2005 Second Quarter Forecast (Baseline AB 144 )

SFOBB East Span Contracts 2005 Second Quarter Forecast (Baseline AB 144 )

San Francisco-Oakland Bay Bridge East Span Replacement Project Restart of E2/T1 Foundation Contract

Re-Start SFOBB East Span E2/T1 Contract Options Option A: Re-start KFM Contract Option B: Terminate and re-bid with SAS Recommendation Process and schedule

Option A: Re-Start E2/T1 Pro Minimizes uncertainty for SAS contract bidders with regard to the E2/T1 marine foundation contract. Provides the shortest schedule to project completion. Avoids loss of substantial engineering completed by the existing marine foundation contractor. Avoids loss of the fabricated marine foundation steel to date. Opportunity to incorporate the revised marine foundation contract schedule by addendum into the SAS bid documents. Allows the Department to conduct outreaches with industry during SAS contract advertisement. Provides the Department time to consider any contract improvements suggested by industry. Projected to be the most cost effective option.

Option A: Re-Start E2/T1 Con A substantial portion of the E2/T1 contract terms will be subject to cost negotiation. Changes to the original E2/T1 contract will result in higher costs than the original bid. The analysis of the schedule and costs impacts may take three to six months to resolve. The Department could, by nature of the contract terms being re-negotiated, absorb a substantial portion of the future construction cost risks on the E2/T1 contract.

Recommendation Re-start E2/T1 with Contract Change Order

E2/T1 Contract Restart Process and Schedule Approval from TBPOC to Re-start:7/22/05 Contractor initiate critical construction activity:8/1/05 Re-start Notice to Contractor: 7/22/05 Request Cost and Schedule from KFM: 8/2/05 KFM Prepare Cost & Schedule Impacts:8/2/05 KFM Submit Cost & Schedule Impacts:9/1/05 Caltrans Review of Cost & Schedule Impacts: 9/1/05 Caltrans/KFM Meeting: 9/19/05 KFM to Provide Additional Information:9/19/05 Final Negotiations:10/4/05 – 11/4/05 Process CCO:10/4/05 Caltrans Draft Contract Settlement Report (CSR):9/19/05 Final CSR Draft to HQ:10/4/05 HQ Approval of CSR:10/20/05 – 11/4/05

SAS Re-Bid Status of De-Federalization GOAR Current Bid Documents Current Status Recommendations Pre-bid Recommendations Post-bid Bid Process and Schedule DVBE Goal

Current Bid Documents Incorporated all addendums De-Federalize No Buy America Requirement No DBE Goal Requires DVBE Goal Milestone and schedule update Technical specs change

Recommendations Pre-Advertisement Increase stipend from $1 million to $3 million. Reevaluate current DVBE Goal of 3 percent. Increase the advertisement period from 4 months to 6 months. Modify Cost Reduction Incentive Program (CRIP) saving sharing from 50/50 to 60 contractor/40 owner. Modify Material On-hand (MOH) bond requirements to apply only to materials stored outside U.S. Include identified minor specification improvements..

Recommendations Post-Advertisement MTC to seek Jones Act exemption for the project limits/area. Review and implement technical changes. Analyze use of steel price index specification. Monthly Addendum response to Bidder Inquiry schedule. Continuous response to Bidder Inquiry questions via web site. Business Outreach (August 31, 2005). Technical Outreach (September 23, 2005)

SAS Bid Process and Schedule TBPOC Approval of SAS Recommendation 7/22/05 Incorporate changes to specs by 7/26/05. BATA approval of Bid Document 7/27/05 Print Specifications (Plans already printed) 7/27/05. List contract on DGS website 7/27/05. Advertise SAS contract 7/28/05. Post contract on Caltrans website 7/28/05. Outreaches on 8/31/05 and 9/23/05. Open bids (6 months advertisement) 1/28/06. Award (60-day award period) 3/28/05. First working day 4/28/05.

Toll Bridge Seismic Retrofit Program Schedule

Seismic Retrofit Contract 1 Interim Retrofit Pile Installation Midden I Oakland Geofill USCG Road Relocation SAS Land Foundation W2 YBI Electrical Substation Completed: Skyway (75%) South/South Detour (26%) SAS Marine Foundation E2/T1 (20%) Projects in Construction YBI Transition Structure Oakland Touchdown Stormwater Treatment Measures (BMP) Existing Bridge Demolition Projects in Design Connector Span (SAS) Pending SFOBB East Span (16 Contracts)

SFOBB East Span Corridor Schedule SAS Advertise 08/01/05

Second Quarterly Toll Bridge Seismic Retrofit Report Project/Bridge Status Project Budgets Responsibility for Preparation

Responsibility for Preparation of Future Reports