D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
1 The Forward Silicon Vertex Detector Upgrade for the PHENIX Experiment at RHIC Douglas Fields University of New Mexico Feb. 12, 2011 Douglas Fields, WWND11,
PHENIX FVTX Status of Mechanical and Thermal Design Work Eric Ponslet, Shahriar Setoodeh, Roger Smith HYTEC Inc. Los Alamos, NM May 2, 2007.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
TIPP Conference, June 10, Mechanics and Assembly of the Silicon Vertex Detector for PHENIX Walter Sondheim - LANL Mechanical Project Engineer; VTX.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
SSD Tasks and Costs Howard Matis October 14,
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 17-Nov-2010.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
M. Brooks, LANL 1 02/19/07 Review Schedule The FVTX upgrade project Melynda Brooks Silicon Sensor, Chip, ReadoutJon Kapustinsky Mechanics Walt Sondheim.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Aug 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
M. Brooks, LANL 1 Intro Goals: Status reports on each topic, to bring all collaborators up-to-date on work To-Dos for upcoming review, and following review,
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Craig Ogilvie Strip FEE electronics that are common between stripixel or conventional sensor choice Stripixel tests/plans to establish manufacturability.
Jun 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
Melynda Brooks, FVTX Closeout Review, April FVTX Project Overview Cost & Schedule Deliverables Melynda Brooks Los Alamos National Laboratory FVTX.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Status: R&D: Scientific and Technical Resources Technical Design Overview Design status R&D Cost and.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
SPHENIX Silicon Tracker 2015/10/20 Japan Korea PHENIX collaboration meeting Y. Akiba (RIKEN)
SPHENIX Silicon Tracker 2015/07/10 Radiation Lab meeting Y. Akiba (RIKEN)
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Melynda Brooks, FVTX Annual Review, November FVTX Project Overview Cost & Schedule Melynda Brooks Los Alamos National Laboratory FVTX Project Manager.
WBS 1.03 Readout Systems Scope, Cost and Schedule
Evidence for Strongly Interacting Opaque Plasma
Low Mass mechanical design
10/month is the present production rate 2 FTE + sporadic contributions
VTX readiness for RUN15 Y. Akiba.
Presentation transcript:

D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule

D. M. Lee, LANL 2 07/10/07 Mechanical structures – HYTEC estimate based on prior experience with VTX and ATLAS Sensors – Quotes from CIS, MICRON FPHX – FNAL estimate based on prior experience Electronics Interface DAQ – estimate based on prior experience Wire bonding – PROMEX quote DCM,slow controls, etc – Muon system experience, Steve Boose Cost Basis - Major Items

D. M. Lee, LANL 3 07/10/07 FVTX Schedule Assumptions Construction start – January 1, 2008 ( 2 nd QTR FY08) LANL R&D start - January 2006 BNL R&D start – October 2006 Schedule durations determined by engineering estimates, vendor quotes Duration of project made to match funding profile VTX and LDRD impact the schedule especially R&D Wedge assemblies tested at a rate of 3/day ( automated computer tests) Disk assembly assembled in 2 week, metrology of disk in 2 week Commissioning for 8 months

D. M. Lee, LANL 4 07/10/07 FVTX Major Cost Items Major ItemBase CostContingencySum Mechanical Ladder and support $416k 26%$524k Sensor $410k 26%$517k FPHX Chip $240k 36%$326k Wire bonding $188k 26%$237k ROC boards $443k 36%$603k FEM boards $323k 36%$440k HDI $111k 25%$139k Total Project (FY07) $3669k 25%$4595k

D. M. Lee, LANL 5 07/10/07 Schedule

D. M. Lee, LANL 6 07/10/07 Schedule

D. M. Lee, LANL 7 07/10/07 Schedule

D. M. Lee, LANL 8 07/10/07 Schedule

D. M. Lee, LANL 9 07/10/07 Cost

D. M. Lee, LANL 10 07/10/07 Funding Profile

D. M. Lee, LANL 11 07/10/07 Manpower Fraction 65% 35%