Status of Next Generation Uplink Green Book and Next Steps Greg Kazz Ed Greenberg NASA/JPL Oct. 15, 2012.

Slides:



Advertisements
Similar presentations
PRACTICE ENGINE Best Practices with Data Capture.
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
SDLS impact on TM, AOS, TC Space Data Link Protocols Greg Kazz NASA/JPL Oct 16/17, 2012.
GVCID parameter for Encapsulation - V2 - Oct2009 Encapsulation Service: Specifying the channel in the underlying Space Data Link Protocol Version 2/3 (Last.
A General Purpose CCSDS Link layer Protocol Next Generation Data Link Protocol (NGDLP) Ed Greenberg Greg Kazz 10/17/
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
FIGURES FOR CHAPTER 1 INTRODUCTION NUMBER SYSTEMS AND CONVERSION
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
1 Fall Technical Meeting, Bordeaux (BOD) 4/15-18/2013 SLS-CS_13-03 Separating Coding from Framing V. Sank, H. Garon - NASA/GSFC/MEI W. Fong, W.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
Unified Frame Format Next Generation Data SpaceLink Protocol (NGSLP) Ed Greenberg Greg Kazz 2/20/
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
Next Generation Space Link Protocol – Raison d’etre Greg Kazz Ed Greenberg SLS-SLP WG Fall 2013 CCSDS Meeting - San Antonio, TX, USA.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
CCSDS Unified Space Data Link (USLP)
1 Authentication Algorithm Document Discussions CCSDS Security Working Group Fall 2007 Meeting 3-5 October 2007 ESA/ESOC, Darmstadt Germany (Hotel am Bruchsee,
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
March 7, 2008Security Proposal 1 CCSDS Link Security Proposal Ed Greenberg Greg Kazz Howard Weiss March 7, 2008.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
Proposal for a TC-2 Protocol Ed Greenberg Greg Kazz Oct /27/20151.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
1 Jet Propulsion Laboratory California Institute of Technology Short Uplink LDPC Codes: Proposed Methods for CLTU Acquisition and Termination Kenneth Andrews.
Chapter 3 Memos.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
SLS-CS_12-05 Some results on NGU coding schemes
MSD Total Supplier Performance and Inventory Control
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Proposal for a Proximity-2 Protocol Ed Greenberg Greg Kazz May /11/20161.
2015 ANIMATION SOFTWARE INDUSTRY REPORT - GLOBAL AND CHINESE MARKET Number of Pages Publish Date – Jan 2015.
2015 STRUCTURED DATA MANAGEMENT SOFTWARE INDUSTRY REPORT -GLOBAL AND CHINESE MARKET Number of Pages Publish Date – Jan 2015.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
A SCIENTIFIC PAPER INCLUDES: Introduction: What question was studied and why? Methods: How was the problem studied? Results: What were the findings? and.
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
2015 HIGH-AVAILABILITY CLUSTERING SOFTWARE INDUSTRY REPORT -GLOBAL AND CHINESE MARKET Number of Pages Publish Date – Jan 2015.
1 Nov. 9, 2015 CSTS Forward Frame Service Work Plan T. Pham Nov. 9, 2015.
Why we need USLP Greg Kazz Ed Greenberg November 9-10, 2014 CCSDS Fall London Question: Why the change of name from NGSLP to USLP? Answer: 1) In time the.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
CCSDS Telecommand Sync and Channel Coding Specification using advanced Block Codes Ed Greenberg NASA/JPL Oct. 15,
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Forging new generations of engineers. Writing a Technical Report JUST THE FACTS!
Next Generation Uplink Options already within our Grasp Greg Kazz Ed Greenberg NASA/JPL May 16, 2011 Spring 2011 CCSDS - Berlin.
Next Generation Uplink Options already within our Grasp
Why we need USLP Greg Kazz Ed Greenberg November 9-10, 2014
SLS-CS_12-05 Some results on NGU coding schemes
Short Uplink LDPC Codes: Proposed Methods
SLS-CS_13-03 Separating Coding from Framing
Next Generation Space Link Protocol – Raison d’etre
SLS AREA REPORT Goal: Next Generation Uplink WG
Ed Greenberg Greg Kazz 10/17/2012
Chapter 8 – Energy balances
Presentation transcript:

Status of Next Generation Uplink Green Book and Next Steps Greg Kazz Ed Greenberg NASA/JPL Oct. 15, 2012

Current NGU Table of Contents 1)Introduction – Purpose & Scope, Applicability, Rational, References 2)Comparison between Current TC and NGU approaches – Current Uplink Architecture, Recent Advances – Key Trade-offs Selection of code(s) for NGU Selection of sync word for NGU CLTU Selection of termination method for NGU CLTU 3)Uplink Coding for the new TC standard – Application and Figures of Merit 4)Four Major Application Profiles 5)Coding Trade Studies 6)Randomization (BCH vs LDPC) 10/15/12Fall CCSDS Meeting - Cleveland 20122

DLR Material Since the Darmstadt meeting, the high level performance data of DLR non-binary LDPC codes was added to the NGU GB 10/15/12Fall CCSDS Meeting - Cleveland 20123

Proposals Option 1: Keep the NGU GB as is with all of this information into this one Green Book Option 2: Separate out the content of the NGU GB into two separate green books – One overall Top Level System Engineering Concepts and Concerns becomes the NGU GB – Detailed Coding material becomes a new NGU Uplink Coding GB containing: Short length binary JPL LDPC codes Short Length non-binary DLR LDPC codes Short Length non-binary JPL LDPC codes 10/15/12Fall CCSDS Meeting - Cleveland 20124