STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.

Slides:



Advertisements
Similar presentations
Bill Christie For the STAR Collaboration MARCH 24,
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Measurements of  Production and Nuclear Modification Factor at STAR Anthony Kesich University of California, Davis STAR Collaboration.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Cold Nuclear Matter effects at RHIC Latest results (run 2008) Frédéric Fleuret - LLR1/18.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Draft Report of the RHIC Planning Group T. Ludlam Open Meeting on RHIC Planning Dec. 3-4, 2003.
1 The PHENIX Experiment in the RHIC Run 7 Martin L. Purschke, Brookhaven National Laboratory for the PHENIX Collaboration RHIC from space Long Island,
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
10/15/2007Dunlop, Welcome and Overview, Analysis Meeting Analysis Meeting 2007: Welcome and Overview James Dunlop Brookhaven National Laboratory.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
 Production and Suppression in Heavy Ion Collisions at STAR Anthony Kesich University of California, Davis STAR Collaboration February 5, 2013.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Nu Xu1/20STAR Regional Meeting, VECC, India, November, 2008 STAR Experiment STAR at RHIC Nu Xu Lawrence Berkeley National Laboratory.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
BUP Discussion Input John Koster, Sasha Bazilevsky, Itaru Nakagawa Spin PWG 2013/04/03 1.
Non-Prompt J/ψ Measurements at STAR Zaochen Ye for the STAR Collaboration University of Illinois at Chicago The STAR Collaboration:
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Heavy Ion Physics in RUN14-16
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016

Run 16 Heavy-Flavor Program

Run 16 BUR by STAR RunEnergyDurationSystemGoalsprioritySequence 16  s NN =200 GeV  s NN =62 GeV  s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au  c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 1.5B MB (1B w/ HFT) 100M MB

HFT operation mode in run16 Limitation of options in operation mode <55KHz to reduce deadtime and LU rate Store length for optimized luminosity Perform dynamic beta* squeeze Projection from this mode: 1.8nb -1 /week delivered for MTD and 2 billion MB for HFT requires 13 weeks of operation run14 Run16 projection RHIC Machine Efficiency not Luminosity, STAR Operation and Optimization Are keys to achieve this goal.

Run BUR by STAR RunEnergyDurationSystemGoalsprioritySequence 16  s NN =200 GeV  s NN =62 GeV  s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au  c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 1.5B MB (1B w/ HFT) 100M MB In each scenario, the data requirements for STAR’s two top priority scientific goals will be met. In no scenario can all the data needs for all programs be met in runs 16 and  s NN =510 GeV  s NN = 14.5  s NN = 19.6  s NN = 39.0  s = wk 1-wk 1-wk 1-wk 1-wk Transverse p+p d+Au d+Au d+Au p+p A N of W ±, , Drell-Yan, L=400 pb -1, 55% pol 80M MB 100M MB 400M MB 400M MB

Run 16 proposed by STAR (20 Cryo-weeks) RunEnergyDurationSystemGoalsprioritySequence 16  s NN =200 GeV  s NN =19.6 GeV  s NN =39 GeV 13-wk 1-wk Au+Au d+Au d+Au  c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 100M MB 400M MB RHIC Machine Efficiency not Luminosity, STAR Operation and Optimization Are keys to achieve this goal.