Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.

Slides:



Advertisements
Similar presentations
MIPAS Quality assessment of ENVISAT Atmospheric mission: implication for the scientific user community The monthly reports for each instrument.
Advertisements

RA-2 & MWR QWG meeting – ESA/ESRIN – 24 March, 2003 Envisat RA-2 and MWR Events since October 2002 Pierre Féménias ESA/ESRIN.
RA-2 & MWR CCVT – ESA/ESRIN – 25 to 27 March, 2003 MWR Calibration & Validation status MWR Cal/Val team: Ngan Tran, Estelle Obligis, Laurence Eymard, Michel.
3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.
Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 BOUSSOLE David ANTOINE CNRS-LOV, France now at: Curtin University,
CEOS-CGMS Working Group Climate, Darmstadt, Germany, 5-7 March 2014 Coordination Group for Meteorological Satellites - CGMS COORDINATION GROUP FOR METEOROLOGICAL.
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
Page 1 SCIAMACHY Pointing Meeting Bremen – 30 November 2006 MIPAS Pointing Error Status Gaétan Perron ABB Bomem Inc.
Slide 1 Atmospheric Chemistry User Workshop, 20th & 21st January 2004, ESTEC EUMETSAT Satellite Application Facility on Ozone Monitoring
Report from the 2 nd ACVE Workshop Frascati, Italy, 3-7 May 2004 Yasmine Calisesi International Space Science Institute.
Xin Kong, Lizzie Noyes, Gary Corlett, John Remedios, Simon Good and David Llewellyn-Jones Earth Observation Science, Space Research Centre, University.
KNMI, The Netherlands * SCIAMACHY validation workshop, Bremen, 6 Dec ‘04 Large scale validation of SCIAMACHY nadir reflectance Gijs van.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Page 1ENVISAT Cal/Val Workshop – ESRIN – 9/13 December 2002 ASAR On-board Instrument  Instrument Stability and Status  Instrument Adjustments  Tracking.
The ENVISAT-ESA Atmospheric-Chemistry dataset: operational data availability and re-processing status F. Niro (1), G. Brizzi (1), A. Dehn (1), L. Saavedra.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
OSTST, Hobart, March Future altimeter systems : is mesoscale observability guaranteed for operational oceanography? Future altimeter systems.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Generic Instrument Processing Facility Interface Specifications A. BuongiornoFrascati 12 /10/2012 ESA EOP-GS 1.
1 Some in situ data matters considered by AOPC From the Progress Report: “Developed Countries have improved many of their climate observation capabilities,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
Page 1 Validation Workshop, , IfE Bremen, G. Lichtenberg:Calibration status National Institute for Space Research SCIAMACHY Calibration status November.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
The Satellite Meteorology Centre  The Satellite Meteorology Centre (Centre de Météorologie “Spatiale” : CMS) is established at Lannion in the Côtes d'Armor.
S5P Ozone Profile (including Troposphere) verification: RAL Algorithm R.Siddans, G.Miles, B.Latter S5P Verification Workshop, MPIC, Mainz th May.
CERES on Terra & Aqua validation and participation in SCALES Z. Peter Szewczyk G. Louis Smith The GIST 19, RAL 08/27-29, 2003.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
CAPACITY Composition of the Atmosphere: Progress to Applications in the user CommunITY STUDY OVERVIEW AND LOGIC Michiel van Weele, KNMI Kick Off/ Negotiation.
Update on NASA’s Sensor Web Experiments Using Simulated Doppler Wind Lidar Data S. Wood, D. Emmitt, S. Greco Simpson Weather Associates, Inc. Working Group.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Validation by Model Assimilation/Satellite Intercomparison - ESRIN 9–13 December 2002 Expected Validation of Envisat Ozone Data E. Hilsenrath NASA Goddard.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
EARTH OBSERVATION PROGRAMME
Implementation and Processing outline Processing Framework of VIIRS instrument monitoring System Processing Framework of VIIRS EV data Monitoring SD/SDSM.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
1 Atmospheric Radiation – Lecture 17 PHY Lecture 17 Satellite instruments and missions.
Page 1 Validation Workshop, 9-13 th December 2002, ESRIN ENVISAT Validation Workshop AATSR Report Marianne Edwards Space Research Centre Department of.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
HDF and HDF-EOS Workshop November 30, 2006 The Homogenization and Reporting of Groundbased Atmospheric Datasets for the Validation.
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
Evolution of the JPSS Ground Project Calibration and Validation System Patrick Purcell, Gyanesh Chander and Peyush Jain JPSS Ground Project NASA, GSFC.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
US-Europe Data Exchange Meeting May Page 1 EUMETSAT Status Report Simon Elliott EUMETSAT Operations Department
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 Status of SQWG activities H. Bovensmann, G. Lichtenberg, R. Snel, C. Lerot,
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Non-Meteorological Application for Himawari-8 Presented.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
June, GSICS USER GUIDE Using GSICS Products and Services Manik Bali, Tim Hewison, Larry Flynn and Jerome Lafeuille 2016 GSICS Executive Panel Meeting.
GOMOS Mission and Processing Status On 22nd March 2003 GOMOS suffered the anomaly ‘Azimuth Voice coil command saturation”. The anomaly occurred during.
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Dehn(1), F. Niro(1), A. von Bargen(2), T. Fehr(3)
Overview of the AATSR Validation Programme
Dorothee Coppens.
SCIAMACHY Processors Development
GLAST Large Area Telescope:
Presentation transcript:

Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra de Miguel Roberta Mantovani Presented by Paul Snoeij

Sciavalig – 6-8/12/2004 Overview FSCIAMACHY FCalibration Data Processing Status FOperational NRT Data Processing Status FOff-Line Data Processor Status FFull-Mission Data Processing Status FValidation Data Processing Status FData Dissemination FMIPAS FGOMOS FACVT Long Term Validation

Sciavalig – 6-8/12/2004 Calibration Data Processing Status 2002,2003, 2004 recalibration completed 2004 forward calibration with IECF operational since 8 May 2004 Important improvements to calibration are part of the current processor improvement cycle. For recalibration, a dedicated chain is under development Recalibration will also involve use of a restituted attitude file to correct mispointing

Sciavalig – 6-8/12/2004 Operational NRT Data Processing Data Processor –IPF 5.04 : bug-fixed version of 5.01, sharing exactly the same Algorithm Specification (DPM L1-2C/L2-2A, IODD L1-5A/L2-3C, Product Specification 3H). Processor Configuration –Key Data Nadir 3.0, Limb 2.4 Products from the Infra-Red channels are part of the current Level 1B improvement cycle (baseline specification nearly completed)

Sciavalig – 6-8/12/2004 Off-Line Data Processor Status Current Processor version 2.5 IODD 4E (November 2004), Product Specification Document 3J (December 2004) Integration has begun after above delivery Target date for operations: Important improvements to level 2 off-line processing are part of the current Level 2 improvement cycle (baseline specification nearly completed)

Sciavalig – 6-8/12/ st Full-Mission Data Processing Percentage per cycle, of available data processed

Sciavalig – 6-8/12/2004 Data dissemination Dissemination of level 1 and level 2 via nominal channels –NRT Kiruna: ftp-ops.pdk.envisat.esa.int –NRT Esrin: ftp-ops.pde.envisat.esa.int –(Reprocessed) Off-line: ftp-ops.de.envisat.esa.int –U/P: scia2usr / scia2usr

Sciavalig – 6-8/12/2004 MIPAS Space Segment Status Nominal MIPAS operations have ceased in March 2004 A team involving ESA, Instrument Prime, and Expert Support has been formed. The team defined dedicated investigations. Numerous tests have been executed between March and November, including pre-operational modes. No anomaly-free operations mode has been found thus far, but several modes involve low risk to the instrument. An Anomaly Review Board meeting is held on 7 December to review the future operations scenario. Generalisations to the data processor are currently being implemented to allow processing of the various modes

Sciavalig – 6-8/12/2004 GOMOS Space Segment Status The instrument generally operates reliably, since the operations have been transferred to the redundant electronics on 17 July 2003 The CCD detector performance sensitivity to radiation impact has remained stable. The leakage current trend has remained stable. All other subsystems (in particular tracker) show performance that meets and exceeds requirements

Sciavalig – 6-8/12/2004 Status of the Envisat Atmospheric Chemistry Validation SCIAVALIG 6–8 December 2004 Paul Snoeij European Space Agency Earth Observation Programmes

Sciavalig – 6-8/12/2004 ACVT Long term validation Fill in the gaps not covered during the main validation phase. To monitor performance degradation. Regular, optimised, repetition of the essential elements of the main validation. The long-term validation has to be continued during the lifetime of the instruments.

Sciavalig – 6-8/12/2004 Long term validation sources Long term validation is performed by using –ground-based instruments -> TASTE & EQUAL –airborne / balloon instruments -> ESABC –satellite instruments -> Univ. of Bremen A set of ‘standard’ stations and campaigns have been defined to monitor the operational product quality. Apart from the ‘standard’ set, also well- defined measurement campaigns are defined.

Sciavalig – 6-8/12/2004 ACVT Long term validation schedule

Sciavalig – 6-8/12/2004 ESABC-2004 Schedule

Sciavalig – 6-8/12/2004