1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
ESS Pre- Operations Dave McGinnis Accelerator Division/RF Group.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
From Research Prototype to Production
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
AGS RSVP Weekly Meeting P. Pile 5 May 2005 AGS RSVP Weekly Meeting 5 May 2005 Useful Links: RSVP Project : C-AD.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
F Project X Overview Dave McGinnis October 12, 2007.
Operational Demands of ReA3 at NSCL “Adapting to Change” WAO 2012, Stanford University Jon Bonofiglio August, 7 th, 2012.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance Jan 2005 WBS 1.4.5, AGS Project Office (and WBS Beam Development)
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 AGS RSVP Review 4-5 November 2004 AGS RSVP Upgrades - Overview Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 RSVP Cost and Schedule Review 9 December 2004 AGS Upgrades Philip Pile WBS 1.4 Project Manager.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
More beam (muons) from the AGS AGS RHIC Users Group Meeting EDM Workshop Brookhaven National Laboratory 7 June 2006 Phil Pile.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
MMT Retreat Technical Services across ESS Peter Rådahl
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
Making Difficult Decisions in a Transparent Way –
Failure analysis at BEPCII
CLIC Civil Engineering Update
The Fermi National Accelerator Laboratory is a U. S
LINAC OPS Budget Review
MEIC Cost Estimate Overview
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004

2 Outline RSVP Construction costs - Recap RSVP operations cost oBasis oBeam development costs during RSVP construction period oOperations cost – post-construction Final Comments Upgrade and Operations Cost & Schedule Summary

3 RSVP AGS Project Costs, with indirects 11/2/04 – version 20 TO BE UPDATED

4 AGS/Booster Direct Cost Summary 11/2/04

5 Switchyard Direct Cost Summary 11/2/04

6 K0PI0 Direct Cost Summary 11/2/04

7 MECO Direct Cost Summary 11/2/04

8 General Considerations The costs to operate (as with construction) the RSVP experiments are calculated incremental to the costs of RHIC operations AGS fixed target operations costs are based on past experience with HEP and NP experiments as well as NASA, NNSA and BES experiments This incremental and cost sharing model had been the case at the AGS, for the period of , between HEP and NP during the pre-RHIC and into the RHIC era Operations Cost Basis

9 RSVP Specific Considerations - schedule AGS slow extracted beam (SEB) operations for RSVP will run concurrent with RHIC collider operations when possible  Running concurrent with RHIC operations will require base personnel (12 FTE’s plus 4-6 experiment specific FTE’s) support for the AGS fixed target operation  Without base support short runs are costed on a per hour basis for personnel and materials and scheduled outside of RHIC operations oSuch runs are considered on a case-by-case basis and are carried out only if the impact on RHIC shutdown work is acceptable During RHIC injection all other machine operations will cease, so as to allow full attention to this process. Operations Cost Basis

10 RSVP Specific Considerations – energy use and materials Power costs are billed on an actual use basis  RHIC pp operations covers first 7 MW  RHIC HI Operations covers first 5 MW Materials are billed according to previously established average costs  M&S, DTS and special procurement for AGS/Experiment concurrent with RHIC operations is charged incremental to RHIC  M&S, DTS and special procurement for RSVP operation outside of RHIC operations is fully charged (no RHIC help). Only shift differential (15%), however, is charged for accelerator machine operations staff Operations Cost Basis

11 RSVP Specific Considerations - Personnel Since the RHIC program does not support any manpower for AGS experiments all experimental area manpower support will be billed to the NSF consisting of:  a base manpower level that supports the extraction system, switchyard transport, primary proton transport and the primary target area (common to both RSVP experiments)  Incremental manpower for each experiment RSVP manpower is matrixed into the Collider-Accelerator Department staff  Main control room operations is sufficient to cover SEB operations during RHIC collision operations except for an incremental effort to support the SEB extraction system  RSVP support personnel will come from the present C-AD staff together with new hires  C-AD RSVP support personnel will retain RHIC responsibilities at a reduced level  When a conflict between RHIC and RSVP support arises, RHIC support will win in all cases that could impact RHIC operations Operations Cost Basis

12 RSVP Support Personnel The base manpower estimate is comprised of the following: FTE Physicist1 Engineering (mechanical, electrical)1 Controls0.5 Instrumentation1 Vacuum systems0.5 Magnet systems1.5 Power supplies1.5 Utilities (power, water, AC)2 Extraction systems1 ES&H, QA, Admin, training (org. burden) 0 Shift operations2 Total12 K0PI0 manpower support Physicist, engineering1 RF systems (microbunch)1 Technicians (inst., vacuum, magnet etc.)2 Total4 MECO manpower support Physicist, engineering1 Cryogenic engineering, technicians3 Technicians (insert., vacuum, magnet etc.)2 Total6

13 Beam Development (pre-ops) vs Operations Cost Pre-ops costs for materials support for SEB and experimental areas assumed 50% of cost for full operations Power costs assume C-line used for pre-operations Personnel –Full 12 FTE base required –Reduced level (2 FTE’s instead of 4-6) for experimental areas Indirect Charges –Reduced levels assumed for beam pre-ops phase –Full burdens assumed for operations phase

14 NSF Indirect Charges Pre-OpsOps* Salary40.2%98.2% Consultants17.5%46.5% DTS12.0%38.2% MSTC25.7%56.0% Subcontracts(>$25K)13.7%21.5% Subcontracts (>$600K)15.6%20.8% (only applies to first $600K) * Includes 3% full cost recovery

15 Beam Development Costs (fully burdened)

16 Beam Development Costs

17 Example Pre-operations Cost Beam Development Costs

18 Beam Development Costs – old plan (Jan 04)

19 RSVP Operations Cost

20 RSVP Operations Cost

21 Example Operations Cost RSVP Operations Cost

22 RSVP Operations Cost – an Example

23 Final Comments  RSVP operations and construction costs will not be subsidized by RHIC  Construction costs, although not yet finalized, are not expected to change significantly  Integration of all C-AD work for RSVP into RHIC operations and maintenance is in progress  RSVP beam development costs will be revisited once the plan is finalized  Additional RSVP operations staff will enhance RHIC operations  Ready for a year 2006 (or 2005) construction start