/10 FIRELEC Migration Solution This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

Legacy Hardware and Software Upgrade Overview
Cisco 6500 E-Series Chassis Up-grade
SEE System Design Product Presentation The Computer-Aided Design Specialist dedicated to Electrical Engineering, Systems and Industrial Fluids.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
Training Course on the WJ-HD300A Series DVR Hard Drive Replacement Procedure WJ-HD300A Series DVR.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
SY/Max to Quantum Quick Wiring Adapter (QWA) Frank Prendergast Schneider Electric – Industry System Architect
MXL to FireFinder XLS Total Migration Solution
ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting.
Termination Boards Dynamic Positioning Cabinet. Termination Boards Overview The termination Boards provides the connections between the field and the.
SY/Max to Quantum Quick Wiring Adapter (QWA) Frank Prendergast Industrial Solution Center Business Development Manager for Services
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
Passage Three Storage Devices. Training target: In this part , you should try your best to form good reading habits. In order to avoid your ill habits.
CCTV SMART CABLING Twisted Pair Transmission System
Microchip’s Academic Program. 2 Our Mission “Facilitate the integration of Microchip products and technologies into the classroom”
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
1 (1D Scanner) Trouble Shooting Guide Version 1.0 ©2012.
I T Essentials I Chapter 3 JEOPARDY.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
Wrocław University of Technology, Faculty of Fundamental Problems of Technology. 1.
Ch Review1 Review Chapter Microcomputer Systems Hardware, Software, and the Operating System.
USB DAQ Product USB DAQ Product Κώστας Γρηγορίου Sales Engineer Ιούνιος 26, 2007.
Basic LAN techniques IN common with all other computer based systems networks require both HARDWARE and SOFTWARE to function. Networks are often explained.
Organization of cabling information Creating a Medaustron Cable Database 1 That’s what we don’t want!! MACS 28/06/2011 Sebastien Pelletier Cabling Database.
EXAMPLE 4 Write series using summation notation
Asis AdvancedTCA Class Front blades and RTM FRU stand for Field Replaceable Unit, front blade is a third party blade (must be ATCA compliant), that the.
ADT490 TroubleShooting Locating Opens. 2 Power Supply Grounding Power Supply has circuit -> allows positive & negative outputs to float relative to ground.
ISD-MASP-S05026 Copyright © Yokogawa Electric Corporation May 2005 Page 1 Honeywell PKS R300 -System quick review June 2005 (Rev. 2) SAMURAI Activities,
GS3055-I Installation Process
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Chiller control system Lukasz Zwalinski – PH/DT.
Serial Transmission System Series EX510 BackgroundFeaturesTechnical detailsApplications.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
CLARITY MATRIX FIBER VIDEO EXTENSION October 2015.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Unit 4, Lesson 10 Field Replaceable Units (FRUs) AOIT Computer Systems Copyright © 2008–2013 National Academy Foundation. All rights reserved.
Field Replaceable Units, Common Problems, and Flowcharts.
© Aeroflex Ltd 2013 The copyright in this document is the property of Aeroflex Ltd and is supplied on the express terms that it is treated as confidential.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
RS3-FIM series Migration Don't let wiring costs prevent you from upgrading an RS3 FIM series system to a DeltaV system This document is the property of.
Date: File:TrainingUnits.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation 培训设备 V.
Enterprises systems : Enterprise Wireless Network Solution Provider
Get Electrical Services for Home & Business in Thornleigh
Find the Reliable Electrical Services in Macquarie Park
The products of this company are quite reasonable as well as durable. One such is used by me these days and it has a long lasting battery, clear picture.
The fibre journey for fibre-to-the-cabinet (FTTC) solutions
X-Spot Lamp Socket Replacement Procedure
Computer and Information Technology for HKCEE
FIRELEC Migration Solution
Learn To Resolve The Startup Issue In Lenovo Laptop
Programmable Logic Controllers (PLCs) An Overview.
FIRELEC Migration Solution
FIRELEC Migration Solution
FIRELEC Migration Solution
FIRELEC Migration Solution
PLC Hardware Components.
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
IRC5C second generation Overview
FIRELEC Migration Solution
FIRELEC Migration Solution
FIRELEC Migration Solution
How To Send Online Assessments
Presentation transcript:

