STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016
Run 16 Heavy-Flavor Program
Run 16 BUR by STAR RunEnergyDurationSystemGoalsprioritySequence 16 s NN =200 GeV s NN =62 GeV s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 1.5B MB (1B w/ HFT) 100M MB
HFT operation mode in run16 Limitation of options in operation mode <55KHz to reduce deadtime and LU rate Store length for optimized luminosity Perform dynamic beta* squeeze Projection from this mode: 1.8nb -1 /week delivered for MTD and 2 billion MB for HFT requires 13 weeks of operation run14 Run16 projection RHIC Machine Efficiency not Luminosity, STAR Operation and Optimization Are keys to achieve this goal.
Run BUR by STAR RunEnergyDurationSystemGoalsprioritySequence 16 s NN =200 GeV s NN =62 GeV s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 1.5B MB (1B w/ HFT) 100M MB In each scenario, the data requirements for STAR’s two top priority scientific goals will be met. In no scenario can all the data needs for all programs be met in runs 16 and s NN =510 GeV s NN = 14.5 s NN = 19.6 s NN = 39.0 s = wk 1-wk 1-wk 1-wk 1-wk Transverse p+p d+Au d+Au d+Au p+p A N of W ±, , Drell-Yan, L=400 pb -1, 55% pol 80M MB 100M MB 400M MB 400M MB
Run 16 proposed by STAR (20 Cryo-weeks) RunEnergyDurationSystemGoalsprioritySequence 16 s NN =200 GeV s NN =19.6 GeV s NN =39 GeV 13-wk 1-wk Au+Au d+Au d+Au c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 100M MB 400M MB RHIC Machine Efficiency not Luminosity, STAR Operation and Optimization Are keys to achieve this goal.