/10 FIRELEC Migration Solution This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 1 Don't let wiring costs prevent you from upgrading an ABB « Fischer and Porter System 6 » to a DeltaV TM system

/10 The ITB Migration Adapters (ADP-ITB) allow to connect easily, existing Fischer and Porter System 6 FTAs to DeltaV I/O cards keeping in place : the existing I/O panels (ITBs) the existing associated I/O cables the existing loop power supplies connected on the FTAs Fischer and Porter System 6 > DeltaV Using ADP-ITB (Migration Adapters) This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 2 New DeltaV System ITB and cable to be kept I/O Board (IOB) to be removed No impact on the field wiring No need for loop check FMS-DCI6-DV-1

/10 Existing 19 inches rack, IOBs, power supplies and communication cards to be removed Existing architecture This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 3 Process I/Os Existing ITBs (DI,DO) Existing ITBs (AI,AO) CNRTL & I/O Rack 19 inches Height : 10U Existing cable tray 19 inches, Height : 1U ITBs and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays FMS-DCI6-DV-1

/10 ITBs and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 4 New architecture for A.loop or P.loop replacement BC11007 with ADPs Rack 19 inches Height : 3U Process I/Os Existing ITBs (DI,DO) Existing ITBs (AI,AO) Existing cable tray 19 inches, Height : 1U FMS-DCI6-DV-1

/10 New architecture for D.loop or D.Output replacement This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 5 2 x BC11007 with ADPs Rack 19 inches Height : 2 x 3U = 6U ITBs and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays Process I/Os Existing ITBs (DI,DO) Existing cable tray 19 inches, Height : 1U Lower connector Upper connector FMS-DCI6-DV-1

/10 New architecture for A.Input or A.Output replacement This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 6 Existing cable tray 19 inches, Height : 1U 2 x BC11007 with ADPs Rack 19 inches Height : 2 x 3U = 6U ITBs and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays Process I/Os Existing ITBs (AI,AO) Lower connector Upper connector FMS-DCI6-DV-1

/10 New DeltaV architecture This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 7 The new DeltaV controllers and I/O cards (M or S series) are installed The I/O files BC11007 are installed in place of the existing Fischer and Porter System 6 Files where the IOBs were previously installed The ADP-ITBs are installed in the new files BC11007 Secondary DeltaV Area Control Network Cntrl PS I/O1 I/O2 I/O3 I/O4 I/O5 I/O6I/O7 I/O8 Primary DeltaV Area Control Network Cntrl PS I/O9 I/10 I/11 I/12 I/13 I/14I/15 I/16 Existing ITBs (DI,DO) Existing ITBs (AI,AO) AI AO DI DO The new FIRELEC I/O cables are installed between ADP-ITBs and new DeltaV I/O cards (M or S series) FMS-DCI6-DV-1

/10 This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 8 Compatibility table IOB (Input/Output Board) : The board which is to be removed FTA (Field Termination Assembly) : The I/O panel where the I/Os are connected, and which is kept Firelec Adapter : The migration adapter to be installed in BC11007 (new I/O file) to perform I/O migration and process signal spliting toward the DeltaV system I/O cards. FMS-DCI6-DV-1

/10 Advantages This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 9 The main advantages of the FMS-DCI6-DV-1 (ADP-ITBs) for Fischer and Porter System 6 migration are as follow : Existing I/O cables are just disconnected from the Fischer and Porter System 6 I/O boards and reconnected to the ADP-ITBs keeping in place the FTAs and associated I/O cables The existing loop drawings are kept without any modification, allowing all maintenance processes and procedures to remain unchanged. FMS-DCI6-DV-1

/10 Contacts This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third party without the prior written authorization of FIRELEC 10 For more information and support : Roel C.Mulder Director System Migration & Modernization Europe Phone : +31(0) Wilfrid DUPAS Sales Director Phone : +33 (0) FMS-DCI6-DV-